Loading...
HomeMy WebLinkAbout2560502 - F.I. Received Doc. - Plannng Statement 1 | P a g e PLANNING STATEMENT In respect of PERMISSION FOR RESIDENTIAL DEVELOPMENT EMYVALE PLANNING REFERENCE 25/60502 Prepared by GENESIS PLANNING CONSULT AN TS On behalf of GEDA CONSTRUCTON LTD MAY 2026RECEIVED: 09/07/2026 2 TABLE OF CONTENTS PAGE NO 1 INTRODUCTION 3 1.1 Overview 3 1.2 Site location and context 4 1.3 Developer Background 5 2 HOUSING DEMAND AND POPULATION GROWTH 6 3 SUPPORT FOR SOCIAL HOUSING 12 4 PLANNING POLICY CONTEXT 13 4.1 Overview 13 4.2 National Planning Framework 13 4.3 Housing For All 15 4.4 RSES 16 4.5 Sustainable Rural Housing Guidelines 16 4.5 Monaghan County Development Plan 2025-2031 17 5 FURTHER INFORMATION RESPONSE 18 5.1 Overview 18 5.2 Matter One: Existing Context of the Village 18 5.3 Matter Two: Demand for the proposal 21 5.4 Matter Three: Sequential Development 22 5.5 Matter Four: Permission 2460235 23 5.6 Other Matters 24 6 SUMMARY & CONCLUSION 26 RECEIVED: 09/07/2026 3 1 INTRODUCTION 1.1 Overview 1.1.1 This planning statement is in support of an application seeking permission for a residential development under planning reference 25/60502 on subject lands at Scarnageeragh, Emyvale. 1.1.2 This statement sets out how the proposed development will be consistent with relevant planning policies which include the NPF, Housing For All, Section 28 guidelines ‘Sustainable Rural Housing: Guidelines for Planning Authorities’ and the pro visions of the Monaghan County Development Plan 2025-2031. 1.1.3 Also matters raised as Further Information point 1 are addressed, with separate enclosures by the project team addressing points 2-8 also addressed. 1.1.4 Further Information point one states: ‘It is noted the development seeks to rely on provisions under section 15.8.10 of the Monaghan County Development Plan 2025-2031 which pertains to social housing only. Consequently, the proposed development can only be justified at a location outside the settlement envelope if it is clearly demonstrated that there is demand for social housing. On the basis of the information provided, and noting an extant permission for residential development within the village boundary (Ref. No. 24/60235), the Planning Authority are not satisfied that (a) there is a need for the level of social housing proposed, and (b) the proposal contributes to sequential development. The applicant is advised to provide robust justification for the proposed development in accordance with Section 15.8.10 of the Development Plan.’ 1.1.5 In response this statement addresses matters raised both in terms of policy context and analysis of lands within the village to demonstrate how it is proper planning for the proposal to be granted permission. 1.1.6 On review of matters raised we say material considerations support the proposal in terms of: • Housing demand; • Settlement context; • Support for Social Housing; • Policy Context; • Other Matters: Precedent. RECEIVED: 09/07/2026 4 1.2 Site Location and context 1.2.1 The subject lands are positioned in the core of the village, albeit not within the settlement limit as defined under the Monaghan County Development Plan. 1.2.2 The lands are in a residential area and comprise a partly brownfield and undeveloped greenfield parcel of lands. Figure 1 Site location and context RECEIVED: 09/07/2026 5 1.3 Developer background 1.3.1 We take this opportunity to highlight the prospective applicant GEDA Construction are industry leading developers in the Country. 1.3.2 As per the company website: ‘First established in 1982, we now operate throughout Ireland and The East Midlands in England. We’ve built a huge legacy of Civil, Commercial and Building projects throughout these regions and continue to maintain a strong reputation in the spaces we’ve transformed.’ 1.3.3 Also relevant the applicant have delivered several housing schemes for Monaghan County Council in recent years which include: -Plas Lorcan, Contract with MCC 43 units social housing 2020 -Coil Darach, Castleblayney 30 units 2021 -Knockcarrick, Annyalla 40 units 2023 -Sli Na Coille Contract 21 units for MCC April 26 -Sli Lorcan Contract 49 units for MCC du delivery Jun 26 1.3.4 We refer to the applicant’s website for more background information: www.geda.co.uk 1.3.5 This is relevant in that there is a clear intent to develop the proposed scheme and achieve socio-economic betterment for Emyvale with the housing units proposed. 1.3.6 Also relevant is the provision of the Section 28 Guidelines ‘NPF Implementation: Housing Growth Requirements’ which set out a need for: ‘a particular focus on the likelihood that the lands identified for residential development within the plan will come forward for development within the remaining period of the plan.’ RECEIVED: 09/07/2026 6 2 HOUSING DEMAND & POPULATION GROWTH 2.1 As all Stakeholders are aware Ireland faces a critical need for increased housing due to a combination of economic growth, population expansion and a legacy of underinvestment in housing construction. 2.2 An adequate supply of social housing units is vital to ensure that people who are unable to afford housing from their own resources can avail of appropriate housing. As the country recovered from the economic downturn in the 2010s it’s population surged, particularly in urban areas where job opportunities are concentrated. 2.3 We highlight this demographic shift has significantly outstripped the available housing supply, leading to soaring property prices and rental costs, making housing unaffordable for many, especially younger generations and lower-income households. 2.4 To set the context the housing shortage has severe adverse social implications, contributing to increased homelessness, overcrowding and poorer health outcomes while also hampering economic growth by deterring potential investment. 2.5 To address this issue, substantial efforts are required to accelerate the number of housing units being built and ensure that housing remains both affordable and accessible to all segments of the population. As a means of supporting those unable to secure housing through their own resources, the Government has identified the provision of social housing as a key solution. 2.6 Indeed we highlight for the Planning Authority the Report of The Housing Commission, published in 2024, estimates a deficit of between 212,500 and 256,000 homes in Ireland as of the Census 2022. 2.7 The report states the following in relation to Ireland’s social housing deficit: “After a decade of pent-up demand caused by chronic undersupply, a step-change in building output is essential to address the housing deficit and to meet ongoing requirements…This requires exceptional and radical measures to deliver a substantial amount of housing in the shortest time practicable… There should be a targeted increase in the proportion of social and cost-rental housing to 20% of the national stock, ensuring an appropriate tenure mix. This is necessary to address the dearth of such housing. Nothing less is needed…Housing of all types and tenures will only be put on a firm foundation with the stabilisation provided by redressing the undersupply of social, affordable and cost-rental housing.” RECEIVED: 09/07/2026 7 2.8 To set the context in terms of demand the graph below captures legacy deficit as house building fell significantly from 2008. Figure 2 Housing Units built by the Public Sector 2.9 Also the Housing Plan for Ireland, Housing for All, sets a core objective that: “Everybody should have access to sustainable, good quality housing to purchase or rent at an affordable price, built to a high standard, and located close to essential services, offering a high quality of life.” 2.10 The Housing for All plan seeks to deliver a sufficient supply of housing to accommodate Ireland’s growing population, ensuring that homes are available at prices and rents that are genuinely affordable. The Plan aims to provide more than 10,000 social homes each year, with an average 9,500 new build social housing homes to be delivered by 2026 . The plan states that: “Increased provision of social housing must involve more emphasis on new-builds by Local Authorities and an ending of long-term leasing of private accommodation by Local Authorities through phasing out new entrants and focusing on new-build to provide social homes.” RECEIVED: 09/07/2026 8 2.11 Most recently the acute need for Housing has been set out in the report by the Housing Commission report. 2.12 We summarise key extracts of relevance to this application: Executive Summary: • ‘A major issue of concern to the Commission is Ireland’s housing deficit. It is critical that this housing deficit is addressed through emergency action. Coupled with this is the need for a step change increase in the level of housing supply on an ongoing basis. • There should be a targeted increase in the proportion of social and cost -rental housing to 20% of the national stock, ensuring an appropriate tenure mix. A long -term commitment to stable levels of public financing will also be crucial, supplementing the funding coming from private sources.’ RECEIVED: 09/07/2026 9 2.13 In addition to the National scenario and to establish the context in terms of local demand for the proposal we have reviewed the delivery of Scheme Housing in the County over the last 6 years since the 2019 CDP was adopted, as this is helpful to understand the legacy deficit in recent years against population growth. 2.14 In summary 2.4 of the 2019 CDP identified a Core Strategy Target of 5141 units in the County; reproduced below. For Towns and Villages we note the previous CDP had a Target to deliver 3910 units therein. Figure 3 Table 2.4 of the Monaghan CDP 2019-2025 2.15 When CSO data is reviewed our analysis finds that across the County there was only 762 scheme and apartment units delivered in the lifespan of the previous CDP. We highlight this is only 19.48% of the CDP target over the 6 year period. Table 1 Scheme Housing and Apartments from Q2 2019-Q4 2025 in Monaghan (source CSO) 2.16 This is highlighted as the delivery of scheme housing is intrinsically linked to the delivery of Social and Affordable Housing in the County, through either Part V compliance or designated Social and Affordable Housing schemes. 2.17 In summary our analysis finds that with the previous Core Strategy target not met this has resulted in considerable pent-up-demand for residential units, which is accentuated by population growth rates. RECEIVED: 09/07/2026 10 2.18 Furthermore to inform population growth analysis we note the CSO data for 2022 show that County Monaghan’s population has grown more significantly since the Census taken in 2016, increasing by 3,902 persons to 65,288 persons. We note this represents an increase of 6.4% over the intercensal period, an average annual increase of 1.06% compared to a state average of 1.3%. 2.19 In terms of growth of the area the CSO map data set ‘Population Density and Area Size by Electoral Division’ is helpful to gain an understanding on growth in the area. 2.20 As can be seen the N2 corridor and north Monaghan environs has experienced population growth, and the connections to the wider area explain this alignment between connectivity, jobs and locational principles for where homes are required. Indeed the cross-border travel patterns also partly explain this growth along the N2 corridor. Figure 4 Population growth by Electoral Division (source: CSO) 2.21 On assessment we consider the CSO population growth for the area is considered the most reliable data source to determine population growth in a rural area such as Emyvale, as it best captures the emerging population change at a local level. 2.22 In this context we submit the wholistic assessment of housing need and demand in the area is therefore best achieved when including the trend of population growth against the low delivery of scheme housing; particularly given the need to deliver sustainable development within settlements rather than one-off rural housing. 2.23 Furthermore in relation to the 2025 Monaghan CDP we note the Core Strategy now sets out a need for 6228 housing units to be delivered in the County; which recognises the population growth and need to increase the delivery of housing. This is addressed in more detail under the local policy context below. EMYVALE RECEIVED: 09/07/2026 11 2.24 Finally at a local level in Emyvale our analysis finds that over the last 13 years since the 2013 CDP was adopted there has only 14no. scheme housing units delivered; permission 19/210 refers. These units were delivered for Monaghan County Council via a local developer in conjunction with Tuath. Figure 5 Site location and context 2.25 In this context it can be concluded there has been a low-delivery of village housing over two consecutive development plans (ie. since 2016 census data) despite the growing population of the area. RECEIVED: 09/07/2026 12 3 SUPPORT FOR SOCIAL HOUSING 3.1 The over-arching project rationale is to deliver the proposed residential development as Social Housing. 3.2 By way of background discussions have been held between the prospective applicant and Housing Section in Monaghan County Council. 3.3 The enclosed cover letter sets out the planning background: 3.4 Also we refer to correspondence from Housing Section, Monaghan Co Council shown opposite which clearly explains the social housing need in Emyvale and fully supports the proposal. This is discussed in more detail below under policy responses. Social Housing Need & Unit Type Overall Need Proposed Unit Mix 1bed units 22 0 2bed units 18 20 3bed units 8 2 4 bed units 4 8 Table 2 Housing Need and the Proposal RECEIVED: 09/07/2026 13 4 POLICY CONTEXT 4.1 Overview 4.1.1 The key planning policy relative to proposal are as follows: • National Planning Framework 2040 • Housing For All • Regional Spatial Economic Strategy • Sustainable Rural Housing Guidelines • Monaghan County Development Plan 2025-2031 4.1.2 For reference we set out in this section key extract s from the policy and how the proposal is compliant and supported. 4.2 National Planning Framework (NPF) 2040 (First Revision) 4.2.1 The NPF sets out the importance of development within existing urban areas by ‘making better use of under-utilised land including ‘infill’ and ‘brownfield’ and publicly owned sites together with higher housing and job densities, better services by existing facilities and public transport.’ 4.2.2 In terms of specific objectives contained within the NPF we highlight the following: • Objective 7 ‘Deliver at least 40% of all new homes nationally, within the built -up footprint of existing settlements and ensure compact and sequential patterns of growth .’ • Objective 11 ‘Planned growth at a settlement level shall be determined at development plan-making stage and addressed within the objectives of the plan. The consideration of individual development proposals on zoned and serviced development land subject of consenting processes under the Planning and Development Act shall have regard to a broader set of considerations beyond the targets including, in particular, the receiving capacity of the environment’. • Objective 14 ‘Regenerate and rejuvenate cities, towns and villages of all types and scale as environmental assets that can accommodate changing roles and functions, increased residential population and employment activity, enhanced levels of amenity and design and placemaking quality, in order to sustainably influence and support their surrounding area to ensure progress toward national achievement of the UN Sustainable Development Goal.’ • Objective 20 states that ‘there will be a presumption in favour of development that encourages more people, jobs and activity within existing urban areas, subject to development meeting appropriate planning standards and achieving targeted growth.’ 4.2.3 Of note is section 4.5 of the NPF which states: ‘The NPF targets a significant proportion of future urban development on infill/brownfield development sites within the built footprint of existing urban areas. This is applicable to all scales of development, from the largest city to the smallest village.’ 4.2.4 Response: The proposed development is consistent with the aforementioned objectives of the NPF given the overarching national policy to increase residential development in settlements, particularly so given the subject lands are brownfield, sequentially appropriate, serviced and Tier 1 as defined under appendix 1 of the NPF. RECEIVED: 09/07/2026 14 4.2.5 Overall a ‘presumption in favour’ of such an urban renewal scheme is required by the NPF in terms of policy objectives to deliver increased housing in such towns and villages. 4.2.6 Also relevant to the NPF (Revised) is the accompanying Section 28 Guidelines: 4.2.7 As set out in the Guidelines they provide updated housing growth requirements to planning authorities in order to facilitate the revision and update of development plans in accordance with the National Planning Framework – First Revision (2025). The Guidelines interpret the national housing growth requirements identified in the Revised National Planning Framework for implementation through development plans. 4.2.8 Whilst the primary purpose of the Guidelines is to inform revised housing targets they are relevant to assesssing need for increased housing, particularly as the Housing Target for Monaghan has been allocated an uplift based on ESRI Population Forecasts. Section 1.2 of the Guidelines sets out: ‘Comparing estimated demand as per the ESRI’s projections to actual delivery (new build plus previously unfinished housing estates built out, as per the Central Statistics Office (CSO) suggests unmet demand of approximately 140,000 arising over the period 2017 to 2024. The methodology for deriving this figure involved applying alternative headship rates to the population to estimate the number of households based on these headship rates. Assuming a start year of 2025, and the objective of meeting unmet demand in the period to 2034, thistranslates to an annual average of 13,900 dwellings per annum over the period. This means an estimated total housing demand of c.55,000 dwellings per annum to 2034 and an estimated total housing demand of c.41,000 dwellings per annum between 2034 and 2040.’ 4.2.9 Page 8 of the Guidelines further sets out: ‘For the purposes of these Guidelines, planning authorities should address the scope for additional provision of up to 50% in excess of the baseline housing growth requirement set out in Appendix 1, in light of the urgent need to increase housing delivery and to optimise the ability to deliver on the housing requirements of the Revised NPF. ‘Additional provision’ recognises the fact that, for a variety of reasons, a relatively significant proportion of zoned lands are not activated over the period of a development plan.’ (our emphasis) RECEIVED: 09/07/2026 15 4.2.10 We note the provisions for County Monaghan is an uplift in Housing Targets; shown below. 4.2.11 In this context we say this further supports the proposal in that the Core Strategy under the 2025 CDP and housing allocation for villages such as Emyvale are not aligned with updated population forecasts nor housing demand. 4.2.12 Notwithstanding these Guidelines are to inform the review of the Monaghan CDP we refer to the Guidelines to set the planning context and weighting of material considerations in that there is a clear need to increase housing delivery within the context of growing population levels along with the reality that a relatively significant proportion of zoned lands are not activated over the period of a development plan 4.2.13 Indeed also relevant are the provisions of the 2025 Planning Act wherein it expressly recognises the need for Housing Targets and flexibility. Whilst not yet enacted we say this is also a Material consideration to the proposal. 4.3 Housing For All 4.3.1 Housing For All was launched in 2021 with the objective that everybody should have access to sustainable, good quality housing to purchase or rent at an affordable price, built to a high standard and located close to essential services, offering a high quality of lif e. 4.3.2 Housing For All is based on four key pathways as below. 4.3.3 Also relevant are the following extracts: RECEIVED: 09/07/2026 16 • Section 2.2.1: Deliver More Social Homes ‘The Government is committed to increasing social housing delivery and will work with our delivery partners to ensure that housing is available to the most vulnerable in society. Local Authorities have a key role in the delivery of homes and targets will b e set for delivery by them with new Local Authority Housing Delivery Actions Plans, setting out how they plan to deliver on the objectives of Housing for All.’ • Section 2.4.1: Expand the Housing Options for Older Persons ‘Under Housing for All, we will increase the housing options available to older people to facilitate ageing in place with dignity and independence, including policies and operational supports for older people considering right-sizing to smaller housing homes. .Local Authorities must also consider the needs of older people in the wider planning process.’ 4.3.4 Response: We submit the proposal is consistent with Housing For All in that it will improve the supply of residential units for Emyvale in a sustainable manner. 4.4 Regional Spatial and Economic Strategy (RSES) 4.4.1 The RSES sets out the spatial growth strategy for the border region and sets out a broad range of policies and objectives to encourage sustainable and economic growth of the region. 4.4.2 As set out in the RSES regarding smaller towns, villages and rural areas are home to almost 80% of the region’s population and as such represent a sizeable cohort of the population and land area. 4.4.3 As stated in section 3.5 of the RSES: ‘the future role and function of our large network of smaller towns and villages across the region needs to be reimagined, addressing economic, physical and social decline issues. The regeneration of our smaller towns and villages is now a major priority action for our region. The health of our villages, and towns can be significantly influenced through the delivery of new housing through the utilisation of existing buildings, brownfield/infill sites or otherwise.’ 4.4.4 The RSES continues to state: ‘The emphasis will change from place to place but in all cases the approach should be to provide a range of attractive housing choices appropriate to the needs and character of the place, including the provision of serviced sites and to provide for low den sity housing demand, as an alternative to living in one off houses outside towns and villages.’ 4.4.5 Key future priorities include supporting: • ‘the regeneration and renewal of small towns and villages in rural areas.’ • RPO 3.3 ‘Deliver at least 20% of all new housing in rural areas on brownfield sites.’ 4.4.6 Response: The proposed development is consistent with the policy objectives of the RSES; in particular it’s emphasis on the promotion of villages in rural areas and development on brownfield sites. 4.5 Sustainable Rural Housing Guidelines 4.5.1 The Guidelines recommend that Planning Authorities should respond positively to the housing needs of rural communities as an integral part of the sustainable development of rural areas RECEIVED: 09/07/2026 17 and accommodates applicants wishing to build houses in rural areas in support of that vital national objective. 4.5.2 In terms of specific objectives contained within the guidelines we note section 2.3 ‘strengthening rural villages & towns’ is relevant and states: ‘A range of different housing options in small towns, villages and in more rural areas is required to meet the differing needs of the people who live in those communities, and that ‘Development of individual serviced sites or housing schemes of appropriate scale and character, within, or in the vicinity of small rural towns and villages can be encouraged.’ 4.5.3 Section 2.3 continues to state that ‘Using the development plan and local plan processes, planning authorities should therefore make every effort to harness all of these measures to ensure that sufficient high quality, well located and affordable development can take place.’ 4.5.4 Response: In the context of the guidelines and policy context aforementioned we submit the proposal is consistent with the approach set out under the guidelines for a residential scheme of appropriate scale and character in Emyvale. 4.6 Monaghan County Development Plan 2025-2031 4.6.1 For conciseness the relevant sections and policies are set out below. • 2.7 Regeneration of Existing Lands It is considered appropriate to include for the reuse, regeneration and renewal of land through active land management over this Plan period, having regard to legislative requirements, and to national and regional policy. The NPF target of delivering 30% o f new housing within the existing built-up footprint of settlements, on infill and brownfield lands and the principles contained within the Town Centre First Policy are key considerations in this regard. The regeneration of land (as defined by the Urban Regeneration and Housing Act 2015) and buildings in need of development and renewal throughout the County, is an objective of this development plan and Monaghan County Council will seek to develop and improve areas in need of development and renewal, particularly within designated settlements. It is therefore important to acknowledge that a proportion of future urban development will occur on infill/brownfield/regeneration lands within the built envelope of existing settlements. In order to encourage this type of development within the urban centres, a relaxation of some development management standards will be considered where appropriate. Having regard to this target, it is considered appropriate that up to 20% of the population growth could be provided for through development of these sites. Therefore, the amount of greenfield lands required to be zoned for residential use is based on 80% of the population growth. This has been reflected in the Core Strategy Table 1. • 15.8.10 Residential Development in Tier 4 Settlements Residential development and serviced sites on suitable lands located within any of the defined Tier 4 settlements which have capacity within existing public foul drainage systems, will be considered subject to compliance with the following: a) The submission of evidence to the satisfaction of the planning authority that there is demand for the proposed residential development taking account of the extent, nature and status of extant permissions for residential development, and vacant residential properties in the settlement. RECEIVED: 09/07/2026 18 b) The proposal contributes to the sequential development of land from the centre of the settlement outwards and/or represents an infilling of the existing settlement envelope. c) The scale and density of the development accords with the character of the village. Notwithstanding the requirements of criteria a-c above for Tier 4 settlements and Section 15.8 ‘Multi Unit Residential Developments’ of the Monaghan County Development Plan 2025-2031, and taking into account the objectives of the ‘Housing for All Plan’ to address the shortage of housing, the Planning Authority may favourably consider proposals for social housing developments which are outside the defined Tier 4 settlement limit where a clear demonstrable need is proven to the satisfaction of the Planning Au thority, and where the lands are contiguous to the settlement limit and can be adequately serviced. 4.6.2 Response: In the context of the policy context aforementioned we submit the proposal is consistent with the approach set out under the guidelines for a residential scheme of appropriate scale and character in Emyvale. We address section 15.8.10 in more detail under Section five below. RECEIVED: 09/07/2026 19 5 FURTHER INFORMATION RESPONSE 5.1 Overview 5.1.1 Further Information point one states: ‘It is noted the development seeks to rely on provisions under section 15.8.10 of the Monaghan County Development Plan 2025-2031 which pertains to social housing only. Consequently, the proposed development can only be justified at a location outside the settlement envelope if it is clearly demonstrated that there is demand for social housing. On the basis of the information provided, and noting an extant permission for residential development within the village boundary (Ref. No. 24/60235), the Planning Authority are not satisfied that (a) there is a need for the level of social housing proposed, and (b) the proposal contributes to sequential development. The applicant is advised to provide robust justification for the proposed development in accordance with Section 15.8.10 of the Development Plan.’ 5.1.2 In response this statement addresses matters raised which are: (I) Existing context of the village (II) Demand for the proposal and need for the level of social housing proposed (III) How the proposal contributes to sequential development (IV) Permission 2460235. 5.2 Matter One: Existing context of the village 5.2.1 As shown in the analysis below the built character of the village extends in a linear manner along the roads and within the 50kph restrictions of the village limits. 5.2.2 The village does not have a centre per se, but rather is typical linear settlement pattern that has developed historically along the roads. 5.2.3 As per the core strategy we submit the proposal is indeed ‘commensurate with the nature’ and the historical linear settlement pattern in the village. It is also a sequentially appropriate site. 5.2.4 The proposal will therefore achieve consolidation of the village and result in a residential scheme that is consistent with the existing settlement pattern. 5.2.5 In addition we highlight the existing settlement pattern has been developed to date in a manner that has responded to development constraints, with there being parcels of lands elsewhere being left undeveloped. 5.2.6 As shown in our analysis below there are several constraints that include flood zones, existing business premises, backlands which are not accessible and a farm yard all of which have influenced the settlement pattern and results in all lands within the settlement limit as being either inappropriate or not available for development. 5.2.7 We submit these constraints are to be noted, in that sequential development is not to be assessed in isolation but instead considered against the context of both what lands are suitable for development and how to prioritise/direct development onto sequentially appropriate lands. RECEIVED: 09/07/2026 20 5.2.8 In this context we submit the planning assessment has to have regard to these material considerations and reach a balanced assessment that this is a scenario where other lands within the village are either: (i) not suitable for development; (ii) not brownfield/serviced; (iii) not available for development; and (iv) not of adequate size to deliver social housing in a wholistic way and by a single developer that will be of such socio-economic benefit to the area. 5.2.9 Of relevance we note there are two main tests in determining whether a consideration in material and relevant: (i) it should serve or be related to the purpose of planning- it should therefore relate to the development and use of land; and (ii) it should fairly and reasonably relate to the particular application.1 5.2.10 It is our considered view the above factors are key material considerations in assessment of what lands are most suitable and should be prioritised for development in the village. 1 As defined under case law Cook J (Stringer V MHLG) RECEIVED: 09/07/2026 21 RECEIVED: 09/07/2026 22 5.3 Matter Two: Demand for the proposal and need for the level of social housing proposed 5.3.1 The over-arching project rationale is to deliver the proposed residential development as Social Housing. 5.3.2 By way of background discussions have been held between the prospective applicant and Housing Section in Monaghan County Council. The enclosed cover letter sets out the planning background: 5.3.3 Also we refer to correspondence from the Housing Section which clearly explains the social housing need in Emyvale and fully supports the proposal. Social Housing Need & Unit Type Overall Need Proposed Unit Mix 1bed units 22 0 2bed units 18 20 3bed units 8 2 4 bed units 4 8 Table 3 Housing Need and the Proposal 5.3.4 On these basis the demand is evident and met. RECEIVED: 09/07/2026 23 5.4 Matter three: How the proposal contributes to sequential developmen t 5.4.1 As shown the lands are within the CSO settlement boundary and in a central location. 5.4.2 We say the lands clearly represent the sequential development of the village and are contiguous to the settlement limit. Figure 7 Sequential development of the village and environs RECEIVED: 09/07/2026 24 5.5 Matter four: Permission 2460235 5.5.1 We note the extant permission 24/60235 was granted under the provisions of the previous 2019-2025 CDP and the previous Core Strategy. 5.5.2 Also on review of 24/60235 we note: • It was not proposed as Social Housing; • It has not commenced. 5.5.3 In this context we also highlight that notwithstanding permission 24/60235 the Housing Section in Monaghan County Council are fully supportive of the 30no. units now proposed under 2560502 by GEDA. 5.5.4 Indeed it is to be noted that the Social Housing demand in isolation is 60 units for Emyvale, and even with both permission 24/60235 and 25/60502 delivered will not meet this demand combined. 5.5.5 Furthermore outside of the demand for Social Housing we also highlight that in terms of housing units available we note there are no available housing units for sale in Emyvale. (source Daft.ie reviewed 23rd April 2026). 5.5.6 This is a material consideration in that availability of housing in a village is proper planning to cater for local population growth in a settlement rather than continued one-off rural housing to meet local needs/demand for housing provision. RECEIVED: 09/07/2026 25 5.6 Other Matters 5.6.1 To assist the Planning Authority we take this opportunity to highlight a comparable planning scenario under permission reference 25/60326 for 21no. dwellings in Rockcorry. Figure 8 Subject lands relative to Rockcorry Settlement Limit 5.6.2 As correctly noted in the planner’s report: ‘In principle and subject to (a) all housing being social (which can be conditioned) and (b) evidence of housing demand, the Planning Authority is of the opinion that development at this location is acceptable in principle and will help to secure objective S04 and policy RD SP1 of the Monaghan County Development Plan 2025-2031.’ RECEIVED: 09/07/2026 26 5.6.3 In summary the same planning principles are applicable in terms of village housing proposed on sequentially appropriate lands which were supported in terms of Social Housing and granted permission. 5.6.4 In the context of the above we submit this precedent demonstrates how the correct planning assessment has been made which take account of the wider constraints in Tier 4 villages and how to achieve proper planning and sustainable development. 5.6.5 As the Planning Authority will note sections 6.7 and 7.15 of the Development Management Guidelines set out: ‘6.7: All reasonable efforts should be made to research the planning history of sites and their general environs, including details of any pre-application consultation, as this is very important to help ensure planning authorities take a consistent approa ch to planning proposals in a particular area over time. ‘7.15 A statement of objectives in a development plan should not be regarded as imposing a blanket prohibition on particular classes of development and does not relieve the Planning Authority of responsibility for considering the merits or otherwise of particular applications.’ RECEIVED: 09/07/2026 27 6 SUMMARY AND CONCLUSION 6.1 As detailed in our responses the relevant National, Regional and Local policy context provides clear support for the proposal given: • The policy context; • The sequential nature of the lands; • Existing pattern of development and constraints within Emyvale which means there are no other lands of comparable size which can deliver the proposed scheme in a wholistic manner; • The development being considered as a whole in terms of benefit to the area and overarching policy at local and national level to deliver more social housing; • Comparable precedents and material considerations under permission 25/60326. 6.2 We have demonstrated how Further Information point one is fully addressed. 6.3 In summary the proper planning and sustainable development of the area will be achieved by permission being granted for the scheme. 6.4 Also the material considerations weigh in favour of the proposal. 6.5 As the Planning Authority will note all decisions are a matter of planning judgement. To achieve increased urban consolidation and infill on sequentially appropriate lands requires schemes such as this proposal to be supported. This is a clear policy direction set out in the Report of the Housing Commision and all Government policies that seek to increase building of Social Housing schemes. 6.6 We submit the over-arching policy objective and proper planning of what is an infill site is best achieved by the proposed design. For reference we refer to how the Courts have set out in recent years how development plan objectives are to be interpreted in broad terms and how best to achieve good planning. 6.7 As set out in the High Court Judgement Alice O’Donnell V An Bord Pleanala, Minister for Housing & Attorney General (2023, IEHC 381): Para 69 ‘There is no necessity or logic to reading the statute in an extremely inflexible manner that would put councils in handcuffs, as being limited to the broad headings of recreational, commercial, industrial, agricultural and so on alone, without any ability to make any more specific decision as to the types of residential, commercial or other purposes that are appropriate for a particular piece of land. That would be a massive intrusion on the autonomy and freedom of the statutory decision-maker which would be unjustified by any clear basis in the text. It would also be highly illogical in planning terms. Such an unwarranted interpretation would conflict with the express statutory requirement of proper planning and sustainable development, which imply that a decision-maker must have sufficient flexibility to achieve those ends. We are not just playing with words here – this is about whether councils are to be hamstrung in their assigned statutory mission to promote good planning.’ 6.8 In the context of the attached details and over-arching government policies which all seek to provide much needed social housing we trust that the application will meet with favourable assessment by the Planning Authority. Yours sincerely, Ronan Woods Ronan Woods Director RECEIVED: 09/07/2026 28 Appendix 1 Correspondence from applicant RECEIVED: 09/07/2026 Ref: Proposed development site at Market House Lane, Emyvale, County Monaghan 23rd March 2026 Hi Ronan, GEDA can confirm that preliminary talks took place before the planning application was made with representatives from Monaghan County Council in which GEDA confirmed this housing scheme would be designed in line with the Quality Homes For Sustainable Communities Policy to provide much needed social housing in North Monaghan. Regards Philip Rowland Design and development manager. GEDA Construction Ltd HEAD OFFICE: 36 Moor Road, Dungannon, County Tyrone, BT71 4QB T: 028 8774 7600 RECEIVED: 09/07/2026