Loading...
HomeMy WebLinkAbout2560508 - F.I. Received Doc. - Waste Treatment System Wastewater Treatment System Design Specification Client: The Tyrone Guthrie Centre at Annaghmakerrig Address: Annaghmakerrig House, Mullaghmore, Newbliss, Co. Monaghan, H18 PP70 Project Type: Wastewater Treatment System Upgrade Design Specification. Reference: 250711. Date: 12.05.26 Scope Mitchell Environmental Ltd. have been requested by The Tyrone Guthrie Centre at Annaghmakerrig to produce a design specification for the upgrade of the wastewater treatment system at the above site. All calculations are based on a Site Characterisation Assessment carried out by Oliver Farrelly of Arc Design Services and allowing for constraints in relation to available area for percolation. As part this wastewater treatment system upgrade, it is proposed to collect all of the domestic effluent generated on-site via a new 50 PE BAF Wastewater Treatment System before discharging to Tertiary Sand Polishing Filter Bed. The existing wastewater tan ks will be retained and retrofitted into additional primary settlement tanks. The design and calculations follow the EPA code of practice on treatment systems for small communities, business, leisure centres and hotels, 1999 and the EPA code of practice 2021. Figure 1. Site location map 1 RECEIVED: 19/06/2026 Wastewater Treatment Loadings 2 RECEIVED: 19/06/2026 Figure 2. Wastewater Loadings. The details contained above outline the maximum wastewater loading rates from the development. 3 RECEIVED: 19/06/2026 Design of the proposed Wastewater Treatment Plant Following the design calculations (fig.2), it is proposed to install a 5 0 PE SBAF Wastewater Treatment System. Please refer to the Wastewater Treatment System Proposal and drawings provided by O’Reilly Oakstown Environmental in the Appendix for more detail. The complete installation should be overseen by a suitable, competent and qualified person(s). Figure 3. Proposed 50 PE Wastewater Treatment Plant. Existing Wastewater Treatment Plant The existing WWTP is to be desludged and cleaned by a registered contractor and be used as an additional primary storage which will form part of the overall upgrade. 4 RECEIVED: 19/06/2026 Design of disposal of treated wastewater to ground Based on the PV rates contained within the Site Characterisation Report by Arc Design, the tertiary polishing filter proposed will be 1250 sqm with dimensions of 62.5m x 20.0m. Please refer to drawings below for more detail. Soil polishing filter details Soil polishing filter: 1250 sqm Sand polishing filter: 150 sqm Invert level: 0.4m below GL Finished level: 0.9m above CL Design Flow: 7’840 Litres/day Pressurised Pipework: 32mm perforated lateral pipes 50mm distribution manifold Distribution zones: 1 no. zone Geotextile Membrane (Permeable): PB1000 Rising Main: 50m approx. Percolation aggregates specification Gravel: 15mm-25mm washed gravel with void ratio of 0.4 installed to a total depth of 400mm. EPA approved bio sand. Installation Oversight The installation is to be carried out as per EPA Code of Practice and all works should be overseen by a suitable and competent person. Final report with photographs and as-built drawings to be provided upon completion Mitchell Environmental are fully insured for Public Liability (€2,600,000) and Private Indemnity. (€1,300,000). Yours Sincerely, ______________ Gordon Mitchell Director 5 RECEIVED: 19/06/2026 Appendix Supporting Documents & Drawings 6 RECEIVED: 19/06/2026 The Tyrone Guthrie Centre Annaghmakerrig House, Newbliss, Co. Monaghan, H18 PP70 Arts Organsisation TBC ltrs/day ltr/day TBC ltr/hr TBC min/hr hr/day Max. influent concentration as per EPA waste water treatment manuals After tertiary treatment 531 20 925 20 1748 20 13 1 95 3 6-9 100 5 30 2 1).Design criteria adopted from EPA waste water manual for primary,secondary,tertiary treatment Flow ltrs/d BOD g/day Industrial 0 0 0 0 0 0 0 0 0 0 0 0 Open industrial site (quarry) full time staffOpen industrial site (quarry) part time staff Office and/or factory no canteen, part time staffOffice and/or factory w canteen full time staffOffice and/or factory w canteen part time staff 3).*Design criteria adopted from British Water CoP Reccomended Wastewater Loading Rates From Commercial Premises Situation Source Population Office and/or factory no canteen, full time staff 0 Ammonia as N 3 Comments: 2).Design criteria adopted from EPA waste water manual for small communities, business, leisure centres and hotels pH Oil Fats Greases 5 O-PO4 1 Total N 5 BOD5 20 COD 20 Parameter [mg/l]Prior to treatment After secondary treatment SS 30 NO3 Max/day Average period during which emissions are made , including daily or seasonal variations 0 24 7 Wastewater characteristics Normal/day TBC Maximum/day Max.rate/hour BOD Max/day Wastewater Characterisation Form 20-500PE (Population Equivalent) Site Details: Type of activity: Quantity of disinfection chemicals used: Emission Details :estimated volume to be emitted 7 RECEIVED: 19/06/2026 School pupils 0 0 0 0 6300 2100 420 210 180 90 Hostel Accomodation 0 0 0 0 0 0 180 60 0 0 0 0 400 200 Restaurant full meals 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 Total 7480 2660 PE 50 44 WWTP TO BE DESIGNED = 50 PE static fully serviced tent sites Nursing homes (convalescent)* Health/Spa centre* Caravan sites touring not serviced static not serviced shower/use* golf club ( players) rugby/footbal club* drivers/visitors toilet WC /use* toilet (urinal)/flush* toilet (lorry park)/use* Bar drinkers Bar meals Amenity sites toilet blocks/flush* Pubs and Clubs Resident staff full time staff part time staff fast food roadside bar fast food burger chain* function rooms prepared catering snack bars function rooms part time staff day conference guest 10 luxury catering Guest (no meals) Security 1 full time staff part time staff 6 Guests 3&4star Guests 5star* no cooking Accomodation Residents 35 full time staff 7 cooking on-site 8 RECEIVED: 19/06/2026 R o a d Inv 0.1plas=109.18 FENCE 150M2 PROPOSED RAISED SAND POLISHING FILTER (15M X 10M) MH PROPOSED TERTIARY SAND POLISHING FILTER GRASS LAWN GRASS LAWN EXISTING SEWAGE TREATMENT SYSTEM TO BE RETAINED AS PRIMARY BALANCING TANKS PROPOSED 50PE SEWAGE TREATMENT SYSTEM 1250M2 PROPOSED GRAVEL INFILTRATION BED (62.5M X 20M) PROPOSED 50MM RISING MAIN PROPOSED MAG FLOW METER MH SEWAGE INLET SUMP MH Proposed Sewage Treatment System for The Tyrone Guthrie Centre at Annaghmakerrig, Mullaghmore, Newbliss, Co. Monaghan, H18 PP70 9 RECEIVED: 19/06/2026 Inlet Ø160mm AA LAYOUT PLAN SECTION A-A Inlet Ø160mm piping Ø110mm Oakstown, Trim, Co. Meath, Eircode C15 X499 Lo call: 1850 200 702 Tel: +353 (0) 46 943 1389 info@oreillyoakstown.com www.oreillyoakstown.com O'REILLY OAKSTOWN ENVIRONMENTAL Commercial & Residential Wastewater Treatments Systems & Septic Tanks CLIENT: PROJECT: TITLE: O'REILLY OAKSTOWN ENVIRONMENTAL SCALE: DATE: DRAWING NO.: STATUS: DRAWN BY: REVISION: SR 66 POPULATION EQUIVALENT 50 PE GENERAL PLAN AND SECTION THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL RELEVANT DRAWINGS AND SPECIFICATIONS. DO NOT SCALE FROM THIS DRAWING. FIGURE DIMENSION ONLY TO BE USED. ALL DIMENSIONS ARE IN MILLIMETERS EXCEPT WHERE SHOWN. ANY DISCREPANCIES ON THIS DRAWING OR ON SITE ARE TO BE REPORTED TO THE O'REILLY GROUP. THIS DRAWING IS THE PROPERTY OF O'REILLY GROUP, IT IS A CONFIDENTIAL DOCUMENT AND MUST NOT BE COPIED, OR ITS CONTENT DIVULGED WITHOUT PRIOR WRITTEN CONSENT. NTS @ A4 DECEMBER 2023 OAKS/50/08/01 PROGRESS YOGEESH.B.E10 RECEIVED: 19/06/2026 Drwg No : Mobile: 087-9609975 www.mitchellenvironmental.ie G. M The Tyrone Guthrie Centre at Annaghmakerrig Annaghmakerrig House, Mullaghmore, Newbliss, Co. Monaghan, H18 PP70 Proposed Tertiary Polishing filter Plan Drawing. MIT_250711_P1.0 D. McMNTS @ A3 01.05.26 250711. e-mail: gordon@mitchellenvironmental.ie Drawn By : Checked: Client: Address: Title: Office: 046-9055642 Tankardrath, Kilberry, Navan, Co. Meath Project Name and Address Date: Scale : File Ref : 11 RECEIVED: 19/06/2026 Drwg No : Mobile: 087-9609975 www.mitchellenvironmental.ie G. M The Tyrone Guthrie Centre at Annaghmakerrig Annaghmakerrig House, Mullaghmore, Newbliss, Co. Monaghan, H18 PP70 Proposed Tertiary Polishing filter Cross Section Drawing. MIT_250711_P2.0 D. McMNTS @ A3 01.05.26 250711. e-mail: gordon@mitchellenvironmental.ie Drawn By : Checked: Client: Address: Title: Office: 046-9055642 Tankardrath, Kilberry, Navan, Co. Meath Project Name and Address Date: Scale : File Ref : 12 RECEIVED: 19/06/2026 SUDS analysis Flexible Liquid storage Flood Control Solutions Surface Water solutions Hydrocarbon Separation Hydrocarbon Separation Environmental Solutions Water treatment and control Hydrocarbon Storage Solutions Attenuation/Soakaway Products Specialised Percolation Installations Providing Sustainable and Progressive Sewage Treatment analysis and reports www.mitchellenvironmental.ie 13 RECEIVED: 19/06/2026