HomeMy WebLinkAbout2660083 - Final Grant
08/06/2026
To: Cormac Callan
Micheál Murtagh
Annavackey
Hackballscross
Dundalk
A91NA06
File Number - 26/60083
Planning and Development Act 2000 (as amended)
NOTIFICATION OF FINAL GRANT
Monaghan County Council has by order dated 01/05/2026 granted the above named, for
the development of land namely for:- permission to install a domestic wastewater
treatment system, and all associated site development works , at Aughrim More,,
Culloville PO, Co. Monaghan, subject to the 2 condition(s) set out in the Schedule
attached.
Signed on behalf of MONAGHAN COUNTY COUNCIL.
__________________________
ADMINISTRATIVE OFFICER
__________________________
DATE
I refer you to the Health and Safety Authority website www.hsa.ie for new responsibilities
for homeowners under Safety, Health and Welfare at Work (Construction) Regulations
2013.
08/06/2026
26/60083 Cormac Callan, Aughrim More,, Culloville PO, Co. Monaghan
1.
a) The proposed effluent treatment and disposal system shall be located, constructed
and maintained in accordance with the details submitted to the planning authority on
the 11/03/2026 and in accordance with the requirements of the document entitled
The Environmental Protection Agency Wastewater Treatment Manuals - Treatment
systems for small communities, Business, leisure Centres and Hotels. No system other
than the type proposed in the application shall be installed without the prior written
agreement of the Planning Authority.
b) A maintenance contract for the effluent treatment and disposal system shall be
entered into from the first date of occupancy of the dwelling and permanently
maintained thereafter. Signed and dated copies of the contract, which shall be for a
minimum period of 3 years, shall be submitted to, and agreed in writing with the
planning authority within 2 months of the installation.
c) Surface water soakaways shall be located such that the drainage from the dwelling
and paved areas of the site shall be diverted away from the location of the polishing
filter.
d) Within two months of the first occupation of the dwelling, the developer shall submit
a report from a suitably qualified person with professional indemnity insurance
certifying that the proposed effluent treatment and disposal system has been installed
and commissioned in accordance with the approved details and is working in a
satisfactory manner and that the polishing filter is constructed in accordance with the
standards set out in the EPA document.
Reason: In the interest of public health and environmental protection.
2.
The development shall be carried out in accordance with plans and documentation submitted
to the Planning Authority on the 11/03/2026, except as otherwise required in order to comply
with the above conditions.
Reason: To ensure a satisfactory standard of development.
BUILDING CONTROL ADVICE NOTE
Before Any Building Works Commence - Things you should check!
1. Building Control Legal Requirements - Commencement Notice & Fire Safety Certificates (FSC);
In accordance with the Building Regulations you are obliged to submit a Commencement Notice prior to
commencement of a development and it must be submitted not less than 14 days and not more than 28 days
before you wish to commence. The Commencement Notice must be submitted to the Local Authority via the
online national portal BCMS. Applicants are advised to register on this website in advance of submitting a
commencement notice via the attached link: www.localgov.ie/en/bcms
As the type of Commencement Notice required will vary depending on your proposed development, you are
advised to seek advice from your agent or architect on what type of commencement notice is relevant to your
proposed works. Alternatively please feel free to contact Monaghan Fire & Building Control Authority for
advice at 047-30521 or email: bcms@monaghancoco.ie
Please be advised that works can not begin until the applicant has received a valid commencement notice from
the Building Control Authority, and that it is an offence under the Building Control Act 1990 to proceed with the
works without a valid commencement notice and/or a valid FSC (if required for works/development).
2. Pre-Development Conditions;
If there are any Pre-Development conditions on the schedule of conditions attached to your permission you
should give your immediate attention to them prior to the commencement of your development.
N.B. All conditions must be complied with in full as failure to do so will render your permission invalid and
may result in the initiation of enforcement proceedings for compliance with same.
3. Construction Products Regulations (SI No 225 of 2013);
You need to ensure that you, your builder, your designer/assigned certifier and your suppliers are familiar with
the requirements of the Construction Products Regulations.
For more information, please see link provided below.
https://monaghan.ie/firebuildingcontrol/building-control-construction-products-regulation/
4. Responsibilities under the Safety, Health and Welfare at Work (Construction) Regulations 2013;
The regulations are to ensure that there is a safe working environment for all involved in the construction
works, including dwellings.
For more information;
http://www.hsa.ie/eng/Publications_and_Forms/Publications/Construction/Guide_for_Homeowners.html