HomeMy WebLinkAbout2572 - Notification of DecisionRannog Pleanail
Planning Section
00�
OO353 47 30532
Comhald. Conte. Mbulnaechfln planning@monaghancoco.ie
Monaghan County Cooncll
03/07/2026
Ref No: 25/72
TO: Tydavnet Community Creche
C/O Craftstudio Architecture
Old Train Station
North Road
Monaghan
H18 YK54
Re: Planning and Development Act 2000 (as amended)
NOTIFICATION OF DECISION
Monaghan County Council has by order dated 03/07/2026 decided to GRANT permission to the above
named for development of land, in accordance with the documents submitted namely for:- permission
to insert adapted prefabricated unit as "Proposed temporary community childcare facility", connect to
existing public sewer and exit on to public road by existing laneway and all associated works,
Significant Further Information received relates to revision to development comprising of; Amended
site boundaries, Amended site layout to include revised location of the prefabricated units, Revised
vehicular and pedestrian access and egress configurations, Revised parking configuration, Updated
surface and foul and surface water layouts, environment protection checklist, Public lighting
specification, proposed revised drawings and Stage 1 Road Safety Audit at Mullanarockan, Tydavnet
subject to the 16 condition(s) set out in the Schedule attached.
Signed on behalf of Monaghan County Council
ADMINISTRATIVE OFFICER
o31J� 12�`i-�
DATE
Provided there is no appeal against this DECISION a grant of planning permission will issue at the
end of four weeks (see footnote).
NO WORKS CAN COMMENCE ON FOOT OF A'NOTIFICATION OF DECISION' ON AN APPLICATION.
THE DEVELOPMENT IS ONLY AUTHORISED WHEN A'NOTIFICATION OF FINAL GRANT' IS ISSUED.
0
Oifigi Pleanala
Comhairle Contae Mhuineachain
1 Sraid Bhaile Atha Cliath,
Muineachan,
H18 X982, Eire.
O®
00353 47 30500
info@monaghancoco.ie
eolas@monaghancoco.ie
www.monaghan.ie
0
Planning Offices
Monaghan County Council
1 Dublin Street,
Monaghan,
H18 X982, Ireland.
Failtionn an t0daras Aitiuil roimh chomhfhreagras i nGaeilge
Footnote:
An appeal against a decision of a Planning Authority under the Planning and Development Act 2000 (as
amended) may be made to An Coimisiun Pleanala, 64 Marlborough Street, Dublin 1, D01 V902. (Tel.
(01) 8588100) during office hours.
1. You have four weeks beginning on the date the planning authority makes its decision which
was (03/07/2026). This is a strict time limit.
2. You must put your appeal in writing (either typed or handwritten).
3. You must clearly state your own name and address. If someone is acting for you, like a planning
agent they must clearly state their own name and address as well as your name and address.
4. You must give enough details to allow An Coimisiun Pleanala to identify the application you
wish to appeal.
5. You must provide your planning grounds of appeal (reasons and arguments) for your appeal
and any items you wish to support your grounds of appeal.
6. If you are a third party, you must include the written acknowledgement given to you by the
planning authority to confirm it received your submission at planning application stage.
7. You must pay the correct fee.
For more information on how to make an appeal see www.pleanala.ie
0
Oifigi Pleanala
Comhairle Contae Mhuineachain
1 Sraid Bhaile Atha Cliath,
Muineachan,
H18 X982, Eire.
O®
00353 47 30500
info@monaghancoco.ie
eolas@monaghancoco.ie
www.monaghan.ie
0
Planning Offices
Monaghan County Council
1 Dublin Street,
Monaghan,
H18 X982, Ireland.
Failtionn an tLdaras Aitiuil roimh chomhfhreagras i nGaeilge
25/72 Tydavnet Community Creche,
1.
2.
a
4.
Mullanarockan, Tydavnet, Co. Monaghan
a) The works shall be undertaken in accordance with the drawings and details submitted
as part of this planning application and any subsequently revised items required as a
consequence of the Stage 1 and Stage 2 Road Safety Audit Recommendations.
b) Provision shall be made within the site for surface water drainage, and no surface
water shall be allowed to flow onto the public roadway. The discharge of surface
water from the public road onto the site through road surface drainage and road
subsoil drainage shall remain unimpeded.
c) All surface water management/SUDs work to comply with the Monaghan County
Council Technical Guidance Document (WSTGD 2008) and Monaghan County Council
Storm Water Technical Guidance Document 2017.
d) Prior to and during construction any pumping of groundwater, surface water or any
other potentially polluting discharges of any other effluent, under the relevant Water
Pollution Acts, the applicant is obliged to apply for a licence from the Local Authority.
Reason: In the interest of orderly development and road safety.
a) Prior to the commencement of development, the applicant shall submit details of the
proposed lighting design, as reference in the Road Safety Audit, together with a
revised landscaping plan for agreement in writing.
b) No development shall commence until the information required under a) above has
been agreed in writing with the Planning Authority.
c) The development shall be carried out in accordance with these agreed plans, unless
otherwise agreed in writing with the planning authority.
Reason: In the interest of orderly development and road safety.
Prior to commencement of development, the applicant shall submit to the Planning Authority
for agreement in writing, Confirmation of Feasibility letter from Uisce Eireann confirming that
Tydavnet Wastewater Treatment Plant has capacity to accept the hydraulic and organic
loading arising from the proposed development
Reason: In the interest of environmental protection.
a) Prior to the commencement of the development, the applicant shall submit to the
Planning Authority a Construction & Environmental Management Plan (CEMP) for
agreement in writing. This plan shall be sufficient to demonstrate that adequate
measures will be in place for the construction phase to ensure there is no discharge of
polluting matter/sediment laden waters to any waters. The Construction and
Environmental Management Plan shall take account of best practice and the guidance
produced by Inland Fisheries Ireland titled "Guidelines on Protection of Fisheries
during Construction Works in and Adjacent to Waters 2016" and shall include the
identification of potential pathways to the groundwater aquifer and the River
Blackwater. The CEMP shall be prepared by a suitably qualified person and shall
include the location details of the monitoring points where daily visual checks and
weekly surface water monitoring (physical & chemical parameters) shall be carried
out.
b) No development shall commence until the information required under a) above has
been agreed in writing with the Planning Authority.
0 O® 0
Oifigi Pleanala 0035347 30500 Planning Offices
Comhairle Contae Mhuineachain info@monaghancoco.ie Monaghan County Council
1 Sraid Bhaile Atha Cliath, eolas@monaghancoco.ie 1 Dublin Street,
Muineachan, Monaghan,
H18 X982, Eire. www.monaghan.ie H18 X982, Ireland.
Failtionn an tUdaras Aitiuil roimh chomhfhreagras i nGaeilge
c) All works shall be carried out in accordance with the agreed Construction &
Environmental Management Plan
Reason: In the interest of environmental protection.
5.
a) Storm water arising from the paved areas shall discharge to an appropriately sized and
suitable Class 1 interceptor prior to discharge. Interceptors shall be provided with
appropriate warning device to indicate when required levels for maintenance have
been reached and should be fitted with a sampling chamber, which has easy access.
An inspection manhole shall be installed on the outflow pipe from the oil interceptor.
Prior to development submit design specifications of the existing petrol interceptor
and confirmation that it has capacity to take surface water drainage from the
proposed development.
b) The applicant shall immediately inform the Planning Authority & Inland Fisheries
Board of any accidental spillage of polluting mater or any other substance which may
threaten the quality of any watercourse or groundwater body.
c) Fuel/Oil interceptor shall be serviced regularly, maintained, and installed as per
manufactures recommendations to prevent any discharge of pollutants to ground or
surface waters. Maintenance records shall be kept by the applicant.
d) Sludges/silt/solid wastes arising from the desludging of the interceptor and the
attenuation system shall be collected by a suitably permitted collector in accordance
with the Waste Management Act, 1996 as amended.
e) Any construction and demolition waste or excess soil generated during the
construction phase which cannot be reused on site in accordance with Section 3 (1)(c)
and Section 39 (1) of the Waste Management Act 1996 as amended, shall be
disposed/recovered at an appropriately permitted facility in accordance with the
requirements of the Waste Management Act 1996 as amended using authorised
waste collectors authorised to collect the type of material for disposal/recovery at
authorised treatment facilities.
f) If infilling material is required to be imported onsite the applicant shall conform to one
of the following;
(i) If utilising EPA Article 27 notification to move soil infill material from one site
to another, official correspondence from the EPA granting approval shall be
submitted to the Planning Authority prior to commencement of development.
or
(ii) If using waste material as infill, a valid permit must be obtained from
Monaghan County Council under the Waste Management (Facility Permit and
Registration) Regulations 2007 as amended prior to acceptance of material.
or
(iii) If buying topsoil material as a product for final landscaping purposes only,
documentation demonstrating purchase shall be submitted to Planning
Authority.
g) All waste oils and any other hazardous waste materials shall be stored appropriately
and collected, recovered or disposed of in accordance with the Waste Management
Act 1996 as amended, and records of such shall be kept on site.
(i) All hazardous liquid waste or oil/fuel storage containers, temporary or
otherwise, shall be bunded.
(ii) (All bunds will be designed to contain 110 % of the capacity of the largest
storage container located within the bund.
0 O 0 0
Oifigi Pleanala 0035347 30500 Planning Offices
Comhairle Contae Mhuineachain info@monaghancoco.ie Monaghan County Council
1 Sraid Bhaile Atha Cliath, eolas@monaghancoco.ie 1 Dublin Street,
Muineachan, Monaghan,
H18 X982, Eire. www.monaghan.ie H18 X982, Ireland.
Failtionn an tOdaras Aitiuil roimh chomhfhreagras i nGaeilge
(iii) There shall be no overflow drain facility from any bunds on site and all filling
and off -take points shall be located within a bund.
h) Facilities shall be provided for the collection and segregation of recyclable waste.
Wastes shall be collected for recycling/reuse whenever feasible or otherwise disposed
of in accordance with the Waste Management Act, 1996 as amended.
Reason: In the interest of environmental protection.
6.
The following requirements shall be fully complied with:
a) The applicant is required to employ a qualified archaeologist to monitor all
groundworks associated with the development.
b) Should archaeological material be found during the course of monitoring, the
archaeologist may have work on the site stopped, pending a decision as to how best to
deal with the archaeology. The developer shall be prepared to be advised by the
Department of Housing, Local Government and Heritage with regard to any necessary
mitigating action (e.g. preservation in situ, or excavation) and should facilitate the
archaeologist in recording any material found.
c) The Planning Authority and the Department of Housing, Local Government and
Heritage shall be furnished with a report describing the results of the monitoring.
Reason: To ensure the continued preservation (either in situ or by record) of places, caves,
sites, features or other objects of archaeological interest.
7.
a) The planting details and associated site works as indicated on plans as submitted to
the Planning Authority on 08/09/2025, as amended by additional information on
10/06/2026, shall be fully implemented prior to the operation of the premises hereby
approved or in the first available planting season following commencement of building
operations, whichever is the sooner
b) All hard and soft landscaping shall be in strict accordance with the submitted details.
Reason: In the interest of visual amenity and to secure a satisfactory/appropriate design
standard.
8.
The temporary classrooms for proposed creche are hereby permitted for a period of five years
from the date of the final grant of permission after which time the use shall cease and the
structures shall be removed from the site, unless planning permission for retention has first
been granted by the Planning Authority or An Coimisiun Pleanala.
Reason: In the interests of appropriate design and orderly development.
9.
The use of the premises shall be confined to the use specified on the plans and documentation
lodged with the Planning Authority on 08/09/2025, as amended by additional information on
10/06/2026. Any intensification or change of use shall be subject of a separate application to
the Planning Authority.
Reason: In the interest of orderly development and to prevent unauthorised development.
10.
The development shall not operate outside of the hours 08:00 to 18:00 Monday to Friday
inclusive, nor at any time on Saturdays, Sundays, Bank or Public Holidays, unless otherwise
agreed in writing with the Planning Authority.
Reason: In the interests of proper planning and orderly development.
0
Oifigi Pleanala
Comhairle Contae Mhuineachain
1 Sraid Bhaile Atha Cliath,
Muineachan,
H18 X982, Eire.
O
00353 47 30500
info@monaghancoco.ie
eolas@monaghancoco.ie
www.monaghan.ie
0
Planning Offices
Monaghan County Council
1 Dublin Street,
Monaghan,
H18 X982, Ireland.
Failtionn an tUdaras Aitiuil roimh chomhfhreagras i nGaeilge
11.
Prior to the operation of the premises, car parking, drop off zoned and vehicular circulation
shall be laid out in accordance with the submitted plans and shall be kept free from
obstruction thereafter.
Reason: In the interest of traffic safety and orderly development.
12.
No other signs, flags, logos or other advertising material (or illumination) shall be erected on
the building, on -site, along the site boundary and/or at the roadside, unless exempt under the
Planning Development Regulations 2001 (as amended), or Full Planning Permission for same is
obtained.
Reason: In the interest of visual amenity.
13.
All service cables associated with the proposed development (such as electrical,
telecommunications, communal television, public lighting, etc) shall be located underground.
As applicable, suitable ducting shall be provided by the developer to facilitate the provision of
broadband infrastructure.
Reason: In the interest of proper planning and orderly development.
14.
External lighting shall be cowled and directed away from surrounding properties and the
public road.
Reason: In the interests of residential amenity and traffic safety.
15.
a) Ground levels and finished floor levels shall be as detailed on plans submitted to
Planning Authority on 08/09/2025, as amended by additional information on
10/06/2026.
b) Any facilitating cut and/or fill shall be graded to a natural contour to reflect the
existing topography of the area.
Reason: In the interests of visual amenity and securing a satisfactory standard of
development.
16.
The development shall be carried out in accordance with plans and documentation submitted
to the Planning Authority on 08/09/2025, as amended by additional information on
10/06/2026, except as may otherwise be required in order to comply with the above
conditions.
Reason: To ensure a satisfactory standard of development.
O
Oifigi Pleanala
Comhairle Contae Mhuineachain
I Sraid Bhaile Atha Cliath,
Muineachan,
bb
18 X982, Eire.
O®
00353 47 30500
info@monaghancoco.ie
eolas@monaghancoco.ie
www.monaghan.ie
0
Planning Offices
Monaghan County Council
1 Dublin Street,
Monaghan,
H18 X982, Ireland.
Failtionn an tUdaras Aitiuil roimh chomhfhreagras i nGaeilge