Loading...
HomeMy WebLinkAbout2560502 - F.I. Received Doc. - Uisce Eireann Stiúrthóirí / Directors: Jerry Grant (Cathaoirleach / Chairperson), Niall Gleeson (POF / CEO), Douglas Millican, Michael Nolan, Patricia King, Eileen Maher, Cathy Mannion, Michael Walsh, Rena O’Sullivan and Orlagh Nevin. Oifig Chláraithe / Registered Office: Teach Colvill, 24-26 Sráid Thalbóid, Baile Átha Cliath 1, D01 NP86 / Colvill House, 24-26 Talbot Street, Dublin, Ireland D01NP86 Is cuideachta ghníomhaíochta ainmnithe atá faoi theorainn scaireanna é Uisce Éireann / Uisce Éireann is a designated activity company, limited by shares. Cláraithe in Éirinn Uimh.: 530363 / Registered in Ireland No.: 530363 CONFIRMATION OF FEASIBILITY Philip Rowland 36 Moor Road Coalisland Tyrone BT714QB 7 April 2026 Our Ref: CDS26000136 Pre-Connection Enquiry Future Building Site, Scarnageeragh, Emyvale, Monaghan Dear Applicant/Agent, We have completed the review of the Pre-Connection Enquiry. Uisce Éireann has reviewed the pre-connection enquiry in relation to a Water & Wastewater connection for a Housing Development of 30 unit(s) at Future Building Site, Scarnageeragh, emyvale, Monaghan, (the Development). Based upon the details provided we can advise the following regardi ng connecting to the networks; Water Connection Feasible Without Infrastructure Upgrade by Uisce Éireann Water Treatment Connection feasible without infrastructure upgrades. Water Network Connection to 75mm water main nearest the site is feasible without infrastructure upgrades. Wastewater Connection Feasible Subject to Upgrades Wastewater Treatment Connection feasible without infrastructure upgrades. Wastewater Network An approximately 55m 225mm wastewater extension is required to connect this development to the existing network. RECEIVED: 09/07/2026 This letter does not constitute an offer, in whole or in part, to provide a connection to any Uisce Éireann infrastructure. Before the Development can be connected to our network(s) you must submit a connection application and be granted and sign a connection agreement with Uisce Éireann. As the network capacity changes constantly, this review is only valid at the time of its completion. As soon as planning permission has been granted for the Development, a completed connection application should be submitted. The connection application is available at www.water.ie/connections/get-connected/ Where can you find more information? • Section A - What is important to know? • Section B - Details of Uisce Éireann’s Network(s) This letter is issued to provide information about the current feasibility of the proposed connection(s) to Uisce Éireann’s network(s). This is not a connection offer and capacity in Uisce Éireann’s network(s) may only be secured by entering into a connection agreement with Uisce Éireann. For any further information, visit www.water.ie/connections, email newconnections@water.ie or contact 1800 278 278. Yours sincerely, Dermot Phelan Connections and Developer Services RECEIVED: 09/07/2026 Section A - What is important to know? What is important to know? Why is this important? Do you need a contract to connect? • Yes, a contract is required to connect. This letter does not constitute a contract or an offer in whole or in part to provide a connection to Uisce Éireann’s network(s). • Before the Development can connect to Uisce Éireann’s network(s), you must submit a connection application and be granted and sign a connection agreement with Uisce Éireann. When should I submit a Connection Application? • A connection application should only be submitted after planning permission has been granted. Where can I find information on connection charges? • Uisce Éireann connection charges can be found at: https://www.water.ie/connections/information/charges/ Who will carry out the connection work? • All works to Uisce Éireann’s network(s), including works in the public space, must be carried out by Uisce Éireann*. *Where a Developer has been granted specific permission and has been issued a connection offer for Self-Lay in the Public Road/Area, they may complete the relevant connection works Fire flow Requirements • The Confirmation of Feasibility does not extend to fire flow requirements for the Development. Fire flow requirements are a matter for the Developer to determine. • What to do? - Contact the relevant Local Fire Authority Plan for disposal of storm water • The Confirmation of Feasibility does not extend to the management or disposal of storm water or ground waters. • What to do? - Contact the relevant Local Authority to discuss the management or disposal of proposed storm water or ground water discharges. Where do I find details of Uisce Éireann’s network(s)? • Requests for maps showing Uisce Éireann’s network(s) can be submitted to: datarequests@water.ie RECEIVED: 09/07/2026 What are the design requirements for the connection(s)? • The design and construction of the Water & Wastewater pipes and related infrastructure to be installed in this Development shall comply with the Uisce Éireann Connections and Developer Services Standard Details and Codes of Practice, available at www.water.ie/connections Trade Effluent Licensing • Any person discharging trade effluent** to a sewer, must have a Trade Effluent Licence issued pursuant to section 16 of the Local Government (Water Pollution) Act, 1977 (as amended). • More information and an application form for a Trade Effluent License can be found at the following link: https://www.water.ie/business/trade-effluent/about/ **trade effluent is defined in the Local Government (Water Pollution) Act, 1977 (as amended) RECEIVED: 09/07/2026 Section B – Details of Uisce Éireann’s Network(s) The map included below outlines the current Uisce Éireann infrastructure adjacent the Development: To access Uisce Éireann Maps email datarequests@water.ie Reproduced from the Ordnance Survey of Ireland by Permission of the Government. License No. 3-3-34 Note: The information provided on the included maps as to the position of Uisce Éireann’s underground network(s) is provided as a general guide only. The information is based on the best available information provided by each Local Authority in Ireland to Uisce Éireann. Whilst every care has been taken in respect of the information on Uisce Éireann’s network(s), Uisce Éireann assumes no responsibility for and gives no guarantees, undertakings or warranties concerning the accuracy, completeness or up to date nature of the information provided, nor does it accept any liability whatsoever arising from or out of any errors or omissions. This information should not be solely relied upon in the event of excavations or any other works being carried out in the vicinity of Uisce Éireann’s underground network(s). The onus is on the parties carrying out excavations or any other works to ensure the exact location of Uisce Éireann’s underground network(s) is identified prior to excavations or any other works being carried out. Service connection pipes are not generally shown but their presence should be anticipated. RECEIVED: 09/07/2026