Loading...
HomeMy WebLinkAbout2660011 - F.I. Received Doc. - Flood Risk Assessment Main Street, Castleblayney, Co. Monaghan, Ireland www.cspringle.com Phone: (042) 9746492 Fax: (042) 9746511 info@cspringle.com Xisting Stage/Revision: Author: Checked: Issued: Marcus Dancey Eamonn McMullen 4th June 2026 Flood Risk Assessment and Site Use Constraints Padraig & Elaine Ward Derrynaloobinagh, Meeting House Lane, Ballybay, Co Monaghan TITLE: CLIENT: LOCATION: RECEIVED: 08/06/2026 ____________________________________________________________________________________________ Page 2 of 9 Rev: Preliminary Flood Risk Assessment Padraig & Elaine Ward Re:– Preliminary Flood Risk Assessment and Site Use Constraints at Derrynaloobinagh, Meeting House Lane, Ballybay, Co Monaghan for Padraig & Elaine Ward Introduction This report has been prepared at the request of our client Padraig and Elaine Ward in support of a planning retention application relating to existing buildings and yard areas located at Derrynaloobinagh, Meeting House Lane, Ballybay, Co. Monaghan. The purpose of this assessment is to:  review available flood risk information relating to the site.  consider predicted flood levels affecting the existing development.  compare estimated flood levels with surveyed floor levels.  assess the compatibility of the existing and proposed use with the identified flood risk.  identify appropriate flood resilience and operational measures. This assessment has been prepared as a preliminary flood risk assessment using available OPW CFRAM flood mapping and associated model output data together with site survey information. No independent hydraulic modelling has been undertaken as part of this assessment. Site Description The subject site comprises an existing developed yard and associated buildings located at, Derrynaloobinagh, Meeting House Lane, Ballybay, Co. Monaghan. The site is located adjacent to low-lying lands associated with the local floodplain and Lough Major lake system on the Dromore River system and portions of the site fall within areas identified by OPW flood mapping as being susceptible to flooding during significant flood events. The existing development comprises hardstanding yard areas together with existing buildings. RECEIVED: 08/06/2026 ____________________________________________________________________________________________ Page 3 of 9 Rev: Preliminary Flood Risk Assessment Padraig & Elaine Ward Site map shows the site outlined in red and location of the buildings relative to the river. The floor level of the building is 79.735mOD. RECEIVED: 08/06/2026 ____________________________________________________________________________________________ Page 4 of 9 Rev: Preliminary Flood Risk Assessment Padraig & Elaine Ward Topographical Survey and Existing Floor Levels and site levels Ground levels and finished floor levels within the site were established by topographical survey and compared against predicted flood levels derived from OPW flood mapping and associated model outputs. Available Flood Risk Information Flood risk information for the site has been obtained from the OPW CFRAM flood mapping and associated node data for the area. RECEIVED: 08/06/2026 ____________________________________________________________________________________________ Page 5 of 9 Rev: Preliminary Flood Risk Assessment Padraig & Elaine Ward OPW Flood Extent Mapping with Relevant Node Identified as 3602M00035 The OPW flood mapping indicates that portions of the site lie within the predicted flood extents associated with both the 1% AEP and 0.1% AEP flood events. Associated OPW model outputs provide predicted flows and flood levels at a number of relevant model nodes within the floodplain system. Assessment Table Showing OPW node reference 3602M00035, with 10% AEP level of 79.16mOD and 18.36m³/s flow, 1% AEP level of 79.77mOD 32.18m³/s flow and the 0.1% AEP level of 80.69mOD 55.50m³/s flow. RECEIVED: 08/06/2026 ____________________________________________________________________________________________ Page 6 of 9 Rev: Preliminary Flood Risk Assessment Padraig & Elaine Ward Methodology The OPW model outputs provide predicted flows and water levels for the 10% AEP, 1% AEP and 0.1% AEP flood events for this location. For the purposes of this assessment, climate change impacts were considered by applying a Mid-Range Future Scenario (MRFS) flow factor of 1.2 to the OPW 1% AEP flow. A High-End Future Scenario (HEFS) factor was also reviewed for comparison purposes. A fitted relationship derived from the OPW flow-frequency outputs was then used to estimate the equivalent present-day return period associated with the climate-adjusted flow. A second fitted relationship between return period and flood level was subsequently used to estimate the corresponding flood level. This approach allows the OPW model outputs to be used to derive indicative climate-change- adjusted flood levels without undertaking fresh hydraulic modelling. The derived levels should therefore be regarded as planning-level estimates based on interpretation of the OPW model outputs rather than independently modelled design flood levels. Given the level of study undertaken by the OPW within Ballybay, the model outputs are considered appropriate for planning-level assessment purposes. Estimated Flood Levels The following table summarises the relevant OPW model outputs together with the estimated climate-change-adjusted flood levels and comparison against existing finished floor levels. Table gives the MRFS and the HEFS levels of water and height above the floor level of the estimated flood level for a 100-year event with climate change taken into account. The 100-year flow is multiplied by 1.2 or 1.3 to get the climate change adjusted flow. This is then used to obtain the return period for that flow. Knowing the return period for that flow we can obtain the level to which the flooding is likely to come. This is compared against the existing floor level and the depth of water likely for each scenario. RECEIVED: 08/06/2026 ____________________________________________________________________________________________ Page 7 of 9 Rev: Preliminary Flood Risk Assessment Padraig & Elaine Ward The OPW model outputs indicate predicted flood levels in the order of approximately 79.77mOD for the present-day 1% AEP event and approximately 80.69mOD for the 0.1% AEP event. Application of climate change flow factors results in estimated flood levels generally intermediate between the present-day 1% AEP and 0.1% AEP model outputs, namely approximately 80.07mOD and 80.21mOD for the MRFS and HEFS respectively. The estimated climate-change-adjusted flood levels exceed the existing finished floor level of the building by approximately 0.33m and 0.47m for the MRFS and HEFS respectively. Flood Risk and Site Use The mechanism of flooding at this location is not rapid flow across the site, but rather gradual rise in water levels associated with the wider floodplain and lake system. Due to the scale of the lake basin and floodplain storage area, inundation occurs relatively slowly, allowing time for operational response measures to be implemented. In practical terms, this means that flooding of portions of the site may occur during significant flood events and there is no proportionate engineering solution available that would fully exclude floodwaters from the site without introducing wider impacts or requiring disproportionate works. Accordingly, the approach proposed is not a flood-defence approach, but rather a flood-resilient approach whereby:  periodic inundation of portions of the site is acknowledged  building construction and site operation are adapted to accommodate flooding  no increase in flood risk arises elsewhere  no pollution risk arises during flood events The existing buildings and yard construction are generally consistent with a flood-resilient approach, comprising predominantly concrete construction and hardstanding capable of wash- down and reinstatement following inundation. However, the suitability of the site is dependent not only on the physical resilience of the buildings, but also on the management and operation of the site during flood conditions. In particular:  potentially contaminating materials should not be stored at low level within areas susceptible to flooding  oils, fuels, lubricants and similar materials should be stored above predicted flood levels and within suitable bunded arrangements RECEIVED: 08/06/2026 ____________________________________________________________________________________________ Page 8 of 9 Rev: Preliminary Flood Risk Assessment Padraig & Elaine Ward  electrical installations and vulnerable equipment should be located above predicted flood levels where practicable  vulnerable stored items should be capable of removal or protection during significant flood events It is proposed that storage systems within the buildings incorporate raised lower storage levels such that the bottom pallet or equipment storage level is located approximately 350mm to 500mm above finished floor level. This would place vulnerable or potentially contaminating materials above the estimated climate-change-adjusted flood levels derived within this assessment. Such an approach allows the buildings themselves to remain flood-resilient while reducing the risk of damage, contamination or loss arising from periodic inundation. Residual Risks Residual flood risk remains associated with:  uncertainty inherent in flood modelling and interpolation of flood levels. This is partly mitigated through consideration of the High-End Future Scenario and by maintaining vulnerable items above approximately 500mm above finished floor level.  future climate variability. This is partly mitigated through consideration of the High-End Future Scenario and by maintaining vulnerable items above approximately 500mm above finished floor level.  potential blockage or reduced conveyance within the wider floodplain and drainage system. Given the size of the Dromore river between Ballybay and Cootehill this is not considered to be a significant residual risk.  operational management of the site during flood conditions. This is mitigated by a good warning system and management plan being implemented to ensure that no vulnerable items are threatened and to minimise the risk of contamination of flood waters. Conclusion Based on the available OPW flood mapping, associated model outputs and surveyed floor levels, the site is located within an area potentially affected by flooding during significant flood events. Indicative climate-change-adjusted flood levels have been estimated through interpretation of the OPW model outputs and comparison with surveyed floor levels. RECEIVED: 08/06/2026 ____________________________________________________________________________________________ Page 9 of 9 Rev: Preliminary Flood Risk Assessment Padraig & Elaine Ward The proposed approach is based on flood resilience rather than flood exclusion, acknowledging that periodic inundation may occur while ensuring that building construction, site layout and operational management are compatible with the identified flood risk. Subject to appropriate operational controls and flood-resilient measures, including the storage of vulnerable or potentially contaminating materials above predicted flood levels, the existing development may be considered capable of continued use without giving rise to unacceptable flood risk or pollution risk elsewhere. Chartered Engineer for C S Pringle RECEIVED: 08/06/2026