Loading...
HomeMy WebLinkAbout2660060 - F.I. Maps - ElevationsGSPublisherVersion 2098.0.84.99 OES Office of Elliott Swetak 505 P-01 Scale: Drawn by:E. Swetak ISSUE APPDDATEDESCRIPTION As indicated @ A1 15/06/2026 Issue: PROJECT DETAILS for Drawing No. Document Name: Project Orginator Volume Level Type Role Project Number: Date: CLIENT NAME PROJECT STAGE PROJECT NORTH Unless otherwise specified NOTES ALL DIMMESNIONS TO BE TAKEN ON SITE NO DIMENSIONS TO BE SCALED FROM THIS DRAWING ANY DISCREPANCIES TO BE REPORTED TO THE ARCHITECT FOR CLARIFICATION. THIS DRAWING MAY NOT BE COPIED OR REPRODUCED WITHOUT WRITTEN CONSENT. NO WORKS SHOULD BE CARRIED OUT WITHOUT PRIOR CONSENT FROM THE LOCAL PLANNING AUTHORITY PLEASE NOTE THAT THIS IS A PLANNING DRAWING ONLY AND THEREFORE LIMITED IN ITS CAPACITY TO CONVEY THE TOTAL INFORMATION, DETAILS & SPECIFICATIONS NECESSARY TO COMPLETE THE WORKS. ANY WORK CARRIED OUT THAT IS NOT SPECIFIED OR DETAILED HERE WILL BE THE RESPONSIBILITY OF THE PERSONS CARRYING THEM OUT. IF AMY SITUATION ARISES WHCIH WOULD CAUSE A CONTRAVENTION OF THE BUILDING REGUALTIONS, THEN THE ARCHITECT SHOULD BE CONSULTED. OTHERWISE THE ARCHITECT CANNOT BE HELD RESPONSIBLE. ALL WORK AND MATERIALS ARE TO BE IN ACCORDANCE WITH CURRENT BUILDING REGULATIONS WHETHER DETAILED ON THIS DRAWING OR NOT. Skervan, Smithborough, Monaghan Co. Monaghan Ireland w: officeofelliottswetak.com e: elliottswetak@gmail.com n: 00353863165351 BOG-OES-00-ZZ-DR-A 26001- 5 5 4 4 3 3 2 2 1 1 11 22E-08S-05S-052,726 5,1051,900 2,905900 2,10015,125 5,8505,056 5,125 5,000 5,000 20,881 873 1,800 902 1,050 431 1,150 3,500 1,000 1,050 1,125 1,800 2,750 1,800 1,650 20,881 6,5505,8055,805Purple line shows outline of previous Constructed Changing rooms from the 1980s - changing rooms were knocked and rebuilt with additional floor area as the building was unfit for purpose Gym A: 88.5 m2 Store A: 13.9 m2 Toilet area A: 5.5 m2 1 2 5,850 2,8903,500Mural to gable wall 2 1 5,850 3,4722,8905 4 3 2 1 5,000 5,000 5,125 5,056 3,4723,4061 2 3 4 5 5,056 5,125 5,000 5,000 3,4062,1002,5002,1002,5255503,4722 1 3,4722,890GYM Ground Floor Plan Gym 1:50 Side Elevation (North)1:50 Side Elevation (South)1:50 Rear Elevation (East)1:50 Front Elevation (West)1:50 Building Section S-03 1:50 GYM BUILDING TO BE RETAINED P-02 12/06/2026 Issued to Monaghan CoCo ESRECEIVED: 15/06/2026