Loading...
HomeMy WebLinkAbout2660177 - Report Received from Internal Staff - Fire Monaghan Fire & Civil Protection Monaghan Fire Station Annahagh Monaghan Co. Monaghan 18/06/2026 Planning Section, Monaghan County Council, The Glen, Monaghan Planning App. Ref. No. 26/60177 Applicant Macartan View Limited Retention Permission is sought for the following works: •Works for plot units 24-27 inclusive to include for retention of works to subfloor level as constructed. Permission is sought for the following works: •A revised unit mix for units 1-27 to provide for a total of 8 no. 2bed and 19 no. 3bed dwellings (change of house types from units as granted); •Associated reconfiguration of curtilage works associated with units 1-27 inclusive; •Amendments to façade and design of units 1-27; No objections to the Planning Application subject to the following conditions: 1. The proposed building works shall comply with the requirements of the Building Control Regulations (As Amended). Commencement Notice to be submitted via BCMS. 2. The design and construction of each dwelling shall comply with current Building Regulations and specifically Technical Guidance Document Vol 2 Part B 2017 of the Building Regulations with particular attention to the means of escape, separating wall detail between dwellings, and provision of cavity barriers. 3. All siteworks shall be completed in accordance with the recommendations set out in DoECLG publication “Recommendation for Site Development Works” including the provision of Fire Hydrants to ensure that no dwelling is located more than 46.0m from a Fire Hydrant. 4. Fire Hydrants shall be in accordance with BS 750:2012 and shall deliver a minimum rate of flow as per Monaghan Fire & Civil Protection ‘Guidance document for fire-fighting water supplies’. 5. Fire Brigade Vehicle access to the proposed development shall be provided in accordance with Clause 5.4 including Table 5.3 of Technical Guidance Document Part B 2017 Fire Safety - Volume 2 Dwelling Houses including provision of turning facilities for appliances in dead-end access routes more than 20.0m long. 6. The proposed development shall be designed and constructed in accordance with Technical Guidance Document Part M 2010 (Access & Use) of the Second Schedule of the Building Regulations, 1997-2022. Regards, Dermot Brannigan Chief Fire Officer