Loading...
HomeMy WebLinkAbout2560386 - Chief Executives OrderMONAGHAN COUNTY COUNCIL PLANNING AND DEVELOPMENT ACT 2000 (as amended) Chief Executive's Order No: P569-26 Reference Number: 25/60386 Name of Applicant: Cavan & Monaghan Education Training Board Address: Kieran O'Reilly Monaghan Road Castleblayney Co. Monaghan A75 EP84 Nature of Application: Permission to extend existing GAA pitch to include excavation of in - earth material and re -use of same on site to remodel playing pitch, new goal posts, new enclosed ball wall playing area, new generator room, new ball stopping nets, new cowled floodlighting, a new retaining wall and demolition of old ticket box building together with all ancillary and associated site works Location of Development: Connabury/Onomy Castleblayney Co. Monaghan nRnFR- I hereby decide, pursuant to the provisions of the Planning and Development Act 2000 (as amended) and the Planning and Development Regulations 2001 (as amended) to grant permission for the above development in accordance with documents submitted, subject to the 6 condition(s) set out in the Schedule attached hereto. I further decide that PERMISSION be granted subject to the same conditions on the expiration of the period for the taking of an appeal to An Coimisiun Pleanala against this decision if there is then no appeal before An Coimisiun Pleanala. Adrian Hughes SENIOR PLANNER IO .c6 - Z.4 Date 25/60386 Cavan & Monaghan Education Training Board, Connabury/Onomy, Castleblayney, Co. Monaghan 1. During the construction phase, the developer shall ensure that all public roads and footpaths adjacent to the site are kept free from mud, debris and other materials associated with the works. Any such material deposited on the public road shall be removed immediately. Reason: In the interest of traffic safety and residential amenity. 2. Ball -stop netting shall be provided behind both goal areas in accordance with the submitted site layout plan and same shall be retained and maintained in good condition. Reason: In the interest of public safety and residential amenity. 3. The proposed floodlighting shall be installed and thereafter operated in accordance with the details submitted, including the lighting report, specifications, and anti -glare measures. All fittings shall be cowled and positioned so as to minimise light spill and glare beyond the site boundaries. All floodlights shall cease to operate between the hours of 22:30 and 08:00. Reason: In the interests of residential amenity and orderly development. 4. (a) All landscaping works, including planting, boundary treatments, and the retention and enhancement of existing hedgerows, shall be carried out in accordance with the submitted landscaping details during the first planting season following completion of the development. (b) Any trees or plants which die, are removed or become seriously damaged or diseased within a period of five years from completion of the development shall be similarly replaced in the next planting season. (c) Existing hedgerows and boundary vegetation along the site perimeter shall be retained and protected during construction, except where removal is necessary to facilitate the development hereby permitted. Any such areas shall be reinstated as part of the landscaping scheme. Reason: In the interest of visual amenity and appropriate design. 5. Surface water drainage shall be provided and maintained in accordance with the submitted drainage details. All surface water shall discharge to the existing drainage network as proposed, and no surface water shall be permitted to discharge onto the public road. Reason: In the interest of appropriate design and to prevent flooding or nuisance. 6. The development shall be carried out strictly in accordance with the plans and documents submitted on the 24/09/2025 as amended on the 19/05/2026, except as may otherwise be required in order to comply with the above conditions. Reason: In the interest of proper planning and sustainable development. Adrian Hughes Date Senior Planner