HomeMy WebLinkAbout2660101 - Chief Executives OrderMONAGHAN COUNTY COUNCIL
PLANNING AND DEVELOPMENT ACT 2000 (as amended)
Chief Executive's Order No: P744-26
Reference Number:
Name of Applicant
Address:
26/60101
Bernard Doherty
Niall Smith
Hall Street
I<ingscourt
Co. Cavan
A82 K8A0
Nature of Application: Planning permission sought for the construction of new single storey
extensions to side & front of existing dwelling, alterations to
elevations and internal layout of existing dwelling, wastewater
treatment system and percolation area, landscaping, boundaries and
all associated site works, Significant further information received
relates to submitted, Soil Characterisation report, Site location map,
site layout plan
Location of Development: Drumlandrick
Castleblayney
Co. Monaghan
ORDER:
I hereby decide, pursuant to the provisions of the Planning and Development Act 2000 (as amended)
and the Planning and Development Regulations 2001 (as amended) to grant permission for the above
development in accordance with documents submitted, subject to the 5 condition(s) set out in the
Schedule attached hereto.
I further decide that PERMISSION be granted subject to the same conditions on the expiration of the
period for the taking of an appeal to An Coimisiun Pleanala against this decision if there is then no
appeal before An Coimisiun Pleanala.
I
Adrian Hughes
SENIOR PLANNER
Z.
Date
26/60101 Bernard Doherty, Drumlandrick, Castleblayney, Co. Monaghan
a) The developer shall pay to Monaghan County Council a sum of €1270 in accordance with the
General Development Contribution Scheme 2021-2026 made by the Council under Section 48 of
the Planning and Development Act 2000 (as amended), towards expenditure incurred or proposed
to be incurred by the Council in the provision of community, recreation and amenity public
infrastructure and facilities in the area.
b) The sum attached to this condition shall be revised from the date of the grant of planning
permission to the value pertaining at the time of payment in accordance with the Wholesale Price
Index for Building and Construction (Materials and Wages).
c) No works shall commence until payment of the development contribution is made in full, or until
Monaghan County Council has agreed in writing to a schedule of phased payments of the sum.
Reason: It is considered appropriate that the developer should contribute towards the expenditure
incurred or proposed to be incurred by the Council in the provision of community, recreation and
amenity infrastructure and facilities in the area.
2.
a) The proposed effluent treatment and disposal system shall be located, constructed and
maintained in accordance with the details submitted and in accordance with the requirements of
the document entitled Environmental Protection Agency Code of Practice - Domestic Wastewater
Treatment Systems (population equivalent ≤ 10), 2021. No system other than the type proposed in
the application shall be installed without the prior written agreement of the Planning Authority.
b) A maintenance contract for the effluent treatment and disposal system shall be entered into from
the first date of occupancy of the remodelled dwelling and permanently maintained thereafter.
Signed and dated copies of the contract, which shall be for a minimum period of three years, shall
be submitted to, and agreed in writing with the Planning Authority within two months of the
installation.
c) Surface water soakaways shall be located such that the drainage from the dwelling and paved
areas of the site shall be diverted away from the location of the polishing filter.
d) Within two months of the first occupation of the remodelled dwelling, the developer shall submit
a report from a suitably qualified person with professional indemnity insurance certifying that the
proposed effluent treatment and disposal system has been installed and commissioned in
accordance with the approved details and is working in a satisfactory manner and that the
polishing filter is constructed in accordance with the standards set out in the EPA document.
Reason: In the interest of public health and environmental protection.
3.
a) Developer shall ensure that adequate measures are in place for the construction phase to ensure
there is no discharge of polluting matter/sediment laden waters to any watercourse or drains.
These measures shall take account of the guidance produced by Inland Fisheries Ireland (IFI).
b) Construction and demolition waste, or excess soil and stone, generated during the construction
phase that cannot be reused on -site shall be suitably disposed/recovered at an appropriately
permitted facility in accordance with the requirements of the Waste Management Act 1996 (as
amended).
Reason: In the interest of environmental protection.
4.
Proposed hedgerow planting shall be in double staggered rows with eight 2-3 year old plants per
metre; 250mm apart, with 300mm between rows. This planting shall be carried out in the first planting
season following commencement of building operations and shall be permanently retained thereafter.
Any plant which fails shall be replaced.
Reason: In the interests of visual amenity and appropriate design.
The development shall be carried out strictly in accordance with the plans and documents submitted
on the 20/03/2026 as amended on the 02/07/2026, except as may otherwise be required in order to
comply with the above conditions.
Reason: In the interest of proper planning and sustainable development.
Adrian Hughes Date
Senior Planner