Wastewater Treatment System Design Specification
Client:
The Tyrone Guthrie Centre at
Annaghmakerrig
Address:
Annaghmakerrig House,
Mullaghmore,
Newbliss,
Co. Monaghan,
H18 PP70
Project
Type:
Wastewater Treatment System Upgrade
Design Specification.
Reference: 250711.
Date: 12.05.26
Scope
Mitchell Environmental Ltd. have been requested by The Tyrone Guthrie Centre at
Annaghmakerrig to produce a design specification for the upgrade of the wastewater
treatment system at the above site.
All calculations are based on a Site Characterisation Assessment carried out by Oliver
Farrelly of Arc Design Services and allowing for constraints in relation to available area for
percolation.
As part this wastewater treatment system upgrade, it is proposed to collect all of the
domestic effluent generated on-site via a new 50 PE BAF Wastewater Treatment System
before discharging to Tertiary Sand Polishing Filter Bed. The existing wastewater tan ks will
be retained and retrofitted into additional primary settlement tanks. The design and
calculations follow the EPA code of practice on treatment systems for small communities,
business, leisure centres and hotels, 1999 and the EPA code of practice 2021.
Figure 1. Site location map
1 RECEIVED: 19/06/2026
Wastewater Treatment Loadings
2 RECEIVED: 19/06/2026
Figure 2. Wastewater Loadings. The details contained above outline the maximum wastewater loading rates
from the development.
3 RECEIVED: 19/06/2026
Design of the proposed Wastewater Treatment Plant
Following the design calculations (fig.2), it is proposed to install a 5 0 PE SBAF Wastewater
Treatment System. Please refer to the Wastewater Treatment System Proposal and
drawings provided by O’Reilly Oakstown Environmental in the Appendix for more detail. The
complete installation should be overseen by a suitable, competent and qualified person(s).
Figure 3. Proposed 50 PE Wastewater Treatment Plant.
Existing Wastewater Treatment Plant
The existing WWTP is to be desludged and cleaned by a registered contractor and be
used as an additional primary storage which will form part of the overall upgrade.
4 RECEIVED: 19/06/2026
Design of disposal of treated wastewater to ground
Based on the PV rates contained within the Site Characterisation Report by Arc Design, the
tertiary polishing filter proposed will be 1250 sqm with dimensions of 62.5m x 20.0m.
Please refer to drawings below for more detail.
Soil polishing filter details
Soil polishing filter: 1250 sqm
Sand polishing filter: 150 sqm
Invert level: 0.4m below GL
Finished level: 0.9m above CL
Design Flow: 7’840 Litres/day
Pressurised Pipework: 32mm perforated lateral pipes
50mm distribution manifold
Distribution zones: 1 no. zone
Geotextile Membrane (Permeable): PB1000
Rising Main: 50m approx.
Percolation aggregates specification
Gravel: 15mm-25mm washed gravel with void ratio of 0.4 installed to a total depth of
400mm.
EPA approved bio sand.
Installation Oversight
The installation is to be carried out as per EPA Code of Practice and all works should
be overseen by a suitable and competent person.
Final report with photographs and as-built drawings to be provided upon completion
Mitchell Environmental are fully insured for Public Liability (€2,600,000) and Private
Indemnity. (€1,300,000).
Yours Sincerely,
______________
Gordon Mitchell
Director
5 RECEIVED: 19/06/2026
Appendix
Supporting Documents & Drawings
6 RECEIVED: 19/06/2026
The Tyrone Guthrie Centre
Annaghmakerrig House, Newbliss, Co. Monaghan, H18 PP70
Arts Organsisation
TBC ltrs/day
ltr/day TBC
ltr/hr TBC
min/hr hr/day
Max. influent
concentration
as per EPA
waste water
treatment
manuals After tertiary treatment
531 20
925 20
1748 20
13 1
95 3
6-9
100 5
30 2
1).Design criteria adopted from EPA waste water manual for primary,secondary,tertiary treatment
Flow ltrs/d BOD g/day
Industrial 0 0
0 0
0 0
0 0
0 0
0 0
Open industrial site (quarry)
full time staffOpen industrial site (quarry)
part time staff
Office and/or factory no
canteen, part time staffOffice and/or factory w
canteen full time staffOffice and/or factory w
canteen part time staff
3).*Design criteria adopted from British Water CoP
Reccomended Wastewater Loading Rates From Commercial Premises
Situation Source Population Office and/or factory no
canteen, full time staff 0
Ammonia as N 3
Comments:
2).Design criteria adopted from EPA waste water manual for small communities, business, leisure centres and hotels
pH
Oil Fats Greases 5
O-PO4 1
Total N 5
BOD5 20
COD 20
Parameter [mg/l]Prior to treatment After secondary treatment
SS 30
NO3 Max/day
Average period during which emissions are made , including daily or seasonal variations
0 24 7
Wastewater characteristics
Normal/day TBC Maximum/day
Max.rate/hour BOD Max/day
Wastewater Characterisation Form 20-500PE (Population Equivalent)
Site Details:
Type of activity:
Quantity of disinfection chemicals used:
Emission Details :estimated volume to be emitted
7 RECEIVED: 19/06/2026
School pupils 0 0
0 0
6300 2100
420 210
180 90
Hostel Accomodation 0 0
0 0
0 0
180 60
0 0
0 0
400 200
Restaurant full meals 0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
0 0
Total 7480 2660
PE 50 44
WWTP TO BE DESIGNED = 50 PE
static fully serviced
tent sites
Nursing homes (convalescent)*
Health/Spa centre*
Caravan sites touring not serviced
static not serviced
shower/use*
golf club ( players)
rugby/footbal club*
drivers/visitors toilet WC /use*
toilet (urinal)/flush*
toilet (lorry park)/use*
Bar drinkers
Bar meals
Amenity sites toilet blocks/flush*
Pubs and Clubs Resident staff
full time staff
part time staff
fast food roadside bar
fast food burger chain*
function rooms
prepared catering
snack bars
function rooms
part time staff
day conference guest 10
luxury catering
Guest (no meals)
Security 1
full time staff
part time staff 6
Guests 3&4star
Guests 5star*
no cooking
Accomodation Residents 35
full time staff 7
cooking on-site
8 RECEIVED: 19/06/2026
R o
a
d
Inv 0.1plas=109.18
FENCE
150M2 PROPOSED
RAISED SAND
POLISHING FILTER
(15M X 10M)
MH
PROPOSED TERTIARY SAND POLISHING FILTER
GRASS LAWN
GRASS LAWN
EXISTING SEWAGE
TREATMENT SYSTEM
TO BE RETAINED AS
PRIMARY BALANCING
TANKS
PROPOSED 50PE
SEWAGE TREATMENT
SYSTEM
1250M2 PROPOSED GRAVEL
INFILTRATION BED
(62.5M X 20M)
PROPOSED 50MM
RISING MAIN
PROPOSED MAG
FLOW METER
MH
SEWAGE INLET SUMP
MH
Proposed Sewage Treatment System for The
Tyrone Guthrie Centre at Annaghmakerrig,
Mullaghmore, Newbliss, Co. Monaghan, H18 PP70
9 RECEIVED: 19/06/2026
Inlet
Ø160mm
AA
LAYOUT PLAN
SECTION A-A
Inlet
Ø160mm
piping
Ø110mm
Oakstown, Trim, Co. Meath, Eircode C15 X499
Lo call: 1850 200 702 Tel: +353 (0) 46 943 1389
info@oreillyoakstown.com www.oreillyoakstown.com
O'REILLY OAKSTOWN ENVIRONMENTAL
Commercial & Residential Wastewater
Treatments Systems & Septic Tanks
CLIENT:
PROJECT:
TITLE:
O'REILLY OAKSTOWN ENVIRONMENTAL SCALE:
DATE:
DRAWING NO.:
STATUS:
DRAWN BY:
REVISION:
SR 66 POPULATION EQUIVALENT 50 PE
GENERAL PLAN AND SECTION
THIS DRAWING TO BE READ IN CONJUNCTION WITH ALL RELEVANT DRAWINGS AND
SPECIFICATIONS. DO NOT SCALE FROM THIS DRAWING. FIGURE DIMENSION ONLY TO BE USED.
ALL DIMENSIONS ARE IN MILLIMETERS EXCEPT WHERE SHOWN. ANY DISCREPANCIES ON THIS
DRAWING OR ON SITE ARE TO BE REPORTED TO THE O'REILLY GROUP. THIS DRAWING IS THE
PROPERTY OF O'REILLY GROUP, IT IS A CONFIDENTIAL DOCUMENT AND MUST NOT BE COPIED,
OR ITS CONTENT DIVULGED WITHOUT PRIOR WRITTEN CONSENT.
NTS @ A4
DECEMBER 2023
OAKS/50/08/01
PROGRESS
YOGEESH.B.E10 RECEIVED: 19/06/2026
Drwg No :
Mobile: 087-9609975
www.mitchellenvironmental.ie
G. M
The Tyrone Guthrie Centre at
Annaghmakerrig
Annaghmakerrig House,
Mullaghmore, Newbliss, Co.
Monaghan, H18 PP70
Proposed Tertiary Polishing filter
Plan Drawing.
MIT_250711_P1.0
D. McMNTS @ A3
01.05.26
250711.
e-mail: gordon@mitchellenvironmental.ie
Drawn By :
Checked:
Client:
Address:
Title:
Office: 046-9055642
Tankardrath, Kilberry, Navan, Co. Meath
Project Name and Address
Date:
Scale :
File Ref :
11 RECEIVED: 19/06/2026
Drwg No :
Mobile: 087-9609975
www.mitchellenvironmental.ie
G. M
The Tyrone Guthrie Centre at
Annaghmakerrig
Annaghmakerrig House,
Mullaghmore, Newbliss, Co.
Monaghan, H18 PP70
Proposed Tertiary Polishing filter
Cross Section Drawing.
MIT_250711_P2.0
D. McMNTS @ A3
01.05.26
250711.
e-mail: gordon@mitchellenvironmental.ie
Drawn By :
Checked:
Client:
Address:
Title:
Office: 046-9055642
Tankardrath, Kilberry, Navan, Co. Meath
Project Name and Address
Date:
Scale :
File Ref :
12 RECEIVED: 19/06/2026
SUDS analysis
Flexible Liquid storage
Flood Control Solutions
Surface Water solutions
Hydrocarbon Separation
Hydrocarbon Separation
Environmental Solutions
Water treatment and control
Hydrocarbon Storage Solutions
Attenuation/Soakaway Products
Specialised Percolation Installations
Providing Sustainable and Progressive
Sewage Treatment analysis and reports
www.mitchellenvironmental.ie
13 RECEIVED: 19/06/2026