Loading...
HomeMy WebLinkAbout2660172 - F.I. Request Letter 19/06/2026 Nigel Lowey C/O Paraic Fay The Mews 23 Farnham St Cavan, H12 T9W2 Re: Planning and Development Act 2000 (as amended). Planning and Development Regulations 2001 (as amended). 26/60172 - planning permission for an alteration to / increase in, the approved stock numbers (as provided for under condition No. 2e of permission Ref: 18/360 & 239007 (currently in construction)) previously granted by Monaghan Co. Co., together with all ancillary structures and associated site works, on and or adjacent to an existing poultry farm. This application relates to a development, which is for the purposes of an activity requiring a Licence under part IV of the Environmental Protection Agency (Licensing) Regulations 1994 to 2013. An Environmental Impact Assessment Report (EIAR) will be submitted with this planning application at Avalreagh Clontibret Co. Monaghan. _______________________________________________________ Dear Sir/Madam, With reference to the above application, I am to inform you that the information submitted is not adequate to enable a decision to be made. In accordance with the provisions of Article 33 of the Planning and Development Regulations 2001 (as amended) you are hereby requested to submit further information as set out on the attached page. Article 33(3) states that “where a requirement under sub-article (1) or sub-article (2) (Clarification) is not complied with within the period of 6 months from the date of the requirement for further information, or such additional period, not exceeding 3 months, as may be agreed by the Planning Authority, the planning application shall be declared to be withdrawn”. It should be noted that you will be required to give notice in an approved newspaper under article 35(1)(a) and erect a site notice in accordance with Article 35 (1)(b) of the Planning and Development Regulations 2001 (as amended) if the further information received is considered to contain significant additional data. Please Note: 4 copies of Additional Information to be submitted. In the case of Significantly Different Information, 6 copies of additional information to be submitted. Yours faithfully, __________________________ ADMINISTRATIVE OFFICER pp 26/60172 Nigel Lowey Avalreagh, Clontibret, Co. Monaghan ADDITIONAL INFORMATION 1. The application as submitted is considered insufficient in terms of environmental information. In this regard the applicant is requested to submit; a) A fully completed supplementary Agricultural planning application form. b) Submit details on the design of the proposed silt trap and the outfall location for storm waters arising on site. Proposals for the storm water drainage system should take account of the Department of Housing, Local Government and Heritage guidance document on Nature-based Solutions to the Management of Rainwater and Surface Water Runoff in Urban Areas. c) Confirm if there will be any change in the volume of wash waters generated as a result of the proposed increase in bird places. d) Submit revised maps clearly indicating the lands available for the spreading of wash waters arising from the existing and proposed development, details submitted shall contain sufficient detail to demonstrate compliance with the European Union (Good Agricultural Practice for the Protection of Waters) Regulations, 2025 and shall include the most recent DAFM N & P statements for the lands in question. e) Submit a revised letter from the registered contractor for the collection of poultry manure arising from the development which clearly details if the contractor is in a position to accept the additional manure produced as a result of the proposed increase in bird places. f) Submit details of arrangements/storage facilities available for the manure arising from the development during the prohibited period for land spreading of organic fertilisers as set out in the European Union (Good Agricultural Practice for the Protection of Waters) Regulations, 2025. 2. The Planning Authority notes that the works associated with the proposed development primarily comprise internal modifications together with the installation of a multi-tier/platform rearing system. The Environmental Impact Assessment Report (EIAR) does not provide details of any increase in soiled water arising from the proposed increase in stock numbers. However, it is considered that the cleaning of the multi-tier/platform rearing system is likely to result in increased water usage and, consequently, increased volumes of soiled water. Accordingly, the applicant is requested to address the following: a) Provide an updated assessment of water supply requirements associated with the proposed development; b) Demonstrate that adequate land spreading is available to accommodate any additional soiled water generated. 3. The Planning Authority notes that the Environmental Section has requested further information. The applicant shall update the submitted EIAR accordingly. The planner dealing with this application is Liam Ward