Loading...
HomeMy WebLinkAbout2557 - Report Received from Internal Staff - Environment ENVIRONMENTAL REPORT To Planning From: Martina Smith, Environment Section Ref: 25/57 Padraig Sherry, Agheracalkill Agent: Niall Mc Kenna Permission to extend existing poultry unit, erect a new manure store, connect to storage tanks, reposition meal bins, open new entrance on to public road and all associated site works. The proposed development site is located on an area of low groundwater vulnerability which is underlain by a Locally Important Bedrock Aquifer that is Moderately Productive only in Local Zones. The site is located within the Blackwater Monaghan_10 waterbody and the Scotstown _20 waterbody. The Blackwater Monaghan_10 is classifled as Good status 2016-2021, this waterbody is currently at Review status, Agriculture and Urban Wastewater have been listed as signiflcant pressures, the WFD objective for this waterbody is “Protect from Deterioration”. The Scotstown_20 was classifled as High status 2016-2021 and has a WFD objective of “Protect from Deterioration. It is important that the site is managed in a manner which does not impact on surrounding water quality. The additional information in red below was requested on this application 1. A fully completed agricultural application form. A fully completed agricultural application form has been included with FI. 2. The proposed number of birds to be housed on site after the proposed development. The FI response from CLW planners’ details that the existing and proposed bird numbers will be unchanged at 39,955 birds. It is proposed to replace the existing caged system with a muti tier aviary/barn with weekly manure removal to manure store. 3. A signed letter from a registered contractor for the collection of all poultry manure arising from the development or details on the outlet for all poultry manure arising from this facility. Details shall be sufficient to demonstrate compliance with the European Union (Good Agricultural Practice for Protection of Waters) Regulations, 2022 as amended. A letter and a copy of the contractor registration with DAFM have been included with FI. 4. A detailed assessment to demonstrate how it is proposed to provide 26-week storage capacity for hen manure and associated seepage in accordance with the requirements of the with the European Union (Good Agricultural Practice for Protection of Waters) Regulations, 2022 as amended. It is detailed in the FI response that 27-week manure storage will be provided onsite. It is detailed that the proposed manure store can store 881.72m3 and the volume produced in a 26-week period is 842.4m3 of manure, 5. Details on the volume of wash waters produced per annum (m3) It is detailed in the FI response that no >40m3 of soiled water will be produced after every 16-month cycle. 6. Details on how it is proposed to collect and store all wash waters from the poultry unit and the manure storage on site during wash out operations in accordance with the requirements of the European Union (Good Agricultural Practice for the Protection of Waters) Regulations, 2022. Conflrm the dimensions of the existing and proposed wash water tanks. It is detailed that 22.72m3 of capacity is available for the storage of soiled waters arising from the development. It is detailed that soiled water will be used on the applicants own holding, maps of land and N & P statements have been included with FI. 40m3 of soiled water will increase the Organic N on the holding to 141.8kgN/yr. 7. Submit an up-to-date Nutrient Management Plan Assessment demonstrating how it is proposed to utilise wash waters arising from the proposed development in accordance with the European Union (Good Agricultural Practice for Protection of Waters) Regulations, 2022 as amended. It is detailed that soiled water will be used on the applicants own holding, maps of land and N & P statements have been included with FI. It has been demonstrated that 8. A revised site layout plan (1:500) clearly showing the following: a. All existing and proposed surface/storm water drainage systems (outlined in blue). b. All associated surface/ storm discharge points and outfalls. c. The directional fiow of all surface water pipelines. d. The location of sustainable urban drainage measures to be installed on the storm water drainage system. e. The wash water / manure seepage drainage system (in red) to include the following: (i) the discharge route for washings from the poultry unit (ii) seepage from the manure store to tank A revised site drainage plan has been included with FI. 9. Details/specification of the sustainable urban drainage measures to be installed on the storm water system. Revised site drainage plan shows a silt trap on the storm line. However, no design details have been included it is recommended that these are submitted prior toc commencement of development. 10. Submit details on the outlet for dead birds arising from the proposed development. A letter from Michael Galligan a registered contractor has been included with the application. 11. Details of the atmospheric emissions from the existing units (kgN/yr) and the proposed atmospheric emissions from the proposed development (kgN/yr). Details included with FI note no increase in bird places as a result of the proposed development and note a decrease in ammonia emissions as a result of the proposed development. FI details existing ammonia emissions of 0.315kg/bird place and the proposed ammonia emission of 0.14kg/bird place. I have no objection to planning subject to the following conditions: ENV 1 GAPPW Regulations The development shall be operated in accordance with the European Union (Good Agricultural Practice for Protection of Waters) Regulations, 2025 Reason: In the interest of environmental protection and public health. ENV 2 Building specification All buildings shall be designed and built in accordance with Department of Agriculture, Food & the Marine speciflcations. Reason: In the interest of orderly development. ENV 3 Collection of contaminated and soiled water. (i) contaminated surface water run-off shall be collected in a sealed system (ii) all soiled waters shall be directed to a leak proof storage tank (iii) no effluent or slurry shall discharge or be allowed to discharge to any stream, river, watercourse, groundwater body or to the public road. (iv) All contaminated surface water arising on the concrete aprons shall discharge to an appropriately sized leak-proof tank. All drainage works shall be carried out in accordance with these agreed details. (v) All soiled waters shall be collected, stored and utilised in accordance with the European Union (Good Agricultural Practice for Protection of Waters) Regulations, 2025. Reason: In the interest of environmental protection and public health. ENV 4 Disposal of uncontaminated surface water a) All uncontaminated roof water from buildings and yard water shall be separately collected and discharged in a sealed system to existing drains, streams or adequate soakpits and shall not discharge or be allowed to discharge to the foul effluent drains, foul effluent and slurry storage tanks or to the public road. b) An inspection manhole shall be installed for sampling and inspection purposes and shall be located on the surface/storm water line prior to discharge from the site. c) Prior to commencement of development submit for agreement with the planning authority details of the silt trap to be installed on the storm drainage line and proposals for the ongoing maintenance of same. Reason: In the interest of environmental protection and public health. ENV 5 Storage of Organic Fertiliser All organic fertiliser generated by the development hereby approved [and existing development within the farmyard] shall be conveyed through properly constructed channels to the proposed [and existing] storage facilities and shall not discharge or be allowed to discharge to any stream, river, watercourse, groundwater body or public road in accordance with the requirements of the European Union (Good Agricultural Practice for Protection of Waters) Regulations, 2025. ENV 6 Utilisation of Organic Fertiliser and Soiled Water All organic fertiliser and soiled water generated by the proposed development shall be utilised in accordance with the details submitted to the Planning Authority on the 18th of August and in accordance with the European Union (Good Agricultural Practice for Protection of Waters) Regulations, 2025. Reason: In the interest of environmental protection and public health. ENV 7 Contractor/Haulier Organic fertiliser shall be taken offsite by the contractor/haulier as stated in the planning application. This contractor must be registered with the Department of Agriculture Food and Marine and the organic fertiliser shall be utilized in accordance with the requirements of the European Union (Good Agricultural Practice for Protection of Waters) Regulations 2025. Any changes in contractor shall be agreed in writing with the Planning Authority. Reason: In the interest of environmental protection and public health. ENV 8 Poultry/Livestock Type & Numbers There shall be no change in poultry type or increase in the numbers of poultry being accommodated at this site unless otherwise agreed in writing with the Planning Authority. Reason: In the interest of orderly development. ENV 9 Waste Management a) Any construction and demolition waste or excess soil generated during the construction phase which cannot be reused on site in accordance with Section 3 (1)(c) and Section 39 (1) of the Waste Management Act 1996 as amended, shall be disposed/recovered at an appropriately permitted facility in accordance with the requirements of the Waste Management Act 1996 as amended using authorised waste collectors authorised to collect the type of material for disposal/recovery at authorised treatment facilities. b) If infllling material is required to be imported onsite the applicant shall conform to one of the following; i. Economic operator shall utilise EPA Article 27 By-Product notiflcation in moving greenfleld soil and stone material from one site to another. Official copy of Registration from the EPA noting soil movements shall be submitted to the Planning Authority prior to commencement of development or ii. If using waste material as inflll and prior to acceptance of material a valid permit must be issued by Monaghan County Council under the Waste Management (Facility Permit and Registration) Regulations 2007 as amended. or iii. Buy topsoil material as a product for flnal landscaping purposes only. Documentation demonstrating purchase shall be submitted to Planning Authority. c) Prior to commencement submit to Environment services, a site speciflc Construction & Demolition Resource Management plan for approval. Applicant to consider Best Practice Guidelines for the preparation of Resource & Waste Management Plans for construction and demolition projects. d) All waste oils and any other hazardous waste materials shall be stored appropriately and collected, recovered or disposed of in accordance with the Waste Management Act 1996 as amended, and records of such shall be kept on site. e) (i) All hazardous liquid waste or oil/fuel storage containers, temporary or otherwise, shall be bunded. (ii) All bunds will be designed to contain 110 % of the capacity of the largest storage container located within the bund. (iii) There shall be no overfiow drain facility from any bunds on site and all fllling and off- take points shall be located within a bund. f) Facilities shall be provided for the collection and segregation of recyclable waste. Wastes shall be collected for recycling/reuse whenever feasible or otherwise disposed of in accordance with the Waste Management Act, 1996 as amended. Reason: In the interest of environmental protection and public health. ENV 10 Pollution Control The applicant shall immediately inform the Planning Authority & Inland Fisheries Board of an accidental spillage of wastewater, organic fertiliser, fuel, machine oil or any other substance which may threaten the quality of any watercourse or groundwater body. Reason: In the interest of environmental protection and public health ENV 11 Pollution Control (Construction Phase) a) Prior to the commencement of development, the applicant shall submit a Construction and Environmental Management Plan (CEMP) for agreement. This plan shall be sufficient to demonstrate that adequate measures will be in place for the construction phase to ensure there is no discharge of polluting matter/sediment laden waters to any waters. The Construction and Environmental Management Plan shall take account of best practice and the guidance produced by Inland Fisheries Ireland titled “Guidelines on Protection of Fisheries during Construction Works in and Adjacent to Waters 2016”. The CEMP shall include the location details of the monitoring points where daily visual checks and weekly surface water monitoring (physical& chemical parameters) shall be carried out. b) The applicant shall ensure that mitigation measures outlined in the CEMP are implemented and that adequate measures are in place for any construction phase to ensure there is no discharge of polluting matter/sediment laden waters to any watercourse. Reason: In the interest of environmental protection and public health. ENV 14 Ammonia Abatement Within six months from date of grant of planning permission, an ammonia management programme outlining ammonia reduction measures, including timeframes for implementation, appropriate for the site, shall be submitted to the planning authority. The ammonia management programme shall be reviewed annually and a copy of the reviewed ammonia management programme shall be submitted annually to Monaghan County Council by December 31st . The reduction in ammonia emissions from the site using Best Techniques (BAT) shall be detailed in the annual ammonia management programme Available. Reason: In the interest of environmental protection and public health. Signed: Date: 08/06/2026