Loading...
HomeMy WebLinkAbout2560386 - Final Grant 14/07/2026 To: Cavan & Monaghan Education Training Board Kieran O'Reilly Monaghan Road Castleblayney Co. Monaghan A75 EP84 File Number - 25/60386 Planning and Development Act 2000 (as amended) NOTIFICATION OF FINAL GRANT Monaghan County Council has by order dated 10/06/2026 granted the above named, for the development of land namely for:- permission to extend existing GAA pitch to include excavation of in-earth material and re-use of same on site to remodel playing pitch, new goal posts, new enclosed ball wall playing area, new generator room, new ball stopping nets, new cowled floodlighting, a new retaining wall and demolition of old ticket box building together with all ancillary and associated site works , at Connabury/Onomy, Castleblayney, Co. Monaghan, subject to the 6 condition(s) set out in the Schedule attached. Signed on behalf of MONAGHAN COUNTY COUNCIL. pp__________________________ ADMINISTRATIVE OFFICER __________________________ DATE I refer you to the Health and Safety Authority website www.hsa.ie for new responsibilities for homeowners under Safety, Health and Welfare at Work (Construction) Regulations 2013. 14/07/2026 25/60386 Cavan & Monaghan Education Training Board, Connabury/Onomy, Castleblayney, Co. Monaghan 1. During the construction phase, the developer shall ensure that all public roads and footpaths adjacent to the site are kept free from mud, debris and other materials associated with the works. Any such material deposited on the public road shall be removed immediately. Reason: In the interest of traffic safety and residential amenity. 2. Ball-stop netting shall be provided behind both goal areas in accordance with the submitted site layout plan and same shall be retained and maintained in good condition. Reason: In the interest of public safety and residential amenity. 3. The proposed floodlighting shall be installed and thereafter operated in accordance with the details submitted, including the lighting report, specifications, and anti-glare measures. All fittings shall be cowled and positioned so as to minimise light spill and glare beyond the site boundaries. All floodlights shall cease to operate between the hours of 22:30 and 08:00. Reason: In the interests of residential amenity and orderly development. 4. (a) All landscaping works, including planting, boundary treatments, and the retention and enhancement of existing hedgerows, shall be carried out in accordance with the submitted landscaping details during the first planting season following completion of the development. (b) Any trees or plants which die, are removed or become seriously damaged or diseased within a period of five years from completion of the development shall be similarly replaced in the next planting season. (c) Existing hedgerows and boundary vegetation along the site perimeter shall be retained and protected during construction, except where removal is necessary to facilitate the development hereby permitted. Any such areas shall be reinstated as part of the landscaping scheme. Reason: In the interest of visual amenity and appropriate design. 5. Surface water drainage shall be provided and maintained in accordance with the submitted drainage details. All surface water shall discharge to the existing drainage network as proposed, and no surface water shall be permitted to discharge onto the public road. Reason: In the interest of appropriate design and to prevent flooding or nuisance. 6. The development shall be carried out strictly in accordance with the plans and documents submitted on the 24/09/2025 as amended on the 19/05/2026, except as may otherwise be required in order to comply with the above conditions. Reason: In the interest of proper planning and sustainable development. BUILDING CONTROL ADVICE NOTE Before Any Building Works Commence - Things you should check! 1. Building Control Legal Requirements - Commencement Notice & Fire Safety Certificates (FSC); In accordance with the Building Regulations you are obliged to submit a Commencement Notice prior to commencement of a development and it must be submitted not less than 14 days and not more than 28 days before you wish to commence. The Commencement Notice must be submitted to the Local Authority via the online national portal BCMS. Applicants are advised to register on this website in advance of submitting a commencement notice via the attached link: www.localgov.ie/en/bcms As the type of Commencement Notice required will vary depending on your proposed development, you are advised to seek advice from your agent or architect on what type of commencement notice is relevant to your proposed works. Alternatively please feel free to contact Monaghan Fire & Building Control Authority for advice at 047-30521 or email: bcms@monaghancoco.ie Please be advised that works can not begin until the applicant has received a valid commencement notice from the Building Control Authority, and that it is an offence under the Building Control Act 1990 to proceed with the works without a valid commencement notice and/or a valid FSC (if required for works/development). 2. Pre-Development Conditions; If there are any Pre-Development conditions on the schedule of conditions attached to your permission you should give your immediate attention to them prior to the commencement of your development. N.B. All conditions must be complied with in full as failure to do so will render your permission invalid and may result in the initiation of enforcement proceedings for compliance with same. 3. Construction Products Regulations (SI No 225 of 2013); You need to ensure that you, your builder, your designer/assigned certifier and your suppliers are familiar with the requirements of the Construction Products Regulations. For more information, please see link provided below. https://monaghan.ie/firebuildingcontrol/building-control-construction-products-regulation/ 4. Responsibilities under the Safety, Health and Welfare at Work (Construction) Regulations 2013; The regulations are to ensure that there is a safe working environment for all involved in the construction works, including dwellings. For more information; http://www.hsa.ie/eng/Publications_and_Forms/Publications/Construction/Guide_for_Homeowners.html