HomeMy WebLinkAbout2560504 - F.I. Received Doc. - Application - Cover Letter
Owen Finegan B.Sc. (Hons.) MCIOB | Wayne Geary B.Sc. (Hons.) MSCSI MRICS
Finegan Jackson Building Surveyors Limited
12th June 2026
Mr Ben Clerkin
Planning Department
Monaghan County Council,
1 Dublin Street,
Monaghan,
Co. Monaghan
RE: Danny Collins – Planning Reference 25/60504.
Further Information in relation to Permission for development at this site: Magheross,
Carrickmacross, Co. Monaghan. The development will consist of; Retention of modular
staff building and storage shed extension, construction of vehicle maintenance shed,
connections to existing services and all associated site works.
Dear Ben,
We are in receipt of your request for additional information dated 10th February 2026. We
attach the following documents with this response:
1. This cover letter including:
a. Supporting Information for F.I. Response 1
b. Previously Granted Planning Permissions Compliance Report
c. Photographic Schedule
2. OAK Enviro CCTV Drainage Survey Report
3. OAK Enviro Drainage Map
4. Traynor Environmental Ltd Resource & Waste Management Plan
5. Planning Reference Number 17/331 – Final Grant
6. Planning Reference Number 18/15 – Final Grant
7. Planning Reference Number 19/151 – Final Grant
For clarity, the previous applicable planning applications are summarised as follows;
• 17/331 – Permission granted for site to be used for coach and car parking.
• 18/15 – Permission granted for static bus wash unit.
• 19/151 – Permission granted for static bus wash unit, workshop, signage, diesel storage
and the retention of a general store to service the bus wash.
THE STABLES,
DRUMCONRATH ROAD,
CARRICKMACROSS,
CO. MONAGHAN.
A81 YX28
Telephone: (042) 9662275
E-mail: info@fineganjackson.ie
Website: www.fineganjackson.ie RECEIVED: 12/06/2026
Owen Finegan B.Sc. (Hons.) MCIOB | Wayne Geary B.Sc. (Hons.) MSCSI MRICS
Finegan Jackson Building Surveyors Limited
We wish to respond to the further information request as received;
Further Information Request No. 1
Policy RAP 1 of the County Development Plan 2025-2031 states that development which has
the potential to detrimentally impact on the residential amenity of properties in the vicinity shall
be resisted.
The site layout plan identifies adjacent dwellings immediately beside the operational yard, and
the proposal includes a new open maintenance bay. An open bay increases potential for
impacts on nearby residential receptors.
To safeguard the residential amenity of nearby dwellings and allow for a fully informed decision,
please submit an Amenity Impact Assessment, or equivalent supporting information, which
shall include the following:
a) Proposed hours of operation for the maintenance shed and the open
maintenance bay.
b) Description of noise-generating activities (engine testing, pneumatic/air tools,
reversing alarms, etc).
c) Mitigation measures to protect nearby dwellings (operational limits, acoustic
measures, engine-testing protocols, yard management).
d) Details of any external lighting proposed, including type and mounting height,
confirmation of full cut-off design, and demonstration of zero overspill beyond
the site.
The assessment should demonstrate that the development would not detrimentally impact on
the residential amenity of properties in the vicinity.
Supporting Information
a) The client proposes to use the development between the hours of 07:00 and 23:00, 7
days a week in compliance with 19/151 final grant.
b) The proposed shed will be used for minor maintenance, such as, changing bulbs,
valeting coaches, routine inspections, cleaning and parts replacement. The client has
confirmed that they outsource major maintenance and servicing to the main
dealerships.
No engine testing/revving will be conducted on site. The client will demonstrate a
preference for electric/battery tools over pneumatic tools. Any pneumatic/air tools will be
limited for short duration use and only be used in the enclosed shed, with the door
closed. There is a yard speed limit of 10km/h and designated routes will reduce noise.
The shed will allow staff to work on vehicles under a roof out of the elements, and tools
will be to hand.
c) The maintenance the client is proposing to conduct is no more than what is currently
executed in the bus yard, and as such, the new shed will not produce any additional
noise generated.
d) The client does not intend on erecting any additional yard lighting on the site, except for
internal lighting in the shed. The existing yards lights are satisfactory and are directed
downwards to prevent overspill.
The above proposals will ensure to protect the nearby residential receptors in compliance
with Policy RAP 1 of the Monaghan County Council Development Plan 2025 – 2031.
RECEIVED: 12/06/2026
Owen Finegan B.Sc. (Hons.) MCIOB | Wayne Geary B.Sc. (Hons.) MSCSI MRICS
Finegan Jackson Building Surveyors Limited
Further Information Request No. 2
To allow the Planning Authority to confirm that the existing development on-site has been
carried out in accordance with previous permissions and that the current proposal does not
conflict with earlier requirements, please submit a concise compliance report detailing the
status of all relevant conditions attached to planning permission file numbers 17/331, 18/15,
and 19/151, including:
a) A condition-by-condition table confirming:
I. Fully complied.
II. Complied in part.
III. Not complied (with acceptable explanation).
b) Supporting photographic evidence, and engineer/competent-person certification where
applicable.
Previously Granted Planning Applications Compliance Report
Planning File No. 17/331
Condition No.1 – Fully complied.
Condition No.2 – Fully complied.
Condition No.3 – Fully complied. Construction of the office to the South-West and parking to
the North of the site did not commence. A new bus wash facility, including drainage, was
installed in the proceeding application, 19/151.
Condition No.4 – Fully complied. Our client has acquired a contract with Irish Water.
Condition No.5 –
a. Fully complied.
b. Fully complied.
c. Fully complied.
d. Fully complied. Ad-Blue tank is a double-skinned bunded tank. Photo attached.
e. Fully complied.
Condition No.6 – Fully complied. All flood lights are pointed in a downward fashion and
minimise any negative effects on the surrounding environment. Photo attached.
Condition No.7 –
a. Fully complied.
b. Fully complied.
c. Fully complied. RECEIVED: 12/06/2026
Owen Finegan B.Sc. (Hons.) MCIOB | Wayne Geary B.Sc. (Hons.) MSCSI MRICS
Finegan Jackson Building Surveyors Limited
d. Fully complied.
e. Complied in part. The North-East entrance/exit complies in full, however the South-West
entrance/exit has a concrete surface of approximately 3 meters, instead of the required
5 meters.
f. Complied in part. No French drains have been installed; however, storm water concerns
have been addressed. Metal gulleys are provided to the North-East entrance/exit, and
the concrete surface has been graded so that surface water flows to the gulley. There is
a metal gulley on the road at the South-West entrance/exit to carry away stormwater
also.
g. Fully complied. See above comment. Photos attached.
h. Fully complied.
i. Fully complied.
j. Fully complied.
Condition No.8 – Fully complied.
Condition No.9 – Fully complied.
Condition No.10 –
a. Fully complied.
b. Complied in part – Several trees on the South boundary have been removed as they
were identified as a risk of falling on to parked coaches. Several trees had collapsed in
previous storms as they had deteriorated due to the ash dieback disease. As coaches
are parked adjacent to this boundary, applicant removed the remaining trees before
they fall as this would have been a certainty. The applicant has agreed to plant a hedge
and new native trees in this location. Photo attached.
c. Not complied. No planting has occurred on the site.
Condition No.11 – Fully complied with exception to any comments above.
Planning File No. 18/15
This planning file is for permission to install a static bus unit; however, it was not acted upon,
and the bus unit was installed as part of Planning Ref 19/151. Therefore, 18/15 has been
superseded by 19/151.
RECEIVED: 12/06/2026
Owen Finegan B.Sc. (Hons.) MCIOB | Wayne Geary B.Sc. (Hons.) MSCSI MRICS
Finegan Jackson Building Surveyors Limited
Planning File No. 19/151
Condition No. 1 – Fully complied. The client informed us that a fee of €861.00 was paid. They
had a phone call with Monaghan County Council discussing that €530.00 was paid in respect of
planning ref. 18/15, and that this was to be deducted from planning ref. 19/151 contribution fee
of €1,391.00.
Condition No. 2 – Fully complied.
Condition No. 3 –
a. Fully complied.
b. Fully complied.
c. Fully complied.
Condition No. 4 – Fully complied. Our client has acquired a contract with Irish Water.
Condition No. 5
a. Fully complied.
b. Fully complied.
c. Fully complied.
d. Fully complied.
e. Fully complied. Photo attached.
f. Fully complied.
g. Fully complied. Photo attached.
h. Fully complied. Photo attached.
i. Fully complied. Photo attached.
j. No underground fuel lines are present onsite.
k. Fully complied. Ad-Blue tank is a double-skinned bunded tank. Photo attached.
l. Fully complied. Documents submitted as part of this FI request.
m. Fully complied. Photo attached.
n. Fully complied. Photo attached.
o. Fully complied. No waste oils currently present onsite.
p. Fully complied.
q. Fully complied. Document submitted as part of this FI request.
r. Noted and will comply should the need arise.
s. Not complied. Spill kits, trays and absorbent material will be provided as part of this
application and will be installed in the maintenance shed.
t. Fully complied.
RECEIVED: 12/06/2026
Owen Finegan B.Sc. (Hons.) MCIOB | Wayne Geary B.Sc. (Hons.) MSCSI MRICS
Finegan Jackson Building Surveyors Limited
Condition No. 6 –
a. Fully complied. Photos attached showing sightlines to both the North-East and South-
West entrances/exits.
b. Fully complied. Photo attached.
c. Fully complied. Photo attached.
d. Complied in part. Photo attached.
e. Fully complied. Gulleys provided to both entrances/exits.
f. Fully complied.
g. Fully complied.
h. Fully complied.
Condition No. 7 – Fully complied.
Condition No. 8 – Fully complied.
Condition No. 9 –
a. Fully complied.
b. Fully complied.
c. Not complied. No planting has occurred on the site. We have informed the applicant that
landscaping is to be completed in compliance with the granted planning application.
Condition No. 10 – Fully complied with exception to any comments above.
Should you require any further assistance, please do not hesitate to contact me.
Yours Sincerely,
Joe Mc Cabe
Surveyor
B.Sc. (Hons.) DipFD
RECEIVED: 12/06/2026
Owen Finegan B.Sc. (Hons.) MCIOB | Wayne Geary B.Sc. (Hons.) MSCSI MRICS
Finegan Jackson Building Surveyors Limited
Appendix ‘A’
Photograph Schedule of Conditions
RECEIVED: 12/06/2026
Owen Finegan B.Sc. (Hons.) MCIOB | Wayne Geary B.Sc. (Hons.) MSCSI MRICS
Finegan Jackson Building Surveyors Limited
Planning Reference 17/331:
Condition 5. d – Doublie-skinned ad-blue tank
Condition 6 – Floodlights
RECEIVED: 12/06/2026
Owen Finegan B.Sc. (Hons.) MCIOB | Wayne Geary B.Sc. (Hons.) MSCSI MRICS
Finegan Jackson Building Surveyors Limited
Condition 7. g – North-East entrance/exit gulley
Condition 7. g – South-West entrance/exit gulley
RECEIVED: 12/06/2026
Owen Finegan B.Sc. (Hons.) MCIOB | Wayne Geary B.Sc. (Hons.) MSCSI MRICS
Finegan Jackson Building Surveyors Limited
Condition 9 – New yard and turning area kept tidy and free from obstructions
Condition 10. b – Fall-risk trees removed trees along South-East boundary
RECEIVED: 12/06/2026
Owen Finegan B.Sc. (Hons.) MCIOB | Wayne Geary B.Sc. (Hons.) MSCSI MRICS
Finegan Jackson Building Surveyors Limited
Planning Reference 19/151:
Condition 5. b – 5-meter riparian buffer zone
Condition 5. e – Storm drainage feeds into recyclable tank
RECEIVED: 12/06/2026
Owen Finegan B.Sc. (Hons.) MCIOB | Wayne Geary B.Sc. (Hons.) MSCSI MRICS
Finegan Jackson Building Surveyors Limited
Condition 5. a – Approximate location (North-East) of foul manhole connecting to public sewer
Condition 5. g/h – Silt trap and interceptor manholes
RECEIVED: 12/06/2026
Owen Finegan B.Sc. (Hons.) MCIOB | Wayne Geary B.Sc. (Hons.) MSCSI MRICS
Finegan Jackson Building Surveyors Limited
Condition 5. I – Interceptor warning device
Condition 5. m – Bin storage area
RECEIVED: 12/06/2026
Owen Finegan B.Sc. (Hons.) MCIOB | Wayne Geary B.Sc. (Hons.) MSCSI MRICS
Finegan Jackson Building Surveyors Limited
Condition 5. n – Hazardous liquid storage area with bund.
Condition 6. a – South-West entrance/exit – Carrickmacross town sightline
RECEIVED: 12/06/2026
Owen Finegan B.Sc. (Hons.) MCIOB | Wayne Geary B.Sc. (Hons.) MSCSI MRICS
Finegan Jackson Building Surveyors Limited
Condition 6. a – South-West entrance/exit – Drumconrath road sightline
Condition 6. a – North-East entrance/exit – Carrickmacross town sightline
RECEIVED: 12/06/2026
Owen Finegan B.Sc. (Hons.) MCIOB | Wayne Geary B.Sc. (Hons.) MSCSI MRICS
Finegan Jackson Building Surveyors Limited
Condition 6. a – North-East entrance/exit – Ardee Road sightline
Condition 6. b – North-East entrance/exit – Trees & hedges removed
RECEIVED: 12/06/2026
Owen Finegan B.Sc. (Hons.) MCIOB | Wayne Geary B.Sc. (Hons.) MSCSI MRICS
Finegan Jackson Building Surveyors Limited
Condition 6. c/d – North-East entrance/exit – Concrete bell mouth entrance
Condition 6. c/d – South-West entrance/exit – Concrete bell mouth entrance
RECEIVED: 12/06/2026