Loading...
HomeMy WebLinkAbout2660057 - Chief Executives OrderMONAGHAN COUNTY COUNCIL PLANNING AND DEVELOPMENT ACT 2000 (as amended) Chief Executive's Order No: P612-26 Reference Number Name of Applicant Address: 26/60057 Magheracloone Mitchells GAA Club Niall Smith Hall Street Kingscourt u rt Co. Cavan A82 I<8A0 Nature of Application: Permission sought by Magheracloone Mitchells GAA Club to construct a proposed single storey detached Gym Facility building, Retain single storey extension to front of existing dressing room, existing accessible toilet to side of the existing dressing room facility building and all associated site works at Lisnakeeny & Camaghy, Magheracloone, Carrickmacross, Co. Monaghan Location of Development: ORDER: Lisnakeeny & Camaghy Magheracloone, Carrickmacross Co. Monaghan I hereby decide, pursuant to the provisions of the Planning and Development Act 2000 (as amended) and the Planning and Development Regulations 2001 (as amended) to grant permission for the above development in accordance with documents submitted, subject to the 6 condition(s) set out in the Schedule attached hereto. I further decide that PERMISSION be granted subject to the same conditions on the expiration of the period for the taking of an appeal to An Coimisiun Pleanala against this decision if there is then no appeal before An Coimisiun Pleanala. Adrian Hughes SENIOR PLANNER 1S •a6 ^ ? Date 26/60057 Magheracloone Mitchells GAA Club, Lisnakeeny & Camaghy, Magheracloone, Carrickmacross, Co. Monaghan 1. a) Prior to the commencement of development the applicant shall submit to the Planning Authority, for agreement in writing, a Construction and Demolition and By -Products Waste Management Plan, having regard to EPA publication 'Best Practice Guidelines for the preparation of Resource and Waste Management Plans for construction and demolition projects' (2021). b) The development shall be carried out in accordance with the details agreed under (a) above. Reason: In the interests of environmental protection and to ensure that the development is carried out in an orderly and planned manner. 2. a) Prior to the commencement of development the applicant shall submit to the Planning Authority for agreement in writing, a Construction and Environmental Management Plan (CEMP) having regard Inland Fisheries Ireland guidance entitled 'Guidelines on Protection of Fisheries during Construction Works in and Adjacent to Waters' (2016). The submitted CEMP shall include the following; (i) Adequate measures for the construction phase to ensure there is no discharge of polluting matter/sediment laden waters to any waters Locational details of the monitoring points where daily visual checks and weekly surface water monitoring (physical and chemical parameters) shall be carried out during the construction phase, and; (ii) Details of a suitably qualified person appointed to oversee the implementation of the plan. b) The development shall be carried out in accordance with the details agreed under (a) above. Reason: In the interests of environmental protection and to ensure that the development is carried out in an orderly and planned manner. 3. a) Any construction and demolition waste or excess soil generated during the construction phase which cannot be reused on site in accordance with Section 3 (1)(c) and Section 39 (1) of the Waste Management Act 1996 as amended, shall be disposed/recovered at an appropriately permitted facility in accordance with the requirements of the Waste Management Act 1996 as amended using authorised waste collectors authorised to collect the type of material for disposal/recovery at authorised treatment facilities. b) Facilities shall be provided for the collection and segregation of recyclable waste. Waste shall be collected for recycling/reuse whenever feasible or otherwise disposed of in accordance with the Waste Management Act 1996 as amended. c) Monaghan County Council and Inland Fisheries Ireland shall be informed immediately of an accidental spillage of sediment laden waters, fuel, machine oil or any polluting discharge which may threaten the quality of any watercourse or groundwater body. d) The applicant shall ensure completely separate foul and surface water drainage systems are in place. e) The onsite wastewater treatment system and percolation area shall be maintained in accordance with manufacturers specifications and shall be desludged as necessary. f) Any fuels, oils, greases, hazardous liquid wastes, and hydraulic fluids within the site area shall be stored on site, away from any watercourses in a bunded, leak -proof, and lockable storage area. Note that bunds are to be designed to contain 110% of the capacity of the largest storage container located within the bund. There shall be no overflow drain facility from any bunds on site and all filling and off -take points shall be located within a bund. g) Material storage, fuel handling, parking areas and other yard activities shall be managed in a manner which prevents the discharge of polluting matter to ground or surface water. Reason: In the interests of environmental protection and to ensure that the development is carried out in an orderly and planned manner. 4. The development/facility shall be used solely in connection with events associated with Magheracloone Mitchells GAA Club and shall not be used for commercial activities such as concerts or other similar events. Reason: In the interests of residential amenity. 5. No signs, flags, logos or other advertising material/illumination shall be erected or displayed on -site or along the roadside without prior permission from the Planning Authority. Reason: In the interest of visual amenity. 6. The development shall be retained and carried out strictly in accordance with the plans and documents submitted on the 25/02/2026 as amended on the 28/05/2026, except as may otherwise be required in order to comply with the above conditions. Reason: In the interest of proper planning and sustainable development. Adrian Hughes Senior Planner Date