Loading...
HomeMy WebLinkAbout2662 - Site Assessment ReportLE I SERVICES __ Engineering Design Consultancy O HER NO. tf' 2 6 i C 2 LTONAGHAN CO. ` i,,.19 MO 4. Co. Co. FL.A ':t; 9 r. c0 4* C`i ON 07 JUL 20'6 Site ������ �[� Sty Assessment for one-off Wastewater Treatment Systems MARTIN TURNS Martin Burns, Corlea, CMX, Co. Monaghan. Client: Martin Burns Site: Corlea, CMX, CO. Monaghan Report By: Micheal Murtagh BEng, MIEI, CEng Date: 29/04/2026 M: +353 87 7570725 E: info@berservices.ie W: www.berservices.ie APPENDIX A: SITE CHARACTERISATION FORM File Reference: Prefix: Mr First Name: Martin Surname: Burns Address: Site Location and Townland: Corlea, CMX, Co. Monaghan Corlea, CMX, Co. Monaghan Number of Bedrooms: I3 Maximum Number of Residents: Comments on population equivalent Population Equivalent of less than 10. The total design waster water load is established from the max. population based on the No. of bedrooms. For the purpose of the COP the minimum house size is 2 beds which equates to a design capacity of 4 PE. Every additional bedroom and additional 1 PE is added. Proposed Water Supply: Mains Private Well/Borehole Group Well/Borehole LII , ,i.,,,,',�� 1, ,'; .. ,,; t. �• .s� •� Soil Type, (Specify Type): Subsoil, (Specify Type): Sandstone and shale till (Lower Palaeozoic) Fill derived from Lower Palaeozoic sandstones and shales Bedrock Type: Late Ordovician -Silurian deep marine greywacke, mudstone (Longford -Down) Aquifer Category: Regionally Important Locally Important Poor PI Vulnerability: Extreme High ❑✓ Moderate Low Groundwater Body: Monaghan Status Good Name of Public/Group Scheme Water Supply within 1 km: n/a Source Protection Area: ZOC ❑ SI SO ❑ Groundwater Protection Response: R21 Presence of Significant Sites (Archaeological, Natural & Historical): Past experience in the area: VIA Good drainage Comments: (Integrate the information above in order to comment on: the potential suitability of the site, potential targets at risk, and/or any potential site restrictions). This site may be suitable subject to further analysis. Integrating the above information the groundwater appears to be the main target at risk. Note: Only information available at the desk study stage should be used in this section. 3.1 Visual Assessment Landscape Position: Middle of the slope Slope: Steep (>1:5) U Shallow (1:5-1:20) U Relatively Flat (<1:20) U Slope Comment slope at wwts location Surface Features within a minimum of 250m (Distance To Features Should Be Noted In Metres) Houses: House located West of Proposed percolation area- 90m Existing Land Use: kgricultural Vegetation Indicators: Va Groundwater Flow Direction: Westerley Direction as indicated on site sketch Ground Condition: )ry & firm Underfoot Site Boundaries: )itch/fence as indicated on Site Layout Map 3.1 Visual Assessment (contd.) Roads: Public Road West of the proposed WWTS Outcrops (Bedrock And/Or Subsoil): None within 100m of the proposed site Surface Water Ponding: None within 100m of the proposed site Lakes: None within 100m of the proposed site Beaches/Shellfish Areas: ie within 100m of the proposed site Wetlands: None within 100m of the proposed site Karst Features: None within 100m of the proposed site Watercourses/Streams:' Stream located 50m West of Proposed Percolation Area •Note and record water level 3.1 Visual Assessment (contd.) Drainage Ditches:" None within 100m of the proposed site Springs:* None within 100m of the proposed Site Wells:" None located within 100m of the Proposed site Comments: (Integrate the information above in order to comment on: the potential suitability of the site, potential targets at risk, the suitability of the site to treat the wastewater and the location of the proposed system within the site). Integrating the above information groundwater would seem to be the main potential target at risk. Further analysis is to be carried out via trial hole inspection and percolation tests. 'Note and record water level 3.2 Trial Hole (should be a minimum of 2.1m deep (3m for regionally important aquifers)) To avoid any accidental damage, a trial hole assessment or percolation tests should not be undertaken in areas which are at or adjacent to significant sites, (e.g. NHAs, SACs, SPAs, and/or Archaeological etc.), without prior advice from National Parks and Wildlife Service or the Heritage Service. Depth of trial hole (m): 2.1 Depth from ground surface Depth from ground surface to bedrock (m) (if present): to water table (m) (if present): 1.7 Depth of water ingress: Rock type (if present): Date and time of excavation: 22 -Mar -2026 09:00 Date and time of examination: 29 -Mar -2026 1000 Depth of Surface and Subsurface Soil/Subsoil Percolation Texture & Plasticity and Soil Density/ Colour**** Preferential Tests Classification`" dilatancy""' Structure Compactness flowpaths 0.1 m II 0.2m II 0.3 m II 0.4m II 0.5m 0 0.6m 0.7 m II 0.8 m II 0.9m II 1.0m I 1.lml 1.2 m II 1.3 m 1.4m II 1.5 m II 1.6m II 1.7m1_I 1.8 m I 1.9m I 2.0 m 2.1 m 2.2m1 2.3m1 2.4 m 0 2.5 m l____ 2.6 m 0 2.7 m I 2.8 m I 2.9m 0 3.0m l____ 3.1 m II 3.2 m 3.3m I 3.4 m Lull I 3.5m 0 n/a structureless R OF Dark Brown Brown PIT Likely Subsurface Percolation Value: 30 Likely Surface Percolation Value: 30 Note: Depth of percolation test holes should be indicated on log above. ('Enter Surface or Subsurface at depths as appropriate). See Appendix E for BS 5930 classification. 3 samples to be tested for each horizon and results should be entered above for each horizon. All signs of mottling should be recorded. 3.2 Trial Hole (contd.) Evaluation: This site appears to be suitable but the the separation distances need to be checked. The wastewater can be treated before entering the groundwater and the effluent will get away without Ponding at the surface. From analysis of the trial pit and the soil Layers a T value of 20-50 would be expected. Further investigation to be carried out via the Percolation tests. 3.3(a) Subsurface Percolation Test for Subsoil Step 1: Test Hole Preparation Percolation Test Hole 1 F 3 Depth from ground surface to top of hole (mm) (A) 300 280 300 Depth from ground surface to base of hole (mm) (B) LI 750L 750 750 Depth of hole (mm) [B - A]LI______________ 450 450 470 Dimensions of hole [length x breadth (mm)] �X320 LI �X340 370 x 380 Step 2: Pre -Soaking Test Holes Pre-soak start Date 28 -Apr -2026 J 28 -Apr -2026 Time 09:00 09:00 2nd pre-soak Date 28 -Apr -2026 28 -Apr -2026 start Time 13:00 13:00 Each hole should be pre-soaked twice before the test is carried out. Step 3: Measuring T100 Percolation Test Hole No. i E 28 -Apr -2026 09:00 28 -Apr -2026 13:00 3 Date of test LII 29-04-2026 29-04-2026 L 29-04-2026 Time filled to 400 mm o9:00 09:00 09:00 Time water level at 300 mm 11:30 11:35 11Ii Time (min.) to drop 100 mm (T100 ) 150.00 155.00 165.00 Average TWO LIII 156.67 If T100> 480 minutes then Subsurface Percolation value >120 - site unsuitable for discharge to ground If T1 < 210 minutes then go to Step 4; If 1100> 210 minutes then go to Step 5; Step 4: Standard Method (where T700 ≤ 210 minutes) Percolation Test Hole 1 2 3 Fill no. Start Finish At (min) Start Finish At (min) Start Finish At (min) Time Time Time Time Time Time (at 300 (at 200 mm) mm) (at 300 (at 200 mm) mm) (at 300 (at 200 mm) mm) 1 11:30 14:25 175.00!11:351114:4111 186.00 11:451114:48!!183.001 2 14:25!!17:47 202.00 14:41 18:06 205.00 14:48 18:2511 217.00 3 17:47 21:4111234.00 18:06 21:581P232.00 18:25!P22:30!!245.00 Average At 203.67 207.67 215.00 Value Average At/4 = [Hole No.1] 50.921(t1) Average At/4 = [Hole No.2] 51.921(t2) Average At/4 = [Hole No.3] 53.751(t3) Result of Test: Subsurface Percolation Value = 52.19 (min/25 mm) Comments: 'he "T" Tests carried out are within the acceptable range as per the EPA CODE OF PRACTICE Jo "P" tests required Step 5: Modified Method (where T100 > 210 minutes) Percolation Test Hole No. Fall of water Time Start Finish Time K„ T — in hole (mm) Factor Time Time of fall = T, Value = T hh:mm hh:mm (mins) / T,, = 4.45 =TT, /K„ 300-250 8.1 0.0011 I 250 - 200 9.7 =� 0.00 pI 200- 150 I 11.9 0� 0.00 I 150-100 I14.1 00 0.0011 I Average T- Value T- Value Hole 1 = (T1) 0.00 Percolation Test Hole No. 3 Fall of water Time Start Finish Time K„ T — in hole (mm) Factor Time Time of fall = T, Value =T, hh:mm hh:mm (mins) /T, =4.45 =T, /K,s 300 - 250 8.1 =� 0.00 l � 250 - 200 9.7 =� 0.00 �� 200 - 150 11.9 =� 0.0011 I I 150-100 I14.1 0.00[ I I Percolation Test Hole No. 2 Fall of water Time Start Finish Time K, T — in hole (mm) Factor Time Time of fall =T, Value = T, hh:mm hh:mm (mins) / T„ = 4.45 = T,; /K 300 - 250 I 8.1 =� 0.00 _= 250 -200 9.7 0� 0.00 �= 200-150 11.9 00 0.00 I I _____I 150 - 100 I 14.1 00 0.00 l[_____ Average T- Value T- Value Hole 2 = (T2) 0.00 Result of Test: Subsurface Percolation Value o (min/25 mm) Comments: Average I T- Value T- Value Hole 3 = (T2) 0.00 1 1 3.3(b) Surface Percolation Test for Soil Step 1: Test Hole Preparation Percolation Test Hole 1 2 3 Depth from ground surface to top of hole (mm) 1E 1II0 II Depth from ground surface to base of hole (mm) 450 420 460 Depth of hole (mm) 450 420 460 Dimensions of hole [length x breadth (mm)] L_300 x280 280 290 x 280 275 x 290 Step 2: Pre -Soaking Test Holes Pre-soak start Date 28 -Mar -2026 28 -Mar -2026 28 -Mar -2026 Time 09:00 09:00 09:00 2nd pre-soak Date 28 -Mar -2026 28 -Mar -2026 L28-Mar-202II start Time 14:00 14:00 14:00 Each hole should be pre-soaked twice before the test is carried out. Step 3: Measuring T100 1 2 3 Percolation Test Hole No. Date of test 29 -Mar -26 29 -Mar -26 29 -Mar -2026 Time filled to 400 mm Time water level at 300 mm 0.00 0.00 0.00 Timetodrop100mm100) Average o.00 Ti., If T100 > 480 minutes then Surface Percolation value >90 - site unsuitable for discharge to ground If T100 < 210 minutes then go to Step 4; If T10> 210 minutes then go to Step 5; Step 4: Standard Method (where T,00 210 minutes) Percolation Test Hole 1 2 3 Fill no. Start Finish AT (min) Start Finish AT (min) Start Finish AT (min) Time Time Time Time Time Time (at 300 (at 200 mm) mm) (at 300 (at 200 mm) mm) (at 300 (at 200 mm) mm) 1 II I 0.00 1II I 0.00 I l 0.00 2 o.oj I fl I 0.001 I It iP 0.001 3 Average AT II II 0.001 I II iI 0.001I IF 0.00 0.00 0.00 0.00 Value Average AT/4 = [Hole No.1] 0.001(T) Average AT/4 = [Hole No.2] 0.001(T) Average AT/4 = [Hole No.3] I 0.001(T Result of Test: Surface Percolation Value = 0.00 (min/25 mm) Comments: 'he "P" Tests carried out are within the acceptable range as per the EPA CODE OF PRACTICE Step 5: Modified Method (where T100 > 210 minutes) Percolation Test Hole No. 1 Fall of water in hole (mm) Time Factor = T, Start Time hh:mm Finish Time hh:mm Time of fall (mins) =Tm K, = Tf / T,,, T — Value = 4.45 /K„ 300-250 I 8.1 =� 0.0011 � 250-200 9.7 0� 0.00 �= 200-150 � 11.9 0� 0.00 � 150 - 100 14.1 00 0.00 �� Average T- Value T- Value Hole 1 = (T1) 0.00 Percolation Test Hole No. 3 Percolation Test Hole No. 2 Fall of water in hole (mm) Time Factor = T, Start Time hh:mm Finish Time hh:mm Time of fall (miss) =T K,s = T, / T,,, T — Value = 4.45 /Ks 300 - 250 8.1 0 0.00 � 250 - 200 9.7 0� 0.00 �= 200-150 11.9 �0 0.00 =I 150-100 14.1 �0 0.00 [� Average T- Value T- Value Hole 2 = (TZ ) I 0.001 Result of Test: Surface Percolation Value = 0.00 (min/25 mm) Fall of water Time Start Finish Time K,, T - Comments: in hole (mm) Factor Time Time of fall = T, Value = T, hh:mm hh:mm (mins) / T, = 4.45 =T,,, 1K,, 300 -250 I 8.1 0.0011 I 250 - 200 9.7 =� 0.00 _� 200- 150 11.9 =� 0.00 �� 150-100 1 I____ 14.1 =0 0.00 Average T- Value T- Value Hole 3 = (T2) I0.00 Integrate the information from the desk study and on -site assessment (i.e. visual assessment, trial hole and percolation tests) above and conclude the type of system(s) that is (are) appropriate. This information is also used to choose the optimum final disposal route of the treated wastewater. Slope of proposed infiltration / treatment area: 1/200 Are all minimum separation distances met? I ✓ Depth of unsaturated soil and/or subsoil beneath invert of gravel 0.90 (or drip tubing in the case of drip dispersal system) Percolation test result: Surface: Sub -surface: 52.19 Not Suitable for Development II Suitable for Development V Identify all suitable options 1. Septic tank system (septic tank and No percolation area) (Chapter 7) 2. Secondary Treatment System (Chapters 8 and 9) and soil polishing filter Yes (Section 10.1) 3. Tertiary Treatment System and Infiltration / Yes treatment area (Section 10.2) Discharge Route' Discharge to Groundwater Propose to install: Secondary Treatment System and soil polishing filter and discharge to: Ground Water Invert level of the trench/bed gravel or drip tubing (m) 0.80 Site Specific Conditions (e.g. special works, site improvement works testing etc. TRICEL NOVA UNIT OR SIMILAR UNIT TO CONFORM TO EN12566-3 AND COMPLY WITH SR66 INVERT OF GRAVEL IN PERCOLATION TRENCH TO BE AT 800mm BELOW EXISTING GROUND LEVEL PERCOLATION TRENCH LENGTH OF 95LM REQUIRED NO PIPE RUN TO BE LONGER THAN 10M REFER TO SITE LAYOUT FOR POSITION & DETAILS OF WWTS & PERCOLATION AREA ALL SEPARATION DISTANCES IN ACCORDANCE WITH EPA CODE OF PRACTICE ' A discharge of sewage effluent to "waters" (definition includes any or any part of any river, stream, lake, canal, reservoir, aquifer, pond, watercourse or other inland waters, whether natural or artificial) will require a licence under the Water Pollution Acts 1977-90. Refer to Section 2.4. SYSTEM TYPE: Septic Tank Systems (Chapter 7) Tank Capacity (m3) Lillillil Percolation Area No. of Trenches Length of Trenches (m) Invert Level (m) C________ Mounded Percolation Area No. of Trenches Length of Trenches (m) Invert Level (m) SYSTEM TYPE: Secondary Treatment System (Chapters 8 and 9) and polishing filter (Section 10.1) Secondary Treatment Systems receiving septic tank effluent (Chapter 8) Media Type Area (m2)* Depth of Filter Invert Level Sand/Soil Soil Constructed Wetland Other Polishing Filter*: (Section 10.1) Surface Area (m2)* Option 1 - Direct Discharge Surface area (m2) Option 2 - Pumped Discharge Surface area (m2) Packaged Secondary Treatment Systems receiving raw wastewater (Chapter 9) Type I TRICEL NOVA I Capacity PE 6 Sizing of Primary Compartment 4.0j m3 Option 3 - Gravity Discharge Trench length (m) Option 4 - Low Pressure Pipe Distribution Trench length (m) Option 5 - Drip Dispersal Surface area (m2) 95.00 SYSTEM TYPE: Tertiary Treatment System and infiltration / treatment area (Section 10.2) Identify purpose of tertiary Provide performance information Provide design information treatment demonstrating system will provide required treatment levels DISCHARGE ROUTE: Groundwater Hydraulic Loading Rate * (I/m2.d) L 25.00 Surface Water ** Discharge Rate (m3/hr) * Hydraulic loading rate is determined by the percolation rate of subsoil ** Water Pollution Act discharge licence required Surface area (m2) QUALITY ASSURANCE: Installation & Commissioning Installation to be carried out according to EPA guidelines and planning authority requirements. Commissioning to be carried out by suitably qualified person i.e.. Engineer, Architect, etc; who possess sufficient indemnity insurance On -going Maintenance Maintenance contract to be entered into between WWTS Manufacturer and Client Company: BER SERVICES ENERGY CONSULTANTS LTD Prefix: Mr First Name: Micheal Surname: Murtagh Address: 4nnavackey, Hackballscross, Dundalk, Co. Louth Qualifications/Experience: BEng, MIEI, CEng, FAS Site Suitability Assessment course certified Date of Report: 01 -May -2026 Phone: 087 7570725 E-mail info@berservices.ie Indemnity Insurance Number: AP10003737 Signature: NOTE: To secure your work prior to forwarding to third parties please select Print, select Printer "print to PDF" and name and save document. Martin Burns, Corlea, CMX, Co. Monaghan. TRIAL HOLE M: +353 87 7570725 E: info@berservices.ie W: www.berservices.ie f <,i •+;PL� -x.crr ?tta i fYtf'ii• r 1'f I���