HomeMy WebLinkAbout2560508 - Report Received from Internal Staff - EnvironmentENVIRONMENTAL REPORT
To: Planning Section.
From: Peter Deery (Environment Section – Water Team).
Re: 25/60508 Board of Trustees of Tyrone Guthrie Centre
Permission: Permission for proposed works which will comprise of alterations to existing Potting
Sheds and change of use to Artist's Studios (previously approved PL 19/574). Works
will include an increase in floor area, alterations to the floor plan and elevations,
development of a ramp access, canopy and alterations to the external staircase to the
tower. Also, pergola/ramp link between Potting Sheds and Dance Studio and internal
alterations to Dance Studio. All to include external works and connections/alterations
to site services and all associated site works. All within the curtilage of a Recorded
Protected Structure, ref No. 41401716.
Location Annaghmakerig House, Newbliss, Co. Monaghan.
Date: 29/06/2026
Background
The following additional information was requested:
a) A fully completed Water Protection Plan checklist.
A fully completed Water Protection Plan checklist has been submitted with the
additional information.
b) A revised site layout plan, scale 1:500, demonstrating the following:
- All existing/proposed surface/storm water drainage systems (outlined in blue).
- The directional flow of all surface water pipelines.
- All associated discharge points and outfalls.
- All existing/proposed foul water drainage systems (outlined in red).
A revised site layout demonstrating the above has been submitted with the additional
information.
c) A wastewater characterisation report to include volumes of all wastewaters to be
generated. The report shall consider the relevant EPA Code of Practice.
A wastewater characterisation report and Wastewater Treatment System Design
Specification report has been submitted with the additional information. The report
proposed a new 50 PE BAF treatment system, 150m2 sand polishing filter, and 1,250m2
infiltration bed. The proposed design utilises the existing wastewater treatment system
as additional primary storage prior to the proposed treatment system.
d) An assessment of the existing wastewater treatment system and percolation area
i. The assessment shall demonstrate the capacity of the existing wastewater
treatment system to treat the proposed wastewater loadings prior to discharge
to percolation area.
ii. The assessment shall demonstrate the suitability of the existing percolation area
to further treat wastewater from the treatment system.
iii. The assessment shall include proposals (if required) for upgrade of the system to
serve the proposed development.
iv. The assessment and proposals shall take account of the requirement of the
relevant EPA Code of Practice and shall be prepared by a suitably qualified
person.
As per C above, a new 50 PE BAF treatment system, sand polishing filter, and infiltration
bed has been proposed as part of the additional information.
Recommendation
a) Any construction and demolition waste or excess soil generated during the construction phase
which cannot be reused on site in accordance with Section 3 (1)(c) and Section 39 (1) of the
Waste Management Act 1996 as amended, shall be disposed/recovered at an appropriately
permitted facility in accordance with the requirements of the Waste Management Act 1996
as amended using authorised waste collectors authorised to collect the type of material for
disposal/recovery at authorised treatment facilities.
b) If infilling material is required to be imported onsite the applicant or economic operator shall:
i. Utilise EPA By-Product Regulation 27 in moving soil infill material from one site to
another. Official correspondence demonstrating Article 27 Registration with the EPA
shall be submitted to the Planning Authority prior to commencement of development.
or
ii. If using waste material as infill and prior to acceptance of material a valid permit must
be issued by Monaghan County Council in accordance with the Waste Management
(Facility Permit and Registration) Regulations 2007 as amended.
or
iii. Buy topsoil material as a product for final landscaping purposes only. Documentation
demonstrating purchase shall be submitted to Planning Authority.
c) One month prior to commencement, submit a site-specific Construction & Demolition
Resource Management plan for approval. Applicant to consider Best Practice Guidelines for
the preparation of Resource & Waste Management Plans for construction and demolition
projects.
d) Facilities shall be provided for the collection and segregation of recyclable waste. Wastes shall
be collected for recycling/reuse whenever feasible or otherwise disposed of in accordance
with the Waste Management Act 1996 as amended.
e) The applicant shall ensure that adequate measures are in place for the construction phase to
ensure there is no discharge of polluting matter/sediment laden waters to any watercourse
or drains. These measures shall take account of the Guidance produced by Inland Fisheries
Ireland titled “Requirements for the Protection of Fisheries Habitat during Construction and
Development Works at River Sites”. This document is available to download at
https://www.fisheriesireland.ie/documents/624-guidelines-on-protection-of-fisheries-
during-construction-works-in-and-adjacent-to-waters/file.html
f) All storm water shall discharge to a soak pit designed in accordance with the infiltration report
submitted.
g) The proposed wastewater treatment system, sand polishing filter, and infiltration bed shall be
installed in accordance with the Wastewater Treatment System Design Specification report.
h) The proposed wastewater treatment system shall be maintained as per manufacturers
specifications.
i) Sludge’s/solid wastes arising from the desludging of the wastewater treatment system shall
be collected by a suitably permitted collector in accordance with the Waste Management Act,
1996 as amended.
j) Any fuels, oils, greases, hazardous liquid wastes and hydraulic fluids within the site area shall
be stored on site, away from any watercourses in a bunded, leak-proof, and lockable storage
area. Note that bunds are to be designed to contain 110% of the capacity of the largest storage
container located within the bund. There shall be no overflow drain facility from any bunds
on site, and all filling and off-take points shall be located within a bund.
k) Applicant/developer is required to take all necessary precautions to prevent any risk of
flooding or pollution occurring to roadways and adjoining properties/lands during all
construction works/site works associated with this development/site and on completion of all
works.
Signed: Date: 29/06/2026
Peter Deery
A/Senior Executive Technician