Loading...
HomeMy WebLinkAbout2560508 - F.I. Maps - Proposed Roof planHYD STV AV 65.5 STN IL 98.5 4 1657700 E657700 E657750 E657750 E657800 E657800 E657850 E657850 E657900 E657900 E657950 E657950 E82070 0 N 82070 0 N 82075 0 N 82075 0 N 82080 0 N 82080 0 N 82085 0 N 82085 0 N 82090 0 N 820900 N 820950 N820950 N Tyrone G u t h r i e C e n t r e , Annag h m a k e r r i g H o u s e , Newbli s s , Co. Mo n a g h a n , H18 P P 7 0 , Ireland . STOP V A L V E AIR VA L V E SLUIC E V A L V E TELEC O M P O L E ESB B O X ESB P O L E TELEC O M B O X HYDR A N T MANH O L E C I R C U L A R MANH O L E S Q U A R E WOOD E N F E N C E HARRI S F E N C I N G STATI O N P O I N T LAMP P O S T SPOT H E I G H T LP 98.541 Gate G GATE ROAD G U L L Y TOP O F B A N K INVER T L E V E L CONT O U R L I N E BOTT O M O F B A N K DRAIN MH MH TP BUILDI N G WALL KERB ROAD E D G E RAILIN G POST A N D W I R E F E N C E WALL & R A I L I N G SHRU B L I N E DECID U O U S T R E E CONIF E R O U S T R E E Legen d HEDG E AJ AJ W_FE N C E EP STON E W A L L OVER G R O W N OVER G R O W N OR DE N S E V E G E T A T I O N HEAD BOAR D TOW FL CEILIN G UPPE R L E V E L O F O P E N I N G TOP O F W A L L FLOO R L E V E L CEILIN G H E I G H T UNDE R S I D E O F B E A M LOWE R L E V E L O F O P E N I N G C_LIN E CEILIN G D E T A I L BEAM OVER H E A D B E A M LIGHTI N G FACE O F H E D G E USB00.000 0 ASSU M E D W A L L T H I C K N E S S TCB SOCIETY OFCHA R T E R E D SUR V E Y O R S IRELAND 5 3 0 8 DMC SURVEYLand Surveyors,Teltown, Donaghpatrick,Navan, Co.Meath. 087 230234 6E-mail: d m c l a n d s u r v e y @ g m a i l . c o m 1/1 m e t e r s Scal e Drn By JC Date 19/0 9 / 2 0 2 5 Rev Survey o f : Proj e c t Clie n t N Tyrone G u t h r i e C e n t r e , Annag h m a k e r r i g H o u s e , Newbli s s , Co. Mo n a g h a n , H18 P P 7 0 , Ireland . DP DRAIN P I P E SVP SOIL V E N T P I P E HORIZONTAL(ITM) & VERTICAL(MALIN HEAD)SCALE 1/1 METERS ? ?5 m²Water Tower 21902150119.35 m Eaves Level 118.57 Ridge Level 120.80 Covered Open Pump House Retained Grass Area Grass Area Proposed Pergola Proposed Zinc Roof External Metal Staircase Existing Flat Roof Existing Flat Roof Existing Flat Roof Existing Flat Roof Existing Flat Roof Existing Flat Roof Extended Flat Roof 8.20m2 Existing Water Tank eCar Charging Point Gravel Access Road Site Ownership Site Boundary Right of Way Site Access Site Notice Existing Structures Proposed Structures Demolition Proposed Outline Existing/Proposed Surface/storm Water Existing/Proposed foul water drainage system Drawn by Project Title: Drawing Title: Scale Client Date Drawing No: Checked by COPYRIGHT RESERVED: THIS DRAWING IS NOT TO BE USED FOR A PURPOSE OTHER THAN THAT FOR WHICH IT HAS BEEN ISSUED BY GAFFNEY & CULLIVAN ARCHITECTS LTD. NOR IS IT TO BE COPIED OR REPRODUCED, RETAINED OR DISCLOSED EITHER WHOLLY OR IN PART BY OR TO ANY UNAUTHORISED PERSONS WITHOUT WRITTEN CONSENT. 1. ALL DIMENSIONS TO BE CHECKED ON SITE.2. DO NOT SCALE THIS DRAWING, ONLY FIGURED DIMENSIONS TO BE TAKEN AS ACCURATE. 3. ARCHITECTS TO BE INFORMED IMMEDIATELY OF ANY DISCREPANCIES 4. WORKS BELOW GROUND LEVEL ARE PROVISIONAL ONLY. NOTES: USE FIGURED DIMENSIONS ONLY Designed by Rev As indicated @ A1 Rev 01 Potting Shed Shared Island Tyrone Guthrie Centre AF DC Proposed Finishes 25-024- AF 14/10/25 TGC- GCAL- 01- 00- DR- A-0509SCALE: 1 : 1000509 Proposed Roof Plan Copy 11 N Rev Nr.Date Description Rev 01 14/10/2025 Issue for Planning Finishes Schedule Paving: Patio, stairs and ramps. 400×400×40 mm Kilsaran Shelbourne Silver Granite Flags (pedestrian grade) on sand blinding over 175 mm compacted hardcore. Accessible Parking Bays Finishes 200×100 ClimaPave Slane blocks Finishes Schedule Paving: Patio, stairs and ramps. 400×400×40 mm Kilsaran Shelbourne Silver Granite Flags (pedestrian grade) on sand blinding over 175 mm compacted hardcore. Zinc Roof Zinc Cladding on Walls Brick Finish - Front wall only Parking Bays Finishes 200×100 ClimaPave Slane blocks Proposed Metal Handrail Patio, stairs and ramps. Proposed Brick Wall External Metal Stair Balustrade in natural weathering Corten steel. Hot-dip galvanised steel stair structure.RECEIVED: 19/06/2026