HomeMy WebLinkAbout2660216 - Chief Executives OrderMONAGHAN COUNTY COUNCIL
PLANNING AND DEVELOPMENT ACT 2000 (as amended)
Chief Executive's Order No: P739-26
Reference Number: 26/60216
Name of Applicant: Linda McEntee
Address: Pascal Reilly
Mahonstown, Kells, Co. Meath Ireland
Kells
Co. Meath
A82 C981
Nature of Application: Permission for revised house plans from those granted under current
planning permission ref 23/65, together with all associated site
development works on site
Location of Development: Greaghlone
Carrickmacross
Co. Monaghan
ORDER:
I hereby decide, pursuant to the provisions of the Planning and Development Act 2000 (as amended)
and the Planning and Development Regulations 2001 (as amended) to grant permission for the above
development in accordance with documents submitted, subject to the 4 condition(s) set out in the
Schedule attached hereto.
I further decide that PERMISSION be granted subject to the same conditions on the expiration of the
period for the taking of an appeal to An Coimisiun Pleanala against this decision if there is then no
appeal before An Coimisiun Pleanala.
Adrian Hughes
SENIOR PLANNER
Date
26/60216 Linda McEntee, Greaghlone, Carrickmacross, Co. Monaghan
1.
a) The developer shall pay to Monaghan County Council a sum of €2,052.00 in
accordance with the General Development Contribution Scheme 2021-2026, made by
the Council under Section 48 of the Planning and Development Act 2000 (as
amended), towards expenditure incurred or proposed to be incurred by the Council in
the provision of community, recreation and amenity public infrastructure and facilities
in the area.
b) The sum attached to this condition shall be revised from the date of the grant of
planning permission to the value pertaining at the time of payment in accordance with
the Wholesale Price Index for Building and Construction (Materials and Wages).
c) No works shall commence until payment of the development contribution is made in
full, or until Monaghan County Council has agreed in writing to a schedule of phased
payments of the sum.
d) The development contribution as required under condition 1a) above, is in
substitution of Condition 1 required under planning permission 22/269.
Reason: It is considered appropriate that the developer should contribute towards the
expenditure incurred or proposed to be incurred by the Council in the provision of
community, recreation and amenity infrastructure and facilities in the area.
2.
a) The proposed effluent treatment and disposal system shall be located, constructed
and maintained in accordance with the details submitted to the planning authority on
the 1st March 2023 and in accordance with the requirements of the document
entitled The Environmental Protection Agency Code of Practice Domestic Waste Water
Treatment Systems (Population Equivalent <= 10) 2021. No system other than the type
proposed in the application shall be installed without the prior written agreement of
the Planning Authority.
b) A maintenance contract for the effluent treatment and disposal system shall be
entered into from the first date of occupancy of the dwelling and permanently
maintained thereafter. Signed and dated copies of the contract, which shall be for a
minimum period of 3 years, shall be submitted to, and agreed in writing with the
planning authority within 2 months of the installation.
c) Surface water soakaways shall be located such that the drainage from the dwelling
and paved areas of the site shall be diverted away from the location of the polishing
filter.
d) Within two months of the first occupation of the dwelling, the developer shall submit
a report from a suitably qualified person with professional indemnity insurance
certifying that the proposed effluent treatment and disposal system has been installed
and commissioned in accordance with the approved details and is working in a
satisfactory manner and that the polishing filter is constructed in accordance with the
standards set out in the EPA document.
Reason: In the interest of public health and environmental protection.
3.
The development hereby permitted shall be completed before the expiry of the appropriate
period of planning permission reference 23/65.
Reason: To comply with Section 40 Planning and Development Act 2000 (as amended).
4.
The development on the site shall be carried out in accordance with the conditions of
permission reference 23/65, except as required under the aforementioned conditions and as
specified under the plans and documentation submitted to the Planning Authority on the
27/05/2026, or as hereby approved.
Reason: To secure a satisfactory standard of development.
Adrian Hughes
Senior Planner
Date