Loading...
HomeMy WebLinkAbout2660177 - Final Grant 27/07/2026 To: Macartan View Limited Ronan Woods Genesis Planning Consultants Dean Swift Building Armagh Business Park, Hamiltonsbawn Road, BT601HW File Number - 26/60177 Planning and Development Act 2000 (as amended) NOTIFICATION OF FINAL GRANT Monaghan County Council has by order dated 23/06/2026 granted the above named, for the development of land namely for:- retention permission and permission for the residential development as under construction pursuant to permission 19441 (as extended under 25/9002) and as amended under permission 25/60317 Retention Permission is sought for the following works: •Works for plot units 24-27 inclusive to include for retention of works to subfloor level as constructed. Permission is sought for the following works: •A revised unit mix for units 1-27 to provide for a total of 8 no. 2bed and 19 no. 3bed dwellings (change of house types from units as granted); •Associated reconfiguration of curtilage works associated with units 1-27 inclusive; •Amendments to façade and design of units 1-27; •Associated amendments to site landscaping and ancillary works within the site , at Lands at, Macartan View, Monaghan Town, subject to the 5 condition(s) set out in the Schedule attached. Signed on behalf of MONAGHAN COUNTY COUNCIL. __________________________ ADMINISTRATIVE OFFICER __________________________ DATE I refer you to the Health and Safety Authority website www.hsa.ie for new responsibilities for homeowners under Safety, Health and Welfare at Work (Construction) Regulations 2013. 27/07/2026 26/60177 Macartan View Limited, Lands at, Macartan View, Monaghan Town 1. a) Within one month of the final grant of planning permission, the applicant shall submit public lighting details, designed in accordance with BS5489 Lighting Design Standards. b) No development shall commence until the information required under (a) above, has been submitted and agreed in writing with the Planning Authority. c) The development shall be carried out in accordance with details as agreed under part (a) of this condition prior to the occupation of any dwellings hereby granted. Reason: To ensure a satisfactory standard of development. 2. a) Within one month of the final grant of planning permission, the applicant shall submit a Confirmation of Feasibility from Uisce Éireann confirming that Monaghan wastewater treatment plant is capable of accepting the hydraulic and organic loading arising from the development. b) Any construction and demolition waste or excess soil generated during the construction phase which cannot be reused on site in accordance with Section 3 (1)(c) and Section 39 (1) of the Waste Management Act 1996 as amended, shall be disposed/recovered at an appropriately permitted facility in accordance with the requirements of the Waste Management Act 1996 as amended using authorised waste collectors authorised to collect the type of material for disposal/recovery at authorised treatment facilities. c) If infilling material is required to be imported onsite the applicant or economic operator shall; (i) Utilise EPA By-Product Regulation 27 in moving soil infill material from one site to another. Official correspondence demonstrating Article 27 Registration with the EPA shall be submitted to the Planning Authority prior to commencement of development or, (ii) If using waste material as infill and prior to acceptance of material a valid permit must be issued by Monaghan County Council in accordance with the Waste Management (Facility Permit and Registration) Regulations 2007 as amended. d) Facilities shall be provided for the collection and segregation of recyclable waste. Wastes shall be collected for recycling/reuse whenever feasible or otherwise disposed of in accordance with the Waste Management Act, 1996 as amended. e) The developer shall adhere to all measures included in the Construction and Environmental Management Plan (CEMP) as agreed under planning reference 19/441. f) The developer shall ensure that adequate measures and precautions are in place for the construction phase to ensure there is no discharge of polluting matter/sediment laden waters discharging from the site to any watercourse. These measures shall take account of Inland Fisheries Ireland (IFI) guidance entitled ‘Requirements for the Protection of Fisheries Habitat during Construction and Development Works at River Site’. g) All storm water arising from the proposed development shall discharge to an appropriately sized and suitable class 1 interceptor prior to discharge. The interceptor shall be provided with appropriate warning device to indicate when required levels for maintenance have been reached and should be fitted with a sampling chamber, which has easy access. An inspection manhole shall be installed on the outflow pipe from the oil interceptors. h) Sludge/silt/solid wastes arising from the desludging of silt/grit traps, interceptor, and the stormwater drainage system shall be collected by a suitably permitted collector in accordance with the Waste Management Act, 1996 as amended. i) All fuels, oils, greases, hazardous liquid wastes, and hydraulic fluids within the site area shall be stored on site, away from any watercourses in a bunded, leak-proof, and lockable storage area. Note that bunds are to be designed to contain 110% of the capacity of the largest storage container located within the bund. There shall be no overflow drain facility from any bunds on site, and all filling and off-take points shall be located within a bund. j) All waste oils and any other hazardous waste materials shall be stored appropriately and collected, recovered or disposed of in accordance with the Waste Management Act 1996 as amended, and records of such shall be kept on site. k) Monaghan County Council and Inland Fisheries Ireland (IFI) shall be informed immediately of an accidental spillage of sediment laden waters, fuel, machine oil or any polluting discharge which may threaten the quality of any watercourse or groundwater body. l) The applicant shall ensure completely separate foul and surface water drainage systems are in place. m) The applicant/developer shall carry out and submit to the Planning Authority an as-built CCTV survey of the drainage systems within the application site within one month of the completion of the development. The submitted survey shall demonstrate that there are completely separate storm and foul water drainage systems and that no misconnections have occurred. Any misconnections identified shall be rectified. n) The applicant/developer is required to take all necessary precautions to prevent any risk of flooding or pollution occurring to roadways and adjoining properties/lands during all construction works/site works associated with this development/site and on completion of all works Reason: In the interests of environmental protection. 3. a) All hard and soft landscaping, shall be provided in strict conformity with the documentation as submitted to the Planning Authority on the 05th May 2026. b) All landscaping shall be carried out in the first planting season following the final grant of permission and shall be permanently retained thereafter. c) Any planted trees or shrubs removed, dying, being severely damaged and/or becoming seriously diseased within 5 years from the completion of the scheme, shall be replaced by trees or shrubs of similar size and species to those originally required to be planted, unless as otherwise approved in writing by the Planning Authority. Reason: In the interest of visual amenity. 4. The terms and conditions of the original permissions granted under planning file reference 19/441, as extended under planning file reference 25/9002, and planning file reference 25/60317, shall be fully complied with, except where modified by this permission. Reason: To ensure a satisfactory standard of development 5. The development shall be retained and carried out in accordance with plans and documentation submitted to the Planning Authority on the 05th May 2026. Reason: In the interest of proper planning and sustainable development. BUILDING CONTROL ADVICE NOTE Before Any Building Works Commence - Things you should check! 1. Building Control Legal Requirements - Commencement Notice & Fire Safety Certificates (FSC); In accordance with the Building Regulations you are obliged to submit a Commencement Notice prior to commencement of a development and it must be submitted not less than 14 days and not more than 28 days before you wish to commence. The Commencement Notice must be submitted to the Local Authority via the online national portal BCMS. Applicants are advised to register on this website in advance of submitting a commencement notice via the attached link: www.localgov.ie/en/bcms As the type of Commencement Notice required will vary depending on your proposed development, you are advised to seek advice from your agent or architect on what type of commencement notice is relevant to your proposed works. Alternatively please feel free to contact Monaghan Fire & Building Control Authority for advice at 047-30521 or email: bcms@monaghancoco.ie Please be advised that works can not begin until the applicant has received a valid commencement notice from the Building Control Authority, and that it is an offence under the Building Control Act 1990 to proceed with the works without a valid commencement notice and/or a valid FSC (if required for works/development). 2. Pre-Development Conditions; If there are any Pre-Development conditions on the schedule of conditions attached to your permission you should give your immediate attention to them prior to the commencement of your development. N.B. All conditions must be complied with in full as failure to do so will render your permission invalid and may result in the initiation of enforcement proceedings for compliance with same. 3. Construction Products Regulations (SI No 225 of 2013); You need to ensure that you, your builder, your designer/assigned certifier and your suppliers are familiar with the requirements of the Construction Products Regulations. For more information, please see link provided below. https://monaghan.ie/firebuildingcontrol/building-control-construction-products-regulation/ 4. Responsibilities under the Safety, Health and Welfare at Work (Construction) Regulations 2013; The regulations are to ensure that there is a safe working environment for all involved in the construction works, including dwellings. For more information; http://www.hsa.ie/eng/Publications_and_Forms/Publications/Construction/Guide_for_Homeowners.html