To: Donna McEvoy – A/Executive Scientist.
From: Martina McPhillips (Environment Section – Waste Team)
Re: 26/60256 Conor McEnaney, Cloghvally Lower, Carrickmacross, Co. Monaghan.
Consultants: McGuigan Architects
Permission: … permission for alterations and extensions to an existing two-storey dwelling
comprising of the following:
1. Demolish existing car port and garage
2. Construct rear and side extensions to include single-storey & two-storey structures
3. Alterations of existing dwelling to include façade treatments such as openings & materials
together with replacement of existing roof structure & finish
4. Construct a new one and a half storey attached domestic garage & car port
5. Adjustment of existing drainage layout to include new pump station & soil polishing filter
6. Ancillary internal & external refurbishments together with all associated works.
Planner: Ben Clerkin
Date: 08/07/2026
__________________________________________________________________________________
Background
The proposed development is located on a Regionally Important Fissured Bedrock aquifer in an area
of Extreme groundwater vulnerability making the aquifer extremely susceptible to pollution. The
development site is located within the Glyde SC_020 subcatchment which has been assigned Poor
ecological status under the Water Framework Directive. Pressures include Agriculture, Industry, Urban
Waste Water, Urban Run-off and Hydromorphology.
The existing water supply to the property is provided via Donaghmoyne Group Water Scheme. The
applicant intends to manage all existing and proposed surface water by directing it to the current on-
site soakaway.
The applicant proposes to retain the existing wastewater treatment system and install a new pump
station and soil polishing filter. Soil polishing filter will be installed downstream of the retained WWTS
system for final effluent treatment and discharge to groundwater. Site characterisation report
received with the application. I note the file has been forwarded to the EHO for comment.
A Water Protection Checklist has been received with the application
Recommendation
I have no objection to planning subject to the following conditions:
a) Any construction and demolition waste or excess soil generated during the construction phase
which cannot be reused on site in accordance with Section 3 (1)(c) and Section 39 (1) of the
Waste Management Act 1996 as amended, shall be disposed/recovered at an appropriately
permitted facility in accordance with the requirements of the Waste Management Act 1996
as amended using authorised waste collectors authorised to collect the type of material for
disposal/recovery at authorised treatment facilities. Therefore, one month prior to
commencement of development the applicant shall submit to the planning authority the
following:
i. A Construction and Demolition and By-Products Waste Management Plan for the
proposed development works. The plan shall be prepared using “Best Practice
Guidelines for the preparation of resource & waste management plans for
construction and demolition projects” – EPA, 2021.
ii. An asbestos survey and removal plan for the proposed development works.
b) Within one month of the final grant of planning permission, submit a revised site layout plan
(Scale 1:500). This plan must clearly demonstrate the following
I. All proposed surface/storm water drainage systems (outlined in blue) from all
structures.
II. Location of soakpit to handle surface water run off from all structures.
III. The directional flow of all surface water pipelines.
IV. All associated discharge points and outfalls.
V. All proposed foul water drainage systems (outlined in red).
c) If infilling material is required to be imported onsite the applicant shall conform to one of the
following;
i. Economic operator shall utilise EPA Article 27 notification in moving soil infill
material from one site to another. EPA registration notification shall be submitted to
the Planning Authority prior to commencement of development.
or
ii. If using waste material as infill and prior to acceptance of material a valid permit
must be issued by Monaghan County Council in accordance with the Waste
Management (Facility Permit and Registration) Regulations 2007 as amended.
or
iii. Buy topsoil material as a product for final landscaping purposes only.
Documentation demonstrating purchase shall be submitted to Planning Authority.
d) The applicant shall ensure completely separate foul and surface water drainage systems are
in place.
e) Applicant/developer is required to take all necessary precautions to prevent any risk of
flooding or pollution occurring to roadways and adjoining properties/lands during all/any site
works associated with this site.
f) Any accidental discharge, spillage or deposit of any polluting matter from the premises which
enters or is likely to enter any waters shall be reported to Monaghan County Council
Environment Section immediately.
g) Any hazardous waste and/or oil/fuel storage containers temporary or otherwise to be bunded
and shall be disposed / recovered at an appropriately permitted facility in accordance with
the requirements of the Waste Management Act 1996 as amended. Please note that bunds
are to be designed to contain 110 % of the capacity of the largest storage container located
within the bund.
h) Facilities shall be provided for the collection and segregation of recyclable waste. Wastes shall
be collected for recycling/reuse whenever feasible or otherwise disposed of in accordance
with the Waste Management Act 1996 as amended
Prepared By:
Date: 08/07/2026
Environment Technician
Approved By: Date: 08/07/2026
Kieran Duffy
Senior Executive Engineer