HomeMy WebLinkAbout2660057 - Chief Executives OrderMONAGHAN COUNTY COUNCIL
PLANNING AND DEVELOPMENT ACT 2000 (as amended)
Chief Executive's Order No: P612-26
Reference Number
Name of Applicant
Address:
26/60057
Magheracloone Mitchells GAA Club
Niall Smith
Hall Street
Kingscourt
u rt
Co. Cavan
A82 I<8A0
Nature of Application: Permission sought by Magheracloone Mitchells GAA Club to construct
a proposed single storey detached Gym Facility building, Retain single
storey extension to front of existing dressing room, existing accessible
toilet to side of the existing dressing room facility building and all
associated site works at Lisnakeeny & Camaghy, Magheracloone,
Carrickmacross, Co. Monaghan
Location of Development:
ORDER:
Lisnakeeny & Camaghy
Magheracloone, Carrickmacross
Co. Monaghan
I hereby decide, pursuant to the provisions of the Planning and Development Act 2000 (as amended)
and the Planning and Development Regulations 2001 (as amended) to grant permission for the above
development in accordance with documents submitted, subject to the 6 condition(s) set out in the
Schedule attached hereto.
I further decide that PERMISSION be granted subject to the same conditions on the expiration of the
period for the taking of an appeal to An Coimisiun Pleanala against this decision if there is then no
appeal before An Coimisiun Pleanala.
Adrian Hughes
SENIOR PLANNER
1S •a6 ^ ?
Date
26/60057 Magheracloone Mitchells GAA Club, Lisnakeeny & Camaghy, Magheracloone,
Carrickmacross, Co. Monaghan
1.
a) Prior to the commencement of development the applicant shall submit to the Planning Authority,
for agreement in writing, a Construction and Demolition and By -Products Waste Management Plan,
having regard to EPA publication 'Best Practice Guidelines for the preparation of Resource and
Waste Management Plans for construction and demolition projects' (2021).
b) The development shall be carried out in accordance with the details agreed under (a) above.
Reason: In the interests of environmental protection and to ensure that the development is carried
out in an orderly and planned manner.
2.
a) Prior to the commencement of development the applicant shall submit to the Planning Authority
for agreement in writing, a Construction and Environmental Management Plan (CEMP) having
regard Inland Fisheries Ireland guidance entitled 'Guidelines on Protection of Fisheries during
Construction Works in and Adjacent to Waters' (2016). The submitted CEMP shall include the
following;
(i) Adequate measures for the construction phase to ensure there is no discharge of polluting
matter/sediment laden waters to any waters
Locational details of the monitoring points where daily visual checks and weekly surface water
monitoring (physical and chemical parameters) shall be carried out during the construction
phase, and;
(ii) Details of a suitably qualified person appointed to oversee the implementation of the plan.
b) The development shall be carried out in accordance with the details agreed under (a) above.
Reason: In the interests of environmental protection and to ensure that the development is carried
out in an orderly and planned manner.
3.
a) Any construction and demolition waste or excess soil generated during the construction phase
which cannot be reused on site in accordance with Section 3 (1)(c) and Section 39 (1) of the Waste
Management Act 1996 as amended, shall be disposed/recovered at an appropriately permitted
facility in accordance with the requirements of the Waste Management Act 1996 as amended using
authorised waste collectors authorised to collect the type of material for disposal/recovery at
authorised treatment facilities.
b) Facilities shall be provided for the collection and segregation of recyclable waste. Waste shall be
collected for recycling/reuse whenever feasible or otherwise disposed of in accordance with the
Waste Management Act 1996 as amended.
c) Monaghan County Council and Inland Fisheries Ireland shall be informed immediately of an
accidental spillage of sediment laden waters, fuel, machine oil or any polluting discharge which may
threaten the quality of any watercourse or groundwater body.
d) The applicant shall ensure completely separate foul and surface water drainage systems are in place.
e) The onsite wastewater treatment system and percolation area shall be maintained in accordance
with manufacturers specifications and shall be desludged as necessary.
f) Any fuels, oils, greases, hazardous liquid wastes, and hydraulic fluids within the site area shall be
stored on site, away from any watercourses in a bunded, leak -proof, and lockable storage area. Note
that bunds are to be designed to contain 110% of the capacity of the largest storage container
located within the bund. There shall be no overflow drain facility from any bunds on site and all
filling and off -take points shall be located within a bund.
g) Material storage, fuel handling, parking areas and other yard activities shall be managed in a manner
which prevents the discharge of polluting matter to ground or surface water.
Reason: In the interests of environmental protection and to ensure that the development is carried
out in an orderly and planned manner.
4.
The development/facility shall be used solely in connection with events associated
with Magheracloone Mitchells GAA Club and shall not be used for commercial activities such as concerts
or other similar events.
Reason: In the interests of residential amenity.
5.
No signs, flags, logos or other advertising material/illumination shall be erected or displayed on -site or
along the roadside without prior permission from the Planning Authority.
Reason: In the interest of visual amenity.
6.
The development shall be retained and carried out strictly in accordance with the plans and documents
submitted on the 25/02/2026 as amended on the 28/05/2026, except as may otherwise be required in
order to comply with the above conditions.
Reason: In the interest of proper planning and sustainable development.
Adrian Hughes
Senior Planner
Date