HomeMy WebLinkAbout2660057 - Final Grant
22/07/2026
To: Magheracloone Mitchells GAA Club
Niall Smith
Hall Street
Kingscourt
Co. Cavan
A82 K8A0
File Number - 26/60057
Planning and Development Act 2000 (as amended)
NOTIFICATION OF FINAL GRANT
Monaghan County Council has by order dated 18/06/2026 granted the above named, for
the development of land namely for:- permission sought by Magheracloone Mitchells GAA
Club to construct a proposed single storey detached Gym Facility building, Retain single
storey extension to front of existing dressing room, existing accessible toilet to side of the
existing dressing room facility building and all associated site works at Lisnakeeny &
Camaghy, Magheracloone, Carrickmacross, Co. Monaghan , at Lisnakeeny & Camaghy,
Magheracloone, Carrickmacross, Co. Monaghan, subject to the 6 condition(s) set out in
the Schedule attached.
Signed on behalf of MONAGHAN COUNTY COUNCIL.
__________________________
ADMINISTRATIVE OFFICER
__________________________
DATE
I refer you to the Health and Safety Authority website www.hsa.ie for new responsibilities
for homeowners under Safety, Health and Welfare at Work (Construction) Regulations
2013.
PP
22/07/2026
26/60057 Magheracloone Mitchells GAA Club, Lisnakeeny & Camaghy, Magheracloone,
Carrickmacross, Co. Monaghan
1.
a) Prior to the commencement of development the applicant shall submit to the Planning Authority,
for agreement in writing, a Construction and Demolition and By-Products Waste Management
Plan, having regard to EPA publication ‘Best Practice Guidelines for the preparation of Resource
and Waste Management Plans for construction and demolition projects’ (2021).
b) The development shall be carried out in accordance with the details agreed under (a) above.
Reason: In the interests of environmental protection and to ensure that the development is carried
out in an orderly and planned manner.
2.
a) Prior to the commencement of development the applicant shall submit to the Planning Authority
for agreement in writing, a Construction and Environmental Management Plan (CEMP) having
regard Inland Fisheries Ireland guidance entitled ‘Guidelines on Protection of Fisheries during
Construction Works in and Adjacent to Waters’ (2016). The submitted CEMP shall include the
following;
(i) Adequate measures for the construction phase to ensure there is no discharge of polluting
matter/sediment laden waters to any waters
Locational details of the monitoring points where daily visual checks and weekly surface water
monitoring (physical and chemical parameters) shall be carried out during the construction
phase, and;
(ii) Details of a suitably qualified person appointed to oversee the implementation of the plan.
b) The development shall be carried out in accordance with the details agreed under (a) above.
Reason: In the interests of environmental protection and to ensure that the development is carried
out in an orderly and planned manner.
3.
a) Any construction and demolition waste or excess soil generated during the construction phase
which cannot be reused on site in accordance with Section 3 (1)(c) and Section 39 (1) of the Waste
Management Act 1996 as amended, shall be disposed/recovered at an appropriately permitted
facility in accordance with the requirements of the Waste Management Act 1996 as amended
using authorised waste collectors authorised to collect the type of material for disposal/recovery
at authorised treatment facilities.
b) Facilities shall be provided for the collection and segregation of recyclable waste. Waste shall be
collected for recycling/reuse whenever feasible or otherwise disposed of in accordance with the
Waste Management Act 1996 as amended.
c) Monaghan County Council and Inland Fisheries Ireland shall be informed immediately of an
accidental spillage of sediment laden waters, fuel, machine oil or any polluting discharge which
may threaten the quality of any watercourse or groundwater body.
d) The applicant shall ensure completely separate foul and surface water drainage systems are in
place.
e) The onsite wastewater treatment system and percolation area shall be maintained in accordance
with manufacturers specifications and shall be desludged as necessary.
f) Any fuels, oils, greases, hazardous liquid wastes, and hydraulic fluids within the site area shall be
stored on site, away from any watercourses in a bunded, leak-proof, and lockable storage area.
Note that bunds are to be designed to contain 110% of the capacity of the largest storage
container located within the bund. There shall be no overflow drain facility from any bunds on site
and all filling and off-take points shall be located within a bund.
g) Material storage, fuel handling, parking areas and other yard activities shall be managed in a
manner which prevents the discharge of polluting matter to ground or surface water.
Reason: In the interests of environmental protection and to ensure that the development is carried
out in an orderly and planned manner.
4.
The development/facility shall be used solely in connection with events associated
with Magheracloone Mitchells GAA Club and shall not be used for commercial activities such as
concerts or other similar events.
Reason: In the interests of residential amenity.
5.
No signs, flags, logos or other advertising material/illumination shall be erected or displayed on-site or
along the roadside without prior permission from the Planning Authority.
Reason: In the interest of visual amenity.
6.
The development shall be retained and carried out strictly in accordance with the plans and
documents submitted on the 25/02/2026 as amended on the 28/05/2026, except as may otherwise be
required in order to comply with the above conditions.
Reason: In the interest of proper planning and sustainable development.
BUILDING CONTROL ADVICE NOTE
Before Any Building Works Commence - Things you should check!
1. Building Control Legal Requirements - Commencement Notice & Fire Safety Certificates (FSC);
In accordance with the Building Regulations you are obliged to submit a Commencement Notice prior to
commencement of a development and it must be submitted not less than 14 days and not more than 28 days
before you wish to commence. The Commencement Notice must be submitted to the Local Authority via the
online national portal BCMS. Applicants are advised to register on this website in advance of submitting a
commencement notice via the attached link: www.localgov.ie/en/bcms
As the type of Commencement Notice required will vary depending on your proposed development, you are
advised to seek advice from your agent or architect on what type of commencement notice is relevant to your
proposed works. Alternatively please feel free to contact Monaghan Fire & Building Control Authority for
advice at 047-30521 or email: bcms@monaghancoco.ie
Please be advised that works can not begin until the applicant has received a valid commencement notice from
the Building Control Authority, and that it is an offence under the Building Control Act 1990 to proceed with the
works without a valid commencement notice and/or a valid FSC (if required for works/development).
2. Pre-Development Conditions;
If there are any Pre-Development conditions on the schedule of conditions attached to your permission you
should give your immediate attention to them prior to the commencement of your development.
N.B. All conditions must be complied with in full as failure to do so will render your permission invalid and
may result in the initiation of enforcement proceedings for compliance with same.
3. Construction Products Regulations (SI No 225 of 2013);
You need to ensure that you, your builder, your designer/assigned certifier and your suppliers are familiar with
the requirements of the Construction Products Regulations.
For more information, please see link provided below.
https://monaghan.ie/firebuildingcontrol/building-control-construction-products-regulation/
4. Responsibilities under the Safety, Health and Welfare at Work (Construction) Regulations 2013;
The regulations are to ensure that there is a safe working environment for all involved in the construction
works, including dwellings.
For more information;
http://www.hsa.ie/eng/Publications_and_Forms/Publications/Construction/Guide_for_Homeowners.html