HomeMy WebLinkAbout2560489 - F.I. Received Doc. - Lighting Design ReportLighting Design Report and Speciflcation - 1 -
Lighting Design Report and Specifications for
Doohamlat Castleblaney, County Monaghan
1. General Information
The Safety, Health and Welfare at Work (Construction) Regulations 2013 clearly deflnes
certain duties for Designers and for Project Supervisors, Design Stage. In order to meet
these duties and to assist other designers and supervisors involved in this project to meet
their duties we provide the following information. It must be noted that this information
is based on our observations and there may be other risks that are beyond our knowledge
on this project.
1.1. Client & Project
Project Name Housing Development for 45 Units at Doohamlet
Project Location Doohamlat Castleblaney, Co Monaghan
Client Connolly Partnership
1.2. Design Role
A completed lighting design for the above project to comply with relevant EU Norms,
National Standards, and best guidance documents as appropriate.
European lighting standards I.S. EN 13201-2:2015
I.S. EN 13201-5:2015
I.S. EN 12464-2:2007
Code of practise BS 5489-1: 2020
Professional guidance documents ILP PLG03 (2012)|
Technical Report 12. ILP (2007)|
Guidance Note 01/20. ILP (2020)
Lighting Guide 21. SLL (2021)
Electrical standard I.S. 10101: Latest version
ESBN Requirements National Code of Practice for the Customer Interface.
Lantern standard EN 60598
Column standard EN 40
Column calculation method BD94/07
Steelwork protection EN 1461
Electrical vehicle charging Building Regulations Technical Guidance Document
L 2022
Building Regulations Technical Guidance Document
M 2022 RECEIVED: 20/07/2026
Lighting Design Report and Speciflcation - 2 -
Directive 2014/94/EU 2014
Local authority development plan.
The design has been completed based on the drawings provided.
The design covers the physical area deflned by the calculation grids marked in the lighting
design booklet accompanying this report.
2 Safety
We are committed to safe working practises and have done all in our power to identify
and 'design out' hazards. If there is any detail within this design that requires
clariflcation or if you need further information, please contact us and we will endeavour
to co-operate fully.
2.1 Particular Risks
Using Schedule 1 Non-exhaustive List of Work Involving Particular Risks to the Safety,
Health and Welfare of Persons at Work as a template, we have identifled the following
risks that affect the design process:
None that we could identify.
2.2 Other Risks
In addition to the risks described in 2 Particular Risks above, we have identifled the
following risks that affect the design process:
None that we could identify.
2.3 Construction and Risk Control
It is the contractor's responsibility to ensure that their method of work meets their duty
of care and requirements under the Safety, Health and Welfare at Work (Construction)
Regulations 2013 and any other national or local requirements.
2.4 Electrical Safety Tests
It is the electrical contractor's duty to calculate the appropriate fuse size for the
electrical infrastructure.
It is the contractor's duty to ensure that all his electrical work meets relevant national
and local standards. The contractor must ensure that all electrical safety testing is
completed by a competent member of staff and that all test results are recorded and
signed, and a copy given to the client and to us.
2.5 Lighting Columns as a Hazard RECEIVED: 20/07/2026
Lighting Design Report and Speciflcation - 3 -
Public lighting columns are deflned in BS 5489 -1:2020 6.13 as a potential hazard to road
users and deflnes minimal setbacks to the column face from the edge of the
carriageway.
In general, the edge of the carriageway is deflned by the raised kerb in residential
developments.
In this project we have located the columns at the back of the footpath or set back by at
least 800mm clearance between column face and kerb edge.
3 Lighting Design
Using S.R. CEN/TR 13201-1:2014 Table 4 we have determined that designing the lighting
within the residential area comply with I.S. EN 13201-2:2015 P4 is appropriate for this
project given its size, location, and usage.
3.1 Dimming
We have designed the lighting to dim by 25% from 00:00 to 06:00 in line with dimming
proflle U14.
3.2 Constant Lumen Output
The luminaires shall utilise constant lumen output.
3.3 Switching
The luminaires will be operated by PECUs switching at 35/18 ux levels.
3.4 Lighting Impact
We select the luminaire that uses the lowest energy consumption for the speciflc
application. We utilise the most appropriate lumen package (lumen output and
distribution optics) to ensure efficient lighting of the target area and to minimise light
spill outside of the area. Our energy consumption calculations are based on the
requirements of IS EN 13201-5:2015.
We design using full cut off luminaires to ensure there is no direct upward light. We
ensure that threshold increment is included in our calculations so that the luminaires
are not a glare source.
These measures, along with our general lighting design approach, means that light spill
outside the project boundary is minimised. By using a tailored lumen package, we
minimise refiected, and refracted light as far as practicable.
We believe our lighting designs utilise the most energy efficient, sustainable luminaires
currently available on the market and refiect practises laid out in relevant standards and RECEIVED: 20/07/2026
Lighting Design Report and Speciflcation - 4 -
in guidance notes from the professional bodies of which we are members, the
Institution of Lighting Professionals and the Society of Light and Lighting.
4 Lighting Performance
The lighting design has been carried out based on the performance of the selected
luminaire. Any changes to the selected luminaire will make our design obsolete. This
includes variation of speciflcation of the luminaire by any member of the supply chain,
including the original equipment manufacturer. Once this design has been approved by
the local authority, any changes to the design will also require approval.
4.1 Maintenance Factor
The luminaire manufacturer's stated lumen depreciation factor is 0.9 at 100,000 hours
at 25° C for drive current selected. The lamp survival factor is 1. The mounting height,
environmental zone and cleaning cycle derives a luminaire maintenance factor of 0.92
from table C.1, BS 5489-1:2020. This results in a combined maintenance factor of 0.83
which has been applied to the calculations.
4.2 Correlated Colour Temperature
The light source shall have a correlated colour temperature (CCT) of 4,000 Kelvin.
4.3 Luminaire Selection
We have selected a luminaire based on energy consumption, photometric
performance, and general quality. Ducting must be laid in accordance with the National
Rules for Electrical Installations I.S. 10101: Latest version.
No cable joints are permitted. Cables can share ducts, but they must not be jointed in
any manner.
4.4 Luminaire Variation
While we endeavour to use the smallest number of luminaire variations on our projects,
our primary aim is to comply with relevant European lighting standards while minimising
energy consumption, minimising light pollution and light spill.
We achieve this by selecting an appropriate lumen package to suit the geometry of the
area to be illuminated.
4.5 Design Luminaire
In this instance, we have selected a design based on the stated photometric
performance and energy consumption of the ASD Highway Diamond range, to blend
with existing lighting.
4.6 Existing Lighting RECEIVED: 20/07/2026
Lighting Design Report and Speciflcation - 5 -
The existing columns on the entrance road will require relocating to the back of the
planned footpath. Our calculations show that this will not negatively impact on the
lighting levels.
Please note that if this lighting equipment has been taken in charge, then approval for
the work will be required from the local authority, and elements of the work can only be
undertaken by the council's approved public lighting contractor.
5 Columns
We have used 6m columns throughout the development.
5.1 Trees and Landscaping
Trees and tall growth should be pruned back so that they do not cause shadowing. No
trees or tall shrubs can be planted within 6m of the column.
6 Cable and Ducting
It is not possible to incorporate the blocking and shadowing effect of trees, or other
obstructions into the lighting level calculations.
6.1 Public Lighting Service Pillars
The project will require two service pillars.
Service pillars must be located in places that afford ease of identiflcation and access
for future maintenance crews. They must be located logically so as not to cause any risk
to maintenance crews in the future.
6.2 Public Lighting Circuits
The service pillar MP 1 will supply three circuits, while MP 2 will supply two.
Only 2 core NYCY electrical cable, of the size specifled in the accompanying electrical
calculation shall be used. The earth conducting sheath shall be connected to terminals
using appropriate glanding mechanisms. SWA cable shall not be used.
7 Public Lighting Energy Consumption
The total energy consumption for this project will be 618 kW/h per annum.
8 EV Charging Meter
Two CT three phase meters will be required. The meters will supply multiple three phase
circuits, as shown on the accompanying drawing and electrical schematic. The meters
shall only be used for the EV charging infrastructure. RECEIVED: 20/07/2026
Lighting Design Report and Speciflcation - 6 -
8.1 EV Charging Ducts
The EV charging supply ducts shall have a minimum 250mm internal diameter. Bends
shall be gentle with a minimum radius of 1000mm.
8.2 EV Charging Circuits
Each individual EV charger shall be supplied by a single dedicated circuit. No more than
one charger shall be connected to a circuit.
Each circuit shall be protected by a RCBO Type B, as sized in the accompanying
electrical calculations. The electrician shall determine correct trip time based on
appropriate on- site testing.
Only 4 core NYCY electrical cable, of the size specifled in the accompanying electrical
calculation shall be used. The earth conducting sheath shall be connected to terminals
using appropriate glanding mechanisms. SWA cable shall not be used.
8.3 EV Charging Future Infrastructure
We have designed a ducting layout to permit future potential expansion of charging
points as required by TGD L 2021.
9 EV Charging Management
EV chargers automatically balance electrical loading to ensure maximum charge
current can be delivered to the vehicle. Chargers will also automatically detect if the
vehicle can except single phase or 3 phase charging.
It is necessary therefore that EV chargers communicate with each other via 4G network.
It is good practice to alternate phase loading at the meter by alternating the
connections to the chargers.
9.1 Load Balancing
If there are no other electrical loads supplied from the DSO meter, then a static load
management system is adequate. If additional connections are made to the meter, then
a dynamic load management system will be required. As this installation will have
dedicated meters, static load management will be used.
Reimbursement
The chargers will have RFID readers which will enable the management company to
apply a fee to users of the charging service. This will require setting up via the
management company, or other third party.
Appendix B Luminaire Specification RECEIVED: 20/07/2026
Lighting Design Report and Speciflcation - 7 -
1. Luminaires shall be fully compliant with the Single Light Regulation ~
Commission Regulation (EU) 2019/2020 of 5th December 2019. The luminaire
shall be registered on the EPREL website and labelled in accordance with the
regulation requirements.
2. Luminaires shall be registered on SEAI's Triple E and ACA registers.
3. Luminaires shall be CE marked in line with Directive 2014/35/EU or later. Note
that UK Equivalent Certiflcation is not valid in the Republic of Ireland.
4. Luminaires shall be manufactured in compliance with IEC 62504:2014 +
A1:2018 or later.
5. Luminaires shall be compliant with the following electrical safety standards:
o EN 60598-1:2015 + A1:2018
o EN 60598-2-3:2003 + A1:2011
o EN 6038-1:2017 + A1:2017
o EN 62031:2008 + A2:2015
o IEC 61347-2-13:2014 + A1:2017
6. Luminaires shall be compliant with EN 62471:2008.
7. Luminaires shall be complaint with EN 55015:2013+A1:2015, and with EN
61547:2009 COR 2015.
8. Luminaires shall be compliant with the following performance standards:
o EN 62384:2006 + A1:2009
o EN 62386 101:2014/AMD1:2018
o AAA EN 62386 102:2014/AMD1:2018
o EN 62386 103:2014/AMD1:2018
o EN 62386-207:2018
o EN 62707-1:2013 + A1:2018
o EN 62717:2017 + A2:2019
o EN 62722-2-1:2016
o EN 61643-11:2012 + A11:2018
o IEC 62262:2002
o IEC TR 62696:2011
9. Luminaires shall be manufactured in accordance with the European Directive on
Waste Electrical and Electronic Equipment (WEEE).
10. The luminaire shall be designed speciflcally to be used with LED light sources.
11. The correlated colour temperature (CCT) of the source shall be as described in
Section 4.2 of this design report.
12. The binning of the LED chips shall be within a flve step McAdam ellipse.
13. The luminaire shall be rated to operate at 230V * 10% at 50 Hertz.
14. Power factor correction shall not exceed 0.9 at 100% lumen output, or 0.8 when
dimmed. RECEIVED: 20/07/2026
Lighting Design Report and Speciflcation - 8 -
15. The luminaire shall utilise constant lumen output (CLO), unless the lumen
depreciation factor (LDF) is less than 98% at 100,000 hours operation, in which
case the additional complexity may make CLO obsolete.
16. The luminaire shall be fltted with surge protection in accordance with EN 61643 -
11:2012 + A11:2018 rated 10kA/1010kV. Surge protection shall be the flrst
component encountered in the circuit to ensure protection for all components
within the luminaire.
17. The luminaire, and mounting arrangement, shall be constructed in a robust manner
and suitable for Irish climatic conditions in an ambient temperature of -35°C to
+55°C. The luminaire shall have a minimum impact resistance of IK08.
18. The luminaire body shall be protected against ingress to IP 66.
19. The luminaire shall be protected to a level of 1,000-hour salt fog test as a minimum
in accordance with EN ISO 9227.
20. Except for blanking covers to permit detection, communications, or other such
functionality, the luminaire shall be manufactured from die cast corrosion resistant
marine grade aluminium alloy in accordance with either: EN AC 44100, or EN AC
44200, or EN AC 44300.
21. The luminaire, and mounting arrangement, shall be powder coated in accordance
with relevant industry norms, or EU standard. All externally visible components of
the luminaire shall be of the same colour, except for decorative applications.
22. The light source shall be modular and replaceable on site. The module shall be flxed
in a manner that maximises heat transfer from the chip and board.
23. The light source shall be protected by an appropriate material and shall be
protected against ingress to IP 66 and have a minimum impact resistance to IK08.
24. The original equipment manufacturer (OEM) shall ensure that all components
within the luminaire are compatible in both performance and thermal management
to ensure that lumen depreciation factor (LDF) or any other life prediction
methodology is not shortened or compromised. This shall include any component,
or accessory.
25. The driver shall be DALI registered and capable of two-way communication and
interaction with a control and management system (CMS) or shall be capable of
being controlled by 1 to 10.
26. The driver shall have over temperature protection.
27. The ingress protection rating of the entire luminaire shall be maintained over the
operational life of the product.
28. The luminaire shall be provided by the original equipment manufacturer (OEM)
prewired with a minimum 1.5mm? artic fiex for mounting heights up to 6m, and a
minimum 2.5mm? artic fiex for mounting heights above 6m. The cable shall be
suitable for the application and comply with BS 6004. The cable shall be of
sufficient length to permit an adequate drip loop to be provided on luminaire RECEIVED: 20/07/2026
Lighting Design Report and Speciflcation - 9 -
installation. The cable shall have sufficient cores to allow for the safe electrical
connection, and for data transmission from ground level to the luminaire.
Colour codes of the conductor insulating shall be in accordance with I.S. 10101:2020,
or later.
The requirement for ground level data transfer excludes the following local authorities:
o Wexford County Council.
o Laois County Council.
o South Dublin County Council.
o Dun Laoghaire Rathdown County Council.
o Fingal County Council.
o Dublin City Council.
29. All flxtures, bolts, screws all other mechanical flxtures shall be captive and
constructed from noncorrosive materials.
30. All covers, or openings, required to be opened during installation or maintenance
shall be captive when open.
31. All wiring shall be heat resistant and comply with I.S. EN 60598.
32. Electrical connection terminals shall be indelibly marked to indicate all wiring
connections and use shrouded screws. Control equipment shall bear a clear circuit
diagram to indicate all component connections in a clear and concise manner.
Operating voltages shall be clearly marked within the luminaire enclosure.
33. Electrical terminals shall be capable of terminating three core 2.5mm fiexible
cable.
34. LDF shall not exceed 0.1 at 100,000 operating hours in Irish climatic conditions and
ambient temperatures.
35. Lamp survival factor (LSF) shall be equal to, or less than 1 at 100,000 operating
hours in Irish climatic conditions and ambient temperatures.
36. The temperature that photometric data is measured shall be stated and shall not be
less than 15°C.
37. The weight of the entire luminaire assembly shall not exceed 18kg and shall be
stated.
38. The maximum projected side area (windage) of the luminaire shall not exceed
0.18m? and shall be stated.
39. A comprehensive written warranty shall be provided for the entire luminaire
covering a minimum period of ten years from date of installation. Full details will be
provided in how the local authority can access this warranty if they are taking the
luminaire in charge rather than procuring directly.
Appendix C Column & Bracket Specification RECEIVED: 20/07/2026
Lighting Design Report and Speciflcation - 10 -
The column, column door, bracket and any adaptors shall be designed to comply
with all sections of I.S. EN 40 and in accordance with BD 94/07. The column, bracket
and any adaptors shall be of suitable size to bear the specifled lantern and to
achieve a nominal height to light source as called for by the lighting design.
Columns, column doors, brackets, and any adaptors shall have a fatigue design life of a
minimum 30 years in Irish coastal environment in accordance with I.S. EN 40 -3-3. All
columns, column doors, brackets, and any adaptors shall have a written warranty for
ten years. Written details shall be provided on how a local authority shall access this
warranty where they are not part of the supply chain, such as when taking in charge.
The column, column door, bracket, and any adaptor manufacturer shall be registered
with and certifled by either NSAI, British Standards Institute of Quality Assurance
Services or Lloyds Register Quality Assurance Register for the design, manufacture,
supply and veriflcation of road lighting columns and brackets under their quality
assessment schedule to ISO 9001 latest version.
The quality assurance certiflcation shall relate to the speciflc lighting column material
being proposed. The local authority reserves the right to request proof of certiflcation
from the proposed column manufacturer.
Aluminium columns can be considered for use, especially as they can be more
environmentally
Brackets will be manufactured from the same material as the column.
Columns shall be located to provide sufficient set back from the kerb edge so as not to
present a hazard to road users. Where cycle lanes are present, sufficient set back shall
be provided so as not to endanger cyclists.
On shared surfaces such as Homezones provision shall be made so that columns can
be positioned safely. Often it will fall to the project architect to provide appropriate
space for the column and associated infrastructure, including ducting and section
pillars.
Public lighting columns cannot stand in private property.
The column will comply with the following speciflcations:
1. The column, column door, bracket and/or adaptor shall be of functional design
and suitable for the location and intended loading.
2. The column, column door, bracket and/or adaptor shall be protected against the
ingress of moisture at the top and at the door entry. RECEIVED: 20/07/2026
Lighting Design Report and Speciflcation - 11 -
3. Steel column, column door, bracket and/or adaptor shall be galvanised to BS EN
1461 latest version.
4. Column roots shall be protected with bitumen or other appropriate material. This
protection should extend 100mm above ground level.
Column roots shall have a cable slot at an appropriate depth to allow electrical
cable ingress and egress. The cable slot shall be formed so as to prevent damage
to draw rope or electrical
5. Doors shall be fltted in such a way as to minimise the risk of being pried off. Twin
locks shall be fltted. Column and door should have earth terminals of suitable
mechanical type.
6. A suitable non-hygroscopic backboard will be fltted in line with the door and be
large enough to take local authority approved termination units.
7. The space between the door and the backboard will be sufficient to enable the
fltment of termination units as required by the County Council.
8. Each lantern shall be individually protected with a suitable fuse unit in the
column base.
9. Neutral blocks, or looping-in blocks, shall be of an approved grooved bore 63A type,
fully insulated and solidly mounted on the backboard.
10. Columns shall be wired with a minimum 2.5mm? PVC/PVC stranded copper cable.
11. All columns shall comply with I.S. 10101:2020 and regulations with regard to
minimum door height.
12. Columns shall be installed so that their doors are aligned at 90° to the curb edge to
enable maintenance personnel face towards oncoming traffic.
13. Close protection of street lighting lanterns to be provided by a 25A rated cut -out
loaded with a 6A fuse incorporating a cam lever single pole disconnection. The cut-
out will use a separate neutral and earth. The cut-out must provide ingress protection
to IP21 as deflned by EN 60529. This fuse type is colloquially identifled as conforming
to BS 88.
14. The cut-out shall be constructed to conform to the requirements laid out in BS 7654
for example: MC040SLF 25A SLCO TYPE 1 (SNE) by Lucy Zodion. Note that other cut -
outs that meet this speciflcation will be acceptable so long as they are an
established and recognised, quality brand and do not have a negative impact on
maintenance stock requirements of the local authority or their agents.
15. Where three phase supply is required, then separate link boxes will be installed in the
column below the cut-out to allow for interconnecting. Link boxes must comply with
the requirements laid out in BS 7657:2010. Link boxes will be supplied for live 1, live
2, live 3, neutral and flnally earth. The link box must provide ingress protection to IP21
as deflned by EN 60529.
16. All terminals shall be formed from solid brass and be electroplated for temperature
rise stability. Terminals shall have a serrated bore to ensure good contact with all RECEIVED: 20/07/2026
Lighting Design Report and Speciflcation - 12 -
types of conductors. The incoming terminals shall have additional protection,
provided by a red safety shield to guard against accidental contact with live metal.
17. All components required will be flrmly flxed to the backboard of the column in a tidy
professional manner. All conductors will be stripped to the appropriate length to
allow for connection. No exposed conductors shall be allowed.
18. The column shall be earthed from the incoming cable via a 6mm? PVC cable which
will be connected to the column by a crimped lug.
19. The column shall carry a unique, permanent, and weather resistant identiflcation
label. label shall durably legible. It shall be mounted in the column base and be
visible after electrical flt out has been completed.
The label shall carry the following information:
o The manufacturer.
o Product model.
o Year of manufacture.
o Standard to which the product has been designed and manufactured to comply
with.
20. Where future access by maintenance contractors MEWP is difficult, or require
reversing over signiflcant distances, then hinged columns shall be used.
Appendix D Ducting Specification
1. Ducting shall comply with I.S. EN 61386 -1-22-23-24 and shall be single wall,
coloured red duct shall be 107mm with a minimal wall thickness of 5mm. Each
length of duct shall be stamped with the legend 'Public Lighting' or 'Street Lighting',
in 18mm black lettering repeated at 1000mm intervals. Ducts shall be laid with the
legend facing upwards.
2. The duct shall withstand a 750 Newton load rating for 5% defiection.
3. Ducting shall be laid in fully coupled, unbroken lengths and shall be installed to
achieve the minimum depths of armoured cable required by I.S. 10101 latest version,
and local authority requirements. Typical depths for the cable are 750mm at road
crossings, 450mm under footpaths, and 600mm under grass or other softer
materials.
4. Ducting shall be laid in a straight line, close to the line of columns and shall contain a
continuous, knot free, draw line of minimum 8kN.
5. Ducting shall be laid on a bed of sand and surrounded with sand. After compacting,
the sand bed shall be a minimum of 50mm deep at the bottom of the duct, 25mm at
either side of the duct, and 150mm above the duct.
An electrical hazard warning tape shall be laid on top of the sand along the entire
length of the ducting at approximately 300mm below flnished ground level. The tape
shall be made of plastic, coloured yellow, with the legend 'Caution Electric Cable
Below'. RECEIVED: 20/07/2026
Lighting Design Report and Speciflcation - 13 -
The remainder of the trench shall be backfllled to ground level using material free of
sharp stones, or stones greater in size then 50mm.
Road crossing ducts shall be adequately protected by a cover of lean mix concrete
and at a depth consistent with road construction requirements but shall not be less
than 750mm deep.
6. Duct ends shall be protected from the ingress of rubble or any other material. All
ducts shall be installed so that no undue stress is placed on cables when pulled.
Ducts shall be aligned as straight as possible horizontally and vertically. Sweeps
shall be as gradual as possible.
Where ducts must be cut, it shall be with an appropriate tool, and cuts shall be such
that they do not affect the sealing of joints. The duct shall be completely deburred
before installation.
7. The interior of the duct shall be cleaned with an appropriate brush, in both
directions, following installation.
8. Following installation, and prior to backfllling, the duct shall be tested by drawing a
cylindrical mandrel through. The mandrel shall be 300mm long and have a diameter
than is 10% smaller than the internal diameter of the duct, or 10mm smaller,
whichever is smaller.
9. Immediately after cleaning and testing, each shall be fltted with a continuous draw
rope of 10mm diameter, free of knots, and with a minimum 8kN breaking strength.
A surplus of 2m of draw rope shall be left neatly coiled at each end of the duct. The
ends of the draw rope shall be secured in a manner that prevents accidental
withdrawal of the rope.
The ends of the duct shall then be closed off with purpose made caps or bungs to
prevent ingress of water or foreign material.
10. Flexible duct is not acceptable as a substitute to rigid duct and is only appropriate in
the following instances:
o When linking columns to rigid duct.
o For runs less than 2m in length.
o Where tight turns are required and there is insufficient space for cable access
chambers.
11. Cable access chambers shall be provided at the following locations:
o At the intersection of duct runs.
o At the divergence of duct runs.
o At both sides of road crossings.
o At both ends of ducting under shared surfaces, with a single access chamber in
front of each column.
o At any location where bends are equal to, or greater than 90 degrees.
o At any location where proprietary 'duct bends' cannot be used due to constricted
space. RECEIVED: 20/07/2026
Lighting Design Report and Speciflcation - 14 -
o At either side of any substantial change in installation, at either side of a bridge
for example.
o At substantial changes in height.
12. Prefabricated chambers of plastic, or similar material shall not be used.
13. Public lighting ducting cannot pass under private property.
Appendix E Electrical Cable Specification
All electrical cables shall comply with the requirements of I.S. 10101 latest version, and
with local authority speciflcations.
All cables to be installed in ducting shall be armoured. Cable loading will be derived by
appropriate calculation methods by a competent designer but will have a minimum
conductor size of 0.6mm2.
Cable can be either: 2 core NYCY for single phase and 4 core NYCY for three phases.
SWA cable shall not be used. Cable type and size will be detailed in Appendix A of this
design report.
Electrical cable speciflcations are to be as follows as a minimum:
1. Only armoured cable can be installed underground.
2. NYCY cable to DIN VDE 0276 - 603 (0.6 / 1kV).
3. Glands shall be used in accordance with manufacturer's instruction to provide
an earth with when using NYCY.
4. Cable joints are not permitted.
5. Only one cable incoming, and one cable outgoing shall be used, maximum of
two, shall be installed in a column. This means that a supply circuit cannot
normally be split to provide a spur, except in limited circumstances as designed
by a competent person.
6. The bending radius of the cable shall never be less than the manufacturer's
specifled limit. The minimum bending radius is normally 8 x total diameter of the
cable.
7. Underground cables shall be protected for the entire run by ducting, column
foundation sleeves and cable access chambers. No section of cable shall be in
contact with the soil or ground. RECEIVED: 20/07/2026