HomeMy WebLinkAbout2660057 - Report Received from Internal Staff - EnvironmentENVIRONMENTAL REPORT To: Martina Smith (Environment Section – A/Executive Scientist). From: Peter Deery (Environment Section – Water Team). Re: 26/60057 Magheracloone Mitchells GAA Club Permission: Permission sought by Magheracloone Mitchells GAA Club to construct a proposed single storey detached Gym Facility building, Retain single storey extension to front of existing dressing room, existing accessible toilet to side of the existing dressing room facility building and all associated site works at Lisnakeeny & Camaghy, Magheracloone, Carrickmacross, Co. Monaghan. Location Lisnakeeny & Camaghy, Magheracloone, Carrickmacross, Co. Monaghan. Date: 29/05/2026 Background The following additional information was requested: a) Submit a fully completed Water Protection Plan checklist. A completed Water Protection Plan checklist has been submitted as part of the further information received. b) Submit a wastewater characterisation report to include volumes of all wastewaters to be generated by the proposed development. The report shall consider the relevant EPA Code of Practice. A Site Characterisation Report prepared by Traynor Environmental Ltd that was prepared for the existing wastewater treatment system has been submitted. The existing system consists of a 16 P.E BAF treatment system together with soil polishing filter and percolation area. The system has a maximum discharge rate of 1,360 litres/day. In the response to the further information requested, Mitchell Environmental have confirmed that no additional wastewater will be generated over the volumes calculated when designing the existing wastewater treatment system. c) Submit an assessment of the existing wastewater treatment system and percolation area. i. The assessment shall demonstrate the capacity of the existing wastewater treatment system to treat the proposed wastewater loadings prior to discharge to percolation area. ii. The assessment shall demonstrate the suitability of the existing percolation area to further treat wastewater from the treatment system. iii. If necessary, the assessment shall include proposals for upgrade of the system to serve the proposed development; Or; Details of an agreement with Uisce Éireann for connection to the public sewer. iv. The assessment and proposals shall take account of the requirement of the relevant EPA Code of Practice and shall be prepared by a suitably qualified person. An installation report by Mitchell Environmental for the treatment system has been supplied as part of the additional information. The report confirms that a 16 P.E Kingspan Klargester wastewater treatment system, soil polishing filter and percolation area has been installed. d) Demonstrate that the discharge will not cause deterioration in water quality of the receiving water body in accordance with the requirements of the European Communities Environmental Objectives (Groundwater) Regulations, 2010 (S.I. No. 9 of 2010) (Groundwater Regulations); and /or the European Communities Environmental Objectives (Surface Water) Regulations, 2009 (S.I. No. 272 of 2009). The Site Characterisation Report has calculated the daily discharge to be 1,630 litres, which is below the requirement for a Discharge Licence under Section 4 of the Local Government (Water Pollution) Act, 1977. The wastewater treatment system is also discharging to groundwater via a soil polishing filter and percolation area. Recommendation I have no objection to planning subject to the following conditions: a) One month prior to the commencement of the development, the applicant shall submit a Construction and Demolition and By-Products Waste Management Plan for the proposed development works. The plan shall be prepared using “Best Practice Guidelines for the preparation of resource & waste management plans for construction and demolition projects” – EPA, 2021. b) Any construction and demolition waste or excess soil generated during the construction phase which cannot be reused on site in accordance with Section 3 (1)(c) and Section 39 (1) of the Waste Management Act 1996 as amended, shall be disposed/recovered at an appropriately permitted facility in accordance with the requirements of the Waste Management Act 1996 as amended using authorised waste collectors authorised to collect the type of material for disposal/recovery at authorised treatment facilities. c) Facilities shall be provided for the collection and segregation of recyclable waste. Waste shall be collected for recycling/reuse whenever feasible or otherwise disposed of in accordance with the Waste Management Act 1996 as amended. d) One month prior to commencement of the development, the developer shall submit a Construction and Environmental Management Plan (CEMP). This plan shall be sufficient to demonstrate that adequate measures will be in place for the construction phase to ensure there is no discharge of polluting matter/sediment laden waters to any waters. The Construction and Environmental Management Plan shall take account of best practice and the guidance produced by Inland Fisheries Ireland titled “Guidelines on Protection of Fisheries during Construction Works in and Adjacent to Waters 2016”. The CEMP shall include the location details of the monitoring points where daily visual checks and weekly surface water monitoring (physical& chemical parameters) shall be carried out during the construction phase. The plan shall include the details of a suitably qualified person appointed to oversee the implementation of the plan. e) Monaghan County Council and Inland Fisheries Ireland shall be informed immediately of an accidental spillage of sediment laden waters, fuel, machine oil or any polluting discharge which may threaten the quality of any watercourse or groundwater body. f) The applicant shall ensure completely separate foul and surface water drainage systems are in place. g) The onsite wastewater treatment system and percolation area shall be maintained in accordance with manufacturers specifications and shall be desludged as necessary. h) Any fuels, oils, greases, hazardous liquid wastes, and hydraulic fluids within the site area shall be stored on site, away from any watercourses in a bunded, leak-proof, and lockable storage area. Note that bunds are to be designed to contain 110% of the capacity of the largest storage container located within the bund. There shall be no overflow drain facility from any bunds on site and all filling and off-take points shall be located within a bund. i) Material storage, fuel handling, parking areas and other yard activities shall be managed in a manner which prevents the discharge of polluting matter to ground or surface water. Signed: Date: 29/05/2026 Peter Deery A/Senior Executive Technician Approved by: Date: 08/06/26