HomeMy WebLinkAbout2662 - Other AssessmentsTricel Site Recommendation Report
Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area)
Date
Report No:
Client Name
Site Location & Townland
01/05/2026
TSA MN 19552
Martin Burns
Corlea, CMX, Monaghan
TRICEL
07 JUL 2026
Thank you for choosing Tricel for your wastewater treatment requirements, 1is report contains the
information for your site and is based on a population of 5 and a subsurface/sFr ce v u� e -o tietwee
Based on the information provided to us and using SR66 and the EPA Code of Practice: Wastewater Treatment
and Disposal Systems Serving Single Houses (p.e. ≤ 10), the appropriate solution for treating wastewater on your
site is a Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area).
Typical layout of a Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation
Area): PLANNING DES"?A1 TiUiEk`1
FEF.NCB.
Pr
°26/62
N t
''4 3luq[Mnt«
'rleei vivo �Yx��sla
li Sl,0r
P :1�?"tYa 4 CO. COUNCIL
IL
Note:
In the above named site, a substitute wastewater treatment system may not be put in place of the following
recommendation.
This recommendation only applies to the above named site based on the information supplied to Tricel.
A Site Characterisation Form should accompany this report. Tricel cannot be responsible for misinformation due
to misleading information being received by us from clients.
Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421, Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel,ie
Page: 1
Tricel Site Recommendation Report
Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area) TICEM..
Section 1: Information on the Novo Package Plant
• Manufacturers report and sizing of the Tricel Novo Package Plant.
• Drawings of the Novo Package Plant.
• Pump selection and technical data
• Certification of the selected Novo Package Plant.
• Brochure on the Novo Package Plant.
• Optional Novo maintenance agreement.
For your site, we recommend a Novo IRL6+ wastewater treatment plant which is designed to treat a maximum of
900 litres of wastewater per day. The Tricel Novo range of wastewater treatment plants is fully in conformance
with EN12566-3 and complies with SR66.
The Novo IRL6+ has a capacity of 4000 litres, of which 2400 are in the primary chamber, this ensures a long
desludging interval.
This solution contains a Tricel 75 pump based on an the Length of Rising Main 20 metres and Difference in
Height of Rising Main 3 metres. A 38mm compression is supplied for connection to a rising main of 38mm
internal bore pipework. Details and pump specifications are contained in Section 1.
Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie
Page: 2
Tricel Site Recommendation Report
Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area) T;ZICEL
Section 1
Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie
Page: 3
Tricel Site Recommendation Report
Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area) TRICEL
PUMP
Liquid
Type of liquid
Clean and dirty water
Max [°C]
50°
Handled
Max solids size [mm)
35 spherical
Maximum immersion [m]
2 (with power cable length S m)
7 (with power cable length 10 m)
Construction
Impeller
Open vortex type
Shaft seal type
Double mechanical seal
Bearing
Sealed ball bearing
Pipe
Suction -Flange [mm]
Discharge -Flange [inch]
35 open
G1% UNI ISO 228
Casing
AISI 304
Impeller
AISI 304
Casing cover
AISI 304
Material
Shaft seal
Pump side: SiC/SiC/NBR
Motor side: Carbon/Ceramic/NBR
Seal cover
AISI 304
Shaft
AISI 303 (Wet extension)
Lubricating liquid
White mineral oil: Esso Marcol 152 (180 cc)
Applicable standard of test
ISO 9906 Annex A
MOTOR
Type
Submersible dry type
Single Phase
No. of Poles
2
Rotation speed
min-'
2875
Insulation Class
F
Protection degree
Ii' X8
kW/HP Rating
kW
[HP]
0.55 ;-0.75
0.75 + 1
Frequency
Hz
50
230 ± 10%
Voltage lvi
Capacitor
Built in
Over load protection
Built in
Float Switch
Optional
Float Switch Cable
Material
Size
H07RN-F
3G1
Power cable
length
material
size
(m]
5 (only for internal usage); 10
H07RN-F
3G1
Dimensions of cable entry
Cable Gland
Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie
Page: 4
Tricel Site Recommendation Report
Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area) TRICEL
Pump Type
I Power I
Capacity
JKWJ
JHPJ
I/min
0
40
80
120
160
200
240
300
aria
0
2.4
4,8
7.2
9.6
12
14.4
18
H =Total manometric head In meters
Trice175 0,55 0.75 8.8 7.6 6.8 I 4.7 3.4 2 0
Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie
Page: 5
This comment replaces neither the declaration
of performance nor the CE marking
•
� �
��,Y.t
i' ,
dd44��
DiULLtlw•
wpa. k
fi' U-3
q to
,•17
D D.1711 01 0J
DP) .
No t''na
W
1$0 D "20W
150 X(1.2 ?e
Tricel Site Recommendation Report
Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area) TIRICEL
Certificate in accordance with SR66 for EN12566-Part 3
1fIiistltut fur
Abwassertechmk
GmbH
TREATMENT PERFORMANCE RESULTS
Tricel (Killarney)
Ballyspillane Industrial Est., Killarney, Co. Kerry, Ireland
EN 12566.3
Results corresponding to EN 12566-3 and S.R. 66
PIA -SR 66-1512-1062
Novo
Submerged fixed film
Nominal organic daily load
Nominal hydraulic daily load
Material
Watertightness
Structural behaviour (Calculation)
Durability
Trealrnenl efficiency (nominal sequences)
COD
91.6%
52 mg/I
BOD;,
95.9%
11 mgli
NH4-N
79.9 %
8 mg/I
SS
95.3 %
16 mg/I
Number of desludging Not more than once
Electrical consumption I 1 kWh/d
0.26 kg/d
0.90 m'/d
Glass reinforced plastic
Pass
Pass (also wet conditions)
Pass
Efficiency Effluent
Parfermance tested by
PIA — Pri finstitut fiir Abwassertechnik GmbH
(PIA GmbH)
Hergenrather Weg 30
52074 Aachen, Germany
,1v� pbwassp��ee
� 3
- teate'i ' �c
Elmer Carla~ Juiy 2056
Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie
Page: 6
► th,40'tini341 415'WI * ► r61n VAVr{'I.,t it tos.5'01.0.. 67t'.Yh*WP2Bh! ► i3-"4'o4,4.4(.tgie•,tt'lrt 04110lt+rI0
.30'04(5t1H, 646's, 5t4.10 a.1 %47 i7o Is.-, 5'to ln,fnt-x v's, s'fog 1.00'605,l' #0 Jean:n-51a•45m1
'l'4 '1-' (".1"A: -'I5 nl'''', 407.1 0-1,k; 'l',1Jblt
Tricel Site Recommendation Report
Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area) TAICEL
NOVO BROCHURE
Homeowners: individual domestic installation
7 1
► 51 Vf•,!,, 1, '9•, J'0 gfpc+n; n•!r. ► kb nrs.tli,p .119.7:ur3 aril Loo5,11•. ► V 13,1',:,6 .545 i,r,+At,f 'JoO3-W5NIr0
f„. . u•r5lh del'.:, 5• st.,th•yl n'.,'. v'J''h yor F..'.,e'
Larger projects: Commercial installations up to SOPE
if I v` 4a6wu
Technical characteristics/ Plant dimensions
I. M 111 vem
t; j 95 t.fi 226 150 776 ? 1173 j 13 ; 053 , AL
r•6 74 964 974 110 740 5.174 5.1 05,H 60
2•-0 24 164 724 ItO I 100 1576 11 PS}} 4*4
S-10 31 164 724 ISO I S+0 1975 } 53 0513 67
417 36 166 177 110 4.00 5375 } I3 , PISS 100
bI0 4.6 L6G _ 227 510 SO0 LA 75 L3 0534 330
126 1 6.6 lid 227 ISO 700 137 12 0.16 2041
7r4A 10.10 2.6 166 t." 333 Yh7 533 13 046
Ia14! 4,3, 146 227 550 fu0 135 L3 16 156.04
74111A ' 12.36 A6 166 9994 55,0 6141 155 I1 0+6
7169 44 IG4 717 539 ( 700 4.33 II ass }93.90
1169 t4-47 54 164 711 157 5.05 533 I3 416
3M0i 04 164 771 150 609 133 13 036 20917
•m'• 10-39 6 (64 2.77 ISO 70(ILSS 15 0.46
56044. 66 564 727 ISO ����....---------700 135 11 016 201.120409
8 � 1"lirirl\ ;
r w1f
IO2 It J iiiiTiiiflti1'
► "V'Rytevem" ► Npw 0dat11111 ► fiwY37lSO WYEI
$34.04 r;•n_:I"�••:: :8•. 1, '51.' 1.600:1 1.1' I1•n1v-1 Jnit 3.1IG &lo• $ 9.•dk hu tJ•n..;,,• ,._ ,�.,
p'm'ptng lMA rANa4 1153)17553 1177 OI5' 1p t', SOpenpt•
Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie
Page: 7
Trice} Site Recommendation Report
Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area) TPICEL
Trice i Novo: Wastewater Treatment System
Service Agreement
Establishing a regime of vearty Inspections and maintenance is advised to ensure that your Tricel flovo
continues to perform to the same high standards throughout its lifetime. The service agreement covers
travel, the service and the iabour cost of servicing only Other labour costs are excluded, as are all
replacement parts.
Trice) (Killarney} Unlimited Company, Ballyspillane Industrial Estate, Killarney, Co.. Kerry, V93 X253,
Ireland 4 the ComAanv'► enter this Tricel Novo service agreement with the Customer named below.
Customer Details:
Name:
Address:
Address of She:
(H other)
Telephone No.:
Date of Tiicef Novo Order:
Work Order NO.,.
Date of Delivery of Trkel Novo:
Date of System Commissioning:
Service Agreement Fee Paid:
Date of Service Agreement Cornmericement:
Unit Serial Eiji.:
During routine rn-tiring, the senfce technician wi l perfolin a series of checks and ptwcedtrres:
C1 ticks:
+ The air -diffuser is monitored to check for sufficient dispersion of air.
• The sludge return system is functioning correctly,
• The covers and locks are In place and In good condition.
• General appearance and condition of the treatment system is good.
Procedures:
• The blower is tested.
• The blower filter is replaced.
• The system a&arm is tested.
• The pump and float -switch are tested (H applicable).
• The vents are cleared of any blockages.
• The sludge level in the primary chamber is measured
Notes:
• Full inspection tabour is covered (including any immediate minor system adjustment required),
This service agreement does not cover the cost of any labour or materials that may arise as a
result of this inspection.
• Components that rewire replacing will incur addltio3tal charges.
• All service eereements exclude de-sludelne,
Tri:el (E5Iirneyl Uldnited Compscry rrading is Td ttl.
Mirth io%7
Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie
Page: 8
Tricel Site Recommendation Report
Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area) T�ICEL
Section 2: Information on the disposal route
The proposed solution for disposal is percolation trenches which consists of a series of pipework which
distributes the effluent for treatment using in situ subsoil.
Based on a Population of 5 and a percolation value of 51-75 on the site, the chosen polishing filter for this site is
percolation trenches, The minimum amount of pipe required will be 95m. This is based on trench length required
per person for the given percolation value as stated in table 10.1 of the EPA Code of Practice 2021.
It recommends that each percolation trench should be equal in length and no longer than 1 Om
Please see attached the accompanying documents in Section 2 for the Percolation area
• Percolation area separation distances
• Construction Requirements
The location and construction of the percolation area is the responsibility of the site engineer. A full site layout
drawing should accompany this report.
The EPA CoP 2021 outlines the design, siting and construction requirements for percolation areas.
The tables below outline some of the key factors to take into consideration when designing and locating a
polishing filter.
Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie
Page: 9
Tricel Site Recommendation Report
Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area)
T 1. •.L 17.mrnam wparauc- detlanm lo- ii-, er: re 0Y7htVI$
Pil-lil.^ernup Y,4k 1LpplY abilrat tern pni•dtAvelh
D•.en 0,3,: tnl ;s 1's 10
Drrgh of S",lS0Ibtnd
duravili 6rll p.,J,iD! S4ND•
:. 20,1 beleen (.veil
o• G BANE4
level an3 bedrock, rrd
d*:rr.lattd
wihs• 1 lilt t 17. I1 n
r- rk'iail
Depth 01 sovViD o 2 0-
A O n bet.+cen iiWril Irml
and Ir iteoc, aw watw
Ole > 2.D m
Oeplh 41 w li%u sell
> ts0 T belswel melt
rvrI and bedrock• .,ti
who' laid e>2.Dm
to c PV a 3:
Orpa1 ul s rt&,bnur 1.2-
lUsaalil S ;t-
a 0 r, lact.teen invert O -.el
or SAND. or
and bedrvck
ully GRAM
e•toled
Uepth bl so brut son
miteia0
mat
B O •n oeftwern nrert
;i.,el aryl he'duk
33 c PV s 120
Drplh of 501huioo,d 1.2..
llrraaly 9U!
30v. between inolt reel
CLAY. Cr CLAY-
and bedreck
darnivlird
matt' fall
Oeptlr of subWlull
z 30 m bet tren irveit
ti",rl and brdrotk
ALnrapioi• AUJr. itr. en I
Up-p•ed?nt d.riess; ml'
K,ntl '1.0 lra,
I akt• 0• lorry,OT
Wiiercovrc,Atrear.i
Oran dran or oaicaoe dtdi
Adp:etd Ir lk plw,t ar14 (w(alauol Wren, pullhri0 Niel U
Irlltra0o' a'ea
Or -01.3 d.tellrr4 huale
NooIdieunrq d,Atlbnp house
Gp
to
40
30
d5
30
411
30
75
Ii
IS
50
10
10
10
7 {tank plantl
25 IW'ei. dater
SaIl ci consttiwltd
wt' .or It
• 10 Witr,Uoni
• brat wnl 00w)
Siatitr lratrr 10 aa/
7 CHd A
MJgi® 030,dc+catt 4
11.00 3
SRr IrOLrutaty 3
F1r1l,ny, Ireurn, 1iN0.KAt !.PA Sit- -we
F',r, per{ala:Uri eYUe
II. 1na1 an:p tot or iarr w-lirr haimxle stax1Li Lit- uu_11td (tuts,! rut ,l d 1t,z
Ir'i:raiiudunavrra ar; x it thtwkl attu be .routed that tilt di;taute. it ni.drlafue0 Ilwr,
regtbe-r,rg stony, wale' dltpolal a'eas Of scal;aitaYs.
Trot, raids rot, lead 10 PI P. deor4opm0, tie canopy spread mticalol pU:0131 tool
ccvear�
r The diital'cei rrtg,irrd dept, -0 on llr nnaalentc of for IwUce 3hcrrtolL adac,
h0i10 be W.Lg I ,lni lIt' IUChl aulhutity and1w Irie' the the Dtpnluneni ii! f+au1E,g,
Leta'• Gwommerl an3 Ventage spec,0caty da h1a:,trwY Monurents So 000 0331 the
hb>ti0'inl perks 1110 W!d fe SFrVI.e
Table 6.2 EPA CoP 2021: Minimum separation distances
TI�ICEL
Tricel (Killarney) Unlimited Company trading as Trice(, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie
Page: 10
Tricel Site Recommendation Report.
Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area) TRICEL
Table 10.1: Infiltration/treatment area and trench length design for tertiary treatment, per PE
Area
Trench I
Trench length
Area
Area
required per
length
required per
required
required
person (m2)
required per
person (m)
per person
per person
person (m)
(m2)
(m2)
3 ≤ PV ≤ 20 ≥7.5
≥6
≥6
≥5
≥3.75
21 < PV < 40 ≥15
≥12
≥12
≥14
≥7.5
41 < PV ≤ 50 ≥30
≥17
≥17
≥16
≥15
51 < PV ≤ 75 ≥50
≥19
≥19
≥22
≥25
76 < PV ≤ 90 -
-
≥28
≥34
-
91 < PV s 120 -
-
-
≥54
-
Table 10.1 from EPA CoP 2021 - Loading rates for the soil polishing filter
Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie
Page: 11
Tricel Site Recommendation Report
Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area) TFRICEL
Table 7.3: Requirements of a percolation trench !gravity fed)
Slope of pipe from tank to 1 in 40 for earthenware or concrete,
distribution device 1 in 60 for uPVc
Slope of percolation trench from
1 in ?00
distribution device
Length of percolation pipe in each
18 rn maximum
trench
Minimum separation distance
12 m (2,5 rn centre to centre)
between percolation trenches
Diameter of pipe from septic tank
100-110 mm
to distribution device
Perco'ation pipes,
100 mm bore, perforated (typically at 4, 6 and
8 o'clock) smooth wall PVC drainage pipes with
perforations of 8 mm diameter at about 75 mm
centres along the pipe or pipes with similar
hydraulic properties,
Maximum of six pipes per distribution device
Width of percolation trench
500 mrni
Depth of percolation trench
Ideally, about 850mm° below ground surface
depending on site (as per Figures 7.1 and 7,3)
Depth of unsaturated sail and/or
Minimum 1.2 m for GWPRs of R1 or R2°. Minimum
subsoil beneath percolation trench
20 rn for GWPRs of R2', R2', R2', R3' or R3'
and above the bedrock and the
water table
Backfilling of percolation trench
300 mm of 12-32 mm washed grave or broken
(see Figure 7.1)
stone aggregate on invert; pipe laid at a 1 in 7.00
slope surrounded by 12-32 mm dean washed
gravel or broken stone aggregate and with 150
mm of similar aggregate over pipe, geotextile layer
followed by topsoil to ground surface
Geotextile
Geotextile should be in accordance with EN 15O
10319
Access/inspection points and vents
These are recommended for the ends of the
percolation pipes. The covers should be visible and
installed to prevent entry of water. They may also
be used for rodding or scouring purposes
a Before installation the holes in the percolation pipe should be inspected to check that
they are the correct size and free from debris.
b The percolation pipes may be located at a shallower depth, provided that a minimum
of 450 mm of material is placed above the pipes to provide the required protection
against damage from above.
Table 7.3 EPA CoP 2021: Construction of percolation trenches. For secondary treated waste water, the maximum
length of percolation pipe in each trench should be 10m as outlined in section 10.1.1 option 3
Terms and conditions:
Tricel cannot accept responsibility for incorrect site details or calculations as these are based on user inputs
which are outside of Tricel control.
Full terms of website use are available at www.tricelsiteassessor,je,/j'er,-nsofWebsjteUse
***Domestic WwTP catering for over 10 Population Equivalent that are discharging to TERO Tertiary
'l'reatment modules may require a pump station
Trice! (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie
Page: 12
Tricel Site Recommendation Report
Tricel Novo Package Plant and Pumped Soil Polishing filter (Percolation Area) TRICEL
TIIOIl IRIAR[YI ULMOD @N1(116[INCS M 1®11 10 0441U TK IM(F[ATM11101021 fl[A11DTF[ATFN
Li Li LiLJ 1J
+ -
I
1 1 10 I�I�
0 I
flPT
8 2,4
14u_
acgir bP'o.t on yr lr] IShM Sw
TERO One Module I6PE) 106555 1 'MS
own 3w.. 0[NNI0t Yo 1401
1Qw YC YufJ 10 b) rsq llpl FG 0101) 110 00011
11.11101 P0 110 P1 P119llP1. CO
11114)1 0(100 1H5 <m)eM11ft WVtTI>4110 t1*1 1TAT1D 01YSi1[8
Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel:
+353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie
Page: 13
Tested in accordance with the EPA 2021 Code NOTE:- ALL LEVELS INDICATED ARE APPROXIMATE (IE.t 200mm
of Practice "Domestic Waste Water Treatment 4- 100.00 Existing Spot Levels
and Disposal Systems serving single houses' ♦ 900.00 Proposed Spot Levels
p y g
Percolation Legend:
1- Mechanical DWWTS
2- Percolation Area - trench layout
(95m -100m Min.)
3-5 T -test hole 1,2,3
6- Trial Hole
NORTH
w e
S
OWWTS And Percolation Area
To Comply in Full With E.P.A. 2O21
NEW BOUNDARY FENCING
Water supply from New bored well
TO SITE BACKPLANTED WITH
A NATIVE HEDGEROW & TREES 109.0
108.0 .108.49
•109.33
107.0
Raised .107.45
Percolation Area � \ � 1
X IL of trenches 100.00 N \.1°8.03 \
I.L. of pipes 10030 106 . 0
.100-58 95m -100m Min of piping 306.06 \
105.0 \ \ 10B.71\101.0 102.0 N. •106.62
.105.09 �
\.102.25 103.0
104.0 A N.
.107.22
\ \ .103.35 .104.25 \ \
100.0 00.06 ' \ .105.48 \
\101
\ 5.88 \ 1 B.oe
99.0 ' .1o3n \
r\ % 0302.42 9 \ 107.054.6
07.05
\ ) 108.0
98.0 � ` :oi i3 � .105\,1 0
\ \ y
S 106.47/
\ �Ql
^ ' �T � // 105.37 �
�<. ,._0-�r .I03.12 eW �.• Oi
\ \0v J2R 'r�11e
<,
°Ayo�m
9aP r Dwelling I
F.L 102.18 1 4
o C.5 v`j 1°1.5.50
99.93 \ 102.56
10'.93 .10 .
34. .102.15 a K
> p r 1p
_....._._ - 102.5. _ 03.31
•\
36m
\Site Outlined In Red
�, Site Area = 0.265 Ha.
N,
W AiERCs-
SITE LAYOUT MAP
Scale 1/500
at Corlea, Carrickmacross Co. Monaghan
O.s. Sheet No. 1695
0
TP
100.84
}
J
z
0
_
102.40
0
z
0
u
J
101.44
a.
Q
Gate
z
rI X
2
J
a.
w
Direction of Ground
water flow
z
Q
of
I
WI
I
In
w
Planning Dwgs
NOEL M c I A H O N ■ ■ Architectural Design & Planning Services ■ ■
ESSEXFORD, DUNDALK, Co. LOUTH Project Name:- Alterations and extensions I Drwg. Name —
to an existing deriUct dwelting house Site Layout Map
MOBILE 087-2359206 at Corlea, Cmx, Co. Monaghan Date- Scale:- j Rev -
E -MAIL noelmcg123®gmaiLcom For Martin & Siobhan Burns 113-05-26 1/500
m
L/ 11D X
- • 0_i1 O
--I
O V
V \ O
UJ
O -H r m
O -1 < m
p m In
fD
O
x O
O
0\
I
x I
m
3
N
r
r*I
T
m
0
0
0
o,
r)
w
C
3
n
w
N
D
®
C)
O�
rT•
(�
u�
B.
n
I
0
0
CD
i
O
n aJ
0 n
..
Qo rn rev
rn x a D'
D
0 �- -
n
a - T- d0
C-
-
0 o
fD
0 a
f° w
C/) = = =
rn a
QJ
ID
o x
r= =
o
�.
In
C')
90
co
o
W rp
O 'i
t0
cn
aJ
rn
rD
i
fD
=.
l0
N
W rD
ID
i
Co
90
o
n
rD
�
ry
<
rp
i
y
.
S
O O
•O .O
O O
O O
N.
'0 '0OO O O O O
o in 0 in .O • in :o
O .O O 'O .O 'O .O
= X I T
CD
n
Z Z rD
o M
D M
= o
m C
o9
D
20
rD O
II rn
O
ro n r
- rrD
O O
rn
0 O _
O O p m
p D
o O
C
O O
O
O
O O n o
O _ rat
O o
U1 0 O
(n
O O
U1 W
O -i`
1O1 O
O
O O
N
i„
O
C
m
o
x
O
z
❑
n
r
m
I-
(A
<
m
r
CA
\D
W
O
O
"D
J
Ui
O
O
O
0
O
O
N
U-1,
O
O
Ln
I O
O
O
J
Ln
O
O
o
O
"D
CD
0
0
CA
I-,-)
0
Gl
CD
c
o
r
rn
r
r
Ul
O
O
O
O
ID
a
a
ID
ID
Q
O
3
ID
In
m
Z
91
In
m
Z
Z_
Z
Gl
O
Z
Z
In
O
D
m
D
O
m
n
0
-4
Z
O
T
I-
I-.
in
0
z
-i
0
V)
II
z
0
P1
A
m
Ph
00
O O D
ob
00
0
x
Ph
>
ti - i
o m•
ID 0
a L Z
o
o i+
N
ID rp 0
0
ID f/1 3
rn 3