HomeMy WebLinkAbout2560508 - F.I. Received Doc. - Water Protection checklistMONAGHAN LOCAL AUTHORITIES
Environment Protection Plan Checklist
This is a checklist to be completed by applicant to be backed up by an appropriate level of detail
depending. To be accompanied by a Site Drainage Plan – as set out in the Monaghan County
Development Plan 2025 – 2031.
General Site and Water Body Details
Planning Ref. No. 25/60508 Applicant Board of Trustees of Tyrone
Guthrie Centre
Townland Mullaghmore/Knockcor Water Supply Source Mains Supply –
Drumgole GWS
X Co-ordinate 1 257897 Y Co-ordinate 1 272930
WFD River Sub Catchment2 Bunnoe_SC_010 WFD River Sub Basin2 BUNNOE_010
WFD River Waterbody latest
Status 2
Status Year WFD River Waterbody
Risk2
At Risk
Poor
2019-
2024
WFD River Waterbody
Objective2
Restore to Good Status
and prevent deterioration
Groundwater Vulnerability Low Aquifer Importance Poor
Proximity to sensitive receptors (Private Wells, Public and Private Water Supply
Sources, Amenity Areas, SPA’s, SAC’s , NHA) (meters)
Annamakerig Lake –
150m to south
Proximity to nearest watercourse (culverted or open), wetland or lake (meters) Annamakerig Lake –
150m to south
Existing EPA Licence (insert licence no) N/A
Existing Section 4 licence (insert licence no) N/A
Proposed Development
Is the development entirely or part of one of the following? (tick)
Domestic dwelling Agricultural (cattle/dairy) Industrial-food related
Public Works Agricultural (mushrooms) Industrial-non food
Housing Agricultural (poultry) Quarrying/extractive
industries
Institutional Agricultural (piggery) Transport related
Commercial/Retail Other agricultural –
specify below
Filling station/Fuel depot
Mixed Use
Development
Other Artists retreat – residential
accommodation
X
Waste Permit
Type of wastewater Produced by the proposed development (tick)
No wastewater produced
Domestic type waste waters <5m3 per day X
Domestic type waste waters >5m3 per day 4
Waste waters produced from any trade, food,
preparation or business 4
Wheel wash, vehicle wash, cooling waters 4
Waste waters produced from quarrying etc 4
Other waste waters 4 RECEIVED: 19/06/2026
Have proposals for Wastewater Management during the operational phase and full details of same
been included with the application? (tick)
Public Sewer Connection details (Uisce Eireann) No
Existing Wastewater Treatment System Yes – to be upgraded as part of this application
Proposed new onsite wastewater treatment
system
Yes – existing to be upgraded as part of this application
No wastewater generated
Have proposals for Waste Facility aftercare and use been included with the application? (tick)
Agricultural Improvement Plan where
applicable
Closure plan and aftercare details
Proposed water sampling locations clearly
identified
License or Lease agreement for the site if not
owned by the applicant.
Fuel or Outdoor Material Storage for Non-Domestic Developments - operational phase (tick)
Number of fuel storage tanks existing or proposed on site? One diesel tank, two gas tanks
Are fuel storage tanks bunded 5? Diesel tank bunded
Any liquid / feedstuffs / organic / chemical / waste oil storage
on outdoor sites ?
No
Proposals for protection of water receptors during the Construction Phase
Has a CEMP relating to water protection and
waste management been included with the
application?
No – to be prepared prior to construction stage
Name of person appointed to oversee the
implementation of the CEMP.
Main contractor – to be confirmed
Hard Surface and Open Yard Areas for Non Domestic Developments (tick)
Footprint of proposed development including yard areas in m2 1900m2
Is there potential for soiled yard areas from material, product waste or
manure handling, fuel dispensing, silt and soil, yard washing etc.
No
If yes, are silt trap(s), interceptor(s), soiled water tanks or other control
measures shown on drainage plan?
N/A
Has the use of SUDS (Sustainable Urban Drainage Systems –
http://www.susdrain.org ) been included in the design of this
development?
Yes
Development History – All Developments (tick)
Have previous pollution prevention planning conditions been complied with 6? Yes
Does existing development have an up to date (as constructed) site drainage plan? Yes
Is the existing/proposed development sewered or unsewered? Unsewered
If unsewered, is the existing wastewater treatment system fit for purpose7? To be
upgraded
Has the storm water drainage system been examined and/or surveyed for
misconnections?
Yes
Is there an existing Certificate of Registration or Waste Facility Permit at the site? No
Checklist of items to be included on the Site Drainage Plan (tick)
Location of lakes, watercourse, wells used for water supply, or karst features on or within
25m of domestic or 100m of non-domestic development site
✓
Location of all clean drainage outfall points ✓ RECEIVED: 19/06/2026
Foul water drainage system (in Red) ✓
Storm water drainage system (in Blue) ✓
Soiled yard area, soiled water drainage and management system N/A
Storm water management system, including silt traps, oil interceptor(s) and SUDS
facilities
✓
Location of waste water treatment facilities ✓
Location of fuel storage tank(s) ✓
Stream/Lake/Wetland/Riparian Corridors/Wells ✓
Footnotes and Useful Information
1Projection in the Irish Grid
2WFD information available online at www.catchments.ie
WFD mapping available online at https://gis.epa.ie/EPAMaps/Water
3Available in the groundwater mapping section www.gsi.ie
4If a trade efluent or discharge >5m3 of domestic type wastewater to ground is proposed a Section 4
discharge licence may be required https://monaghan.ie/environment/discharge-licences/
Proposals for wastewater treatment shall be sufficient to demonstrate that the discharge will not cause
deterioration in water quality of the receiving water body in accordance with the requirements of the
European Communities Environmental Objectives (Surface Waters) Regulations 2009 as amended and
the European Communities Environmental Objectives (Groundwater) Regulations 2010 as amended.
5Guidance on Best practice for Oil Storage (BPGCS05) and note requirements of Building Regulations.
6Have previous planning conditions been complied with e.g. Has certification of installation for
previously granted wastewater treatment system been required and if so, has it been submitted with
this application.
7Refer to EPA Guidance at: https://www.epa.ie/publications/compliance--enforcement/waste-
water/2021_CodeofPractice_Web.pdf
8 Refer to Water Body, Sensitive Waters and Sensitive Land Maps in the Monaghan County
Development Plan 2025-2031.
Abbreviations
WFD Water Framework Directive
SAC Special Area of Conservation
SPA Special Protection Area
NHA Natural Heritage Area
EPA Environment Protection Agency
CEMP Construction Environmental Management Plan
For Office Use: Sensitivity of Location –
Is the development located upstream of a high river quality site 8?
Is the development located within a good status waterbody 8?
Is the development located in the catchment of a water supply source 8?
Is the development located within the Source Protection Zone (SPZ) of a groundwater supply
source 8?
Does the development require a discharge licence to surface or ground waters under the Water
Pollution Acts?
Risk to waters in relation to scale of development, previous planning/environmental history, IPPC
or EIA aspects, site management and location in a sensitive area
Applicant: Board of Trustees of Tyrone Guthrie Centre
RECEIVED: 19/06/2026
Agent: Alan Clarke & Associates Date: 3rd June 2026 RECEIVED: 19/06/2026