Loading...
HomeMy WebLinkAbout2666 - Site Assessment ReportSite Suitability Assessment for one-off wastewater Treatment systems Client: Brendan & Martina Keenan Site: Annahaia, Donaghmoyne, Co. Monaghan. PLANNING D PARTMENT REF. NO. Date: 19/03/2021 I 26 I 66 MONAGHAN CO. COUNCIL Report By: Micheal Murtagh BEng, MIEI,' CEng MON. CO. CO. PLANNING SECTION Phone: E-mail: 087 7570725 I J U L 2026 REG. NO info@berservices.ie APPENDIX B: SITE CHARACTERISATION FORM File Reference: Prefix: Mr• First Name: Brendan & Martina Surname: Keenan Address: Site Location and Townland: Annahaia, Donaghmoyne, Co. Monaghan. Annahala, Donaghmoyne, Co. Monaghan. Telephone No: 087681 1948 Fax No: E -Mail: c/o - info@berservices.ie Maximum no. of Residents: 6 Proposed Water Supply: Mains No. of Double Bedrooms: 0 No. of Single Bedrooms: I Private Well/Borehole t✓� Group Well/Borehole ❑ • • . • .•• • Soil Type, (Specify Type): Bedrock at surface -Calcareous Aquifer Category: Regionally Important Rk Locally Important Poor Vulnerability: Extreme ✓0 High ❑ Moderate Low f I-ligh to Low Unknown Bedrock Type: Visean limestone & calcareous shale Name of Public/Group Scheme Water Supply within 1 kin: N/A Groundwater Protection Scheme (Y/N): No Source Protection Area: SI SO ❑ Groundwater Protection Response: R22 Presence of Significant Sites (Archaeological, Natural & Historical): Past experience in the area: N/A Comments: (Integrate the information above in order to comment on: the potential suitability of the site, potential targets at risk, and/or any potential site restrictions). This site may be suitable subject to further analysis. Integrating the above information groundwater appears to be the main target at risk. Note: Only information available at the desk study stage should be used in this section. 3.1 Visual Assessment Landscape Position: Toe of the slope Slope: Steep (>1:5) Shallow (1:5-1:20) ❑✓ Relatively Flat (<1:20) Surface Features within a minimum of 250m (Distance To Features Should Be Noted In Metres) Houses: One off houses East & West of the Proposed Percolation Area Existing Land Use: Agricultural Vegetation Indicators: n/a Groundwater Flow Direction: Southerly direction as indicated on site sketch Ground Condition: Dry & firm Underfoot Site Boundaries: Ditch/Road- as per Site Sketch Roads: Public Road North East of the proposed percolation area Outcrops (Bedrock And/Or Subsoil): j None within 100m of the proposed site Surface Water Ponding: None within 100m of the proposed sits Lakes: None within 100m of the proposed site Beaches/Shellfish: None within 100m of the proposed site Areas/Wetlands: None within 100m of the proposed site Karst Features: None within 100m of the proposed site Watercourse/Stream': None within loom of the proposed site Drainage Ditches*: Drainage ditch West of the proposed percolation area - approx 100m Springs / Wells*: None within 100m of the proposed site Comments: (Integrate the Information above in order to comment on: the potential suitability of the site, potential targets at risk, the suitability of the site to treat the wastewater and the location of the proposed system within the site). Integrating the above information groundwater would seem to be the main potential target at risk. Further analysis is to be carried out via trial hole inspection and percolation tests. 'Note and record water level 3.2 Trial Hole (should be a minimum of 2.1m deep (3m for regionally important aquifers)) To avoid any accidental damage, a trial hole assessment or percolation tests should not be undertaken in areas, which are at or adjacent to significant sites (e.g. NHAs, SACs, SPAs, and/or Archaeological etc.), without prior advice from National Parks and Wildlife Service or the Heritage Service. Depth of trial hole (m): 1.70 Depth from ground surface Depth from ground surface to bedrock (m) (if present): L 1.701to water table (m) (if present): Depth of water ingress: I Rock type (if present): Date and time of excavation: 10/03/2021 16:30 Date and time of examination: 18/03/2021 09:00 Depth Soil/Subsoil Plasticity and Soil Density/ Colour"*** Preferential of PIT Texture & dilatancy*** Structure Compactness flowpaths Test* Classification** 0.1 m C 0.2 m C 0.3 m C 0.4 m C 0.5 m j' 0.6m1___ 0.7m[� 0.8m1 0.9 m I 1.0m 0 1.lm( 0 1.2m 1.3m 1.4 m 1.5m1 1.6m 1.7m 1.8m 1.9m 0 2.0 m I 2.1 m 0 2.2 m I 2.3m1 2.4m 0 2.5 m 0 2.6 m 2.7 m 2.8m 2.9m1___ 3.0m N/A Crumb Threads 5,4,4 Crumb ribbons 130mm,150mm, 130mm B E D ROCK BASE OF Soft Brown Firm Brown TRIAL PIT Through Roots None Apparent Likely T value: 15.00 Note: Depth of percolation test holes should be indicated on log above. (Enter P or Tat depts as appropriate). See Appendix E for BS 5930 classification. 3 samples to be tested for each horizon and results should be entered above for each horizon. "" All signs of mottling should be recorded. 3.2 Trial Hole (contd.) Evaluation: This site appears to be suitable as the separation distances can be achieved, the wastewater can be treated before entering the groundwater and the effluent will get away without Ponding at the surface. From analysis of the trial pit and the soil layers a T value in the range 30-60 would be expected. Further investigation to be carried out via the Percolation tests. 3.3(a) Percolation ("T") Test for Deep Subsoils and/or Water Table Step 1: Test Hole Preparation Percolation Test Hole 1 2 Depth from ground surface 400 450 450 to top of hole (mm) (A) Depth from ground surface P g20ir 900 to base of hole (mm) (B) Depth of hole (mm) [B -A] A] 500 470 a5o Dimensions of hole 270 x 280 �X280 260 X=270 [length x breadth (mm)] 1T Step 2: Pre -Soaking Test Holes Date and Time pre-soaking started I 17/03/2021 16:00 17/03/2021 L16:00 17/03/2021 16:o Each hole should he pre -soaped twice before the test is carried out. Each hole should be empty before refilling. Step 3: Measuring T,00 Percolation Test Hole No, 1 J Date of test 18/03/202111 18/03/2021 18/03/2021 Time filled to 400 mm I 8 09:5811 09:58 1 Time water level at 300 mm r 10:071P10:18j1 10:02 9.00iEI 20.00 4.00 Time to drop 100 mm (T,00) jj 11.00 Average T100 If T100 > 300 minutes then T -value >90 — site unsuitable for discharge to ground If T100 ≤ 210 minutes then go to Step 4; If T100 > 210 minutes then go to Step 5; Step 4: Standard Method (where T100 ≤ 210 minutes) Percolation Test Hole 1 2 3 Fill no. Start Finish At (min) Start Finish At (min) Start Finish At (min) Time Time Time Time Time Time (at 300 (at 200 mm) mm) (at 300 (at 200 mm) mm) (at 300 (at 200 mm) mm) 1 10:07 10:2 21.00 10:18 11:00 42.00 10:02 io�fl 6.00 2 10:28 10:5111 23.00j I 11:00 12:0211 62.00 10:08 10:2011 12.00 10:51ll 11:22 31.00 12:02 13:3311 91.0 3 10:20 10:37 17.00 Average At Value 25.00 11.67 65.00 Average At/4 = [Hole No.1] 6.251(t1) Average At/4 = [Hole No.2] 16.251(t2) Average At/4 = [Hole No.3] 2.92 (t3) Result of Test: T =111 (min/25 mm) Comments: The "TTests carried out are within the acceptable range as per the EPA CODE OF PRACTICE Step 5: Modified Method (where T100 > 210 minutes) Percolation Test Hole No. 1 2 3 Fall of water in hole (mm) Time Factor = T, Time of fall (mins) = T, K,s = T, / Tm T - Value = 4.45 /Ki, Time Factor = T, Time of fall (mins) =Tm K,s = T, / Tm T - Value = 4.45 /K,, Time Factor = T, Time of fall (mins) =Tm K„ = T, / Tm T - Value = 4.45 /K„ 300 - 250 I 8.1 8.1 � 8.1 ��� 250 - 200 9.7 � 9.7 ���I_9.7!��� 200 - 150 11.9 ��� 11.9 ��� 11.9 ��� 150 - 100 14.1 14.1 ��� 14.1 ��________ Average T- Value T- Value Hole 1= (t1) 0.00 T- Value Hole 1= (t2) I 0.00 T- Value Hole 1= (t3) I 0.00 Result of Test: T = 0.00 (min/25 mm) Comments: Step 4: Standard Method (where P,00 ≤ 210 minutes) Percolation Test Hole 1 2 3 Fill no. Start Finish Ap (min) Start Finish Ap (min) Start Finish Ap (min) Time Time Time Time Time Time (at 300 (at 200 mm) mm) (at 300 (at 200 mm) mm) (at 300 (at 200 mm) mm) 1 11:25 12:52 87.00 11:37 13:2511 108.00 11:05 12:11 66.00 2 12:52 14:4011 108.00 13:25 15:45 140.00 12:11 13:34 83.00 3 14:40 16:4411 124.00 15:45 19:0511 200.00 13:34 15:2911 115.00 Average Ap 149.33 106.33 88.00 Value Average Ap/4 = [Hole No.1] 26.58(p1) Average Ap/4 = [Hole No.2] L 37.33 (p2) Average Ap/4 = [Hole No.3] 22.001(p, Result of Test: P = 28.64 (min/25 mm) Comments: The "P" Tests carried out are within the acceptable range as per the EPA CODE OF PRACTICE Step 5: Modified Method (where P,f„ > 210 minutes) Percolation Test Hole No. 1 2 3 Fall of water Time Time Kfs P — Time Time K,s P — Time Time K, P — in hole (mm) Factor of fall = T, Value Factor of fall = Tf Value Factor of fall = T, Value = T, (mins) / Tm = 4.45 = T, (mins) / Tm = 4.45 = T, (mins) / Tm = 4.45 = Tm / K,s = Tm / Kfs = Tm / Kt: 300 - 250 I 8.1 �I� 8.1 ��� 8.1 � 250 - 200 9.7 ��� 9.7 ��� 9.7 ��� 200 - 150 11,9 ��� 11.9 ��� 11.9 ��� 150 - 100 14.1 ��� 14.1 ��� 14.1 �� Average P- Value P- Value Hole 1= (p, ) I 0.00 P- Value Hole 1= (p2) I 0.00 P- Value Hole 1= (p3) I 0.00 Result of Test: P = 0.001(min/25 mm) Comments: 3e3(b) Percolation ("P") Test for Shallow Soil / Subsoils and/or Water Table Step 1: Test Hole Preparation Percolation Test Hole 1 2 3 Depth from ground surface of o 0 to top of hole (mm) Depth from ground surface to base of hole (mm) 450 480.00 450 Depth of hole (mm) 4501 4801 450 Dimensions of hole [length x breadth (mm)] 250 X 250 270 X 280 280 X 290 Step 2: Pre -Soaking Test Holes Date and Time pre-soaking started 17/03/2021 I 1600 17/03/2021 16:00 17/03/2021 19:00 Each hole should be pre-soaked twice before the test is carried out. Each hole should be empty before refilling. Step 3: Measuring P,00 Percolation Test Hole No. 1 2 3 I II II Date of test 18/03/2021 I 18/03/2021 18/03/2021 Time filled to 400 mm 1016 10:16 10:19 Time water level at 300 mm 11:25 11:37 11:05 Time to drop 100 mm (P100) 99,00 81.00 49.00 Average P,00 66.33 If P,o0 > 300 minutes then P -value >90 - site unsuitable for discharge to ground If P100 < 210 minutes then go to Step 4; If P,00 > 210 minutes then go to Step 5; t; , ttt t k'1i i I"\il.A r'.H'\ Irlt°I Integrate the information from the desk study and on -site assessment (i.e. visual assessment, trial hole and percolation tests) above and conclude the type of system(s) that is (are) appropriate. This information is also used to choose the optimum final disposal route of the treated wastewater. Not Suitable for Development Suitable for' Discharge Route 1. Septic tank system (septic tank and percolation area) Yes Discharge to Ground Water 2. Secondary Treatment System a. septic tank and filter system constructed on -site and Yes polishing filter; or b. packaged wastewater treatment system and polishing filter Yes Propose to install: Packaged wastewater treatment system and polishing filter and discharge to: Ground Water Trench Invert level (m): -0.40 Site Specific Conditions (e.g. special works, site improvement works testing etc. TRICELL NOVO IRL6+ WWTS TO CONFORM TO EN12566-3 AND COMPLY WITH SR66 TRENCH INVERT LEVEL AT 400MM BELOW EXISTING GROUND LEVEL 72LM OF PERCOLATION PIPE REQUIRED ' note: more than one option may be suitable for a site and this should be recorded 2 A discharge of sewage effluent to "waters" (definition includes any or any part of any river, stream, lake, canal, reservoir, aquifer, pond, watercourse or other inland waters, whether natural or artificial) will require a licence under the Water Pollution Acts 1977-90. Refer to Section 2.6.2. \,tt I-`rL 1=';i1l U; (`I II,:'; SYSTEM TYPE: Septic Tank System Tank Capacity (m3) Percolation Area No. of Trenches Length of Trenches (m) Invert Level (m) 0 SYSTEM TYPE: Secondary Treatment System Filter Systems Media Type Area (m2)* Depth of Filter Invert Level Sand/Soil Soil Constructed Wetland Other SYSTEM TYPE: Tertiary Treatment System Polishing Filter: Surface Area (m2)* I__________ or Gravity Fed: No. of Trenches 0 Length of Trenches (m) I 9.00 Invert Level (m) 0.40 DISCHARGE ROUTE: Mounded Percolation Area No. of Trenches Length of Trenches (m) Invert Level (m) 0 Package Treatment Systems Type Tricell Capacity PE I 6.001 Sizing of Primary Compartment 4.00 rr13 Package Treatment System: Capacity (pe) Constructed Wetland: Surface Area (m2)* I Groundwater ❑✓ Hydraulic Loading Rate * (I/m2.d) 20.00 Surface Water ** Discharge Rate (m3/hr) TREATMENT STANDARDS: Treatment System Performance Standard (mg/I) BOD SS NH4 - N Total N Total P 20.00 H 30.0011 10.00 .00 2.00 QUALITY ASSURANCE: Installation & Commissioning On -going Maintenance Installation to be carried out according to EPA guidelines and Maintenance contract to be entered into between VWJTS planning authority requirements, Manufacturer and Client Commissioning to be carried out by suitably qualified person i.e.. Engineer, Architect, etc; who possess sufficient Indemnity insurance * Hydraulic loading rate is determined by the percolation rate of subsoil ** Water Pollution Act discharge licence required Company: BER SERVICES LTD. Prefix: Mr. First Name: Micheal Surname: Murtagh Address: Annavackey, Hackballscross, Dundalk, Co. Louth Qualifications/Experience: BEng, M.I.E.I., FAS Site Suitability Assessment Course Certified Date of Report: 119/03/2021 Phone: 087-7570725 Fax: N/A e-mail I info@berservices.ie Indemnity Insurance Number: HU P16 1561886 �G6 Signature: —------------- Site Suitability Assessment for one-off wastewater treatment systems Brendan & Martina Keenan, Annahaia, Donaghmoyne, Co. Monaghan. Site 19/03/2021 T1ial hole Site Suitability Assessment for one-off wastewater treatment systems Brendan & Martina Keenan, Annahaia, Donaghmoyne, Co. Monaghan. Test Hole Ti Test Hole Ti 19/03/2021 Test Hole Ti Site Suitability Assessment for one-off wastewater treatment systems Brendan 8t Martina Keenan, Annahaia, Donaghmoyne, Co. Monaghan. Test Hole P1 Test Hole P2 19/03/2021 Test Hole P3 Tricel Site Recommendation Report Tricel Novo Package Plant and Gravity Soil Polishing Filter (Percolation Area) TRICEL Date 19/03/2021 Report No: SA2 MN 8626 Client Name Brendan & Martina Keenan Site Location &T'ownland Annahaia, Donaghmoyne, Monaghan Thank you for choosing Tricel for your wastewater treatment requirements. This report contains the following information for your site and is based on a population of 6 and a PIT value of between 21-40. Please see outlined below the accompanying documents: Section 1: Information on the Tricel Novo Package Plant PLANNING DEPARTMENT • Manufacturers report and sizing of the Tricel Novo Package Plant REF. NO. • Drawing of the Tricel Novo Package Plant 6 / • Certification of the selected Tricel Novo Package Plant • Technical information on the Tricel Novo Package Plant • Optional maintenance agreement for Tricel Novo Package Plant MONAGIiAN CO. COUNCIL Section 2: Information on the percolation area • Percolation area sizing and outline construction separation distances Based on the information provided to us, using SR66 and the EPA Code of Practice: Wastewater Treatment and Disposal Systems Serving Single Houses (p.e. ≤ 10), the appropriate solution for treating wastewater on your site is a Trice] Novo wastewater treatment plant followed by a gravity fed soil polishing filter, also called a percolation area. The Tricel Novo provides secondary treatment using submerged aeration filter technology. The gravity fed soil polishing filter consists of a series of pipe work which distribute the effluent for treat mP ' situ subsoil. CO • CO. MON. PLANNING SECTION j JUL 2026 REG. NO Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel: +353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie Page: 1 Tricel Site Recommendation Report Tricel Novo Package Plant and Gravity Soil Polishing Filter (Percolation Area) TIC EL Typical layout of a Tricel Novo Package Plant and Gravity Soil Polishing Filter: m+, 1(!nt — For your site we recommend a Tricel Novo IRL6+ wastewater treatment plant which is designed to treat a maximum of 900 litres of wastewater per day. This recommendation is based on the EPA Code of Practice which states the plant selection should be based on a hydraulic loading rate of 1501/per person/per day. The Novo IRL6+ has a capacity of 4000 litres, of which 2400 are in the primary chamber, this ensures a long desludging interval. The Tricel Novo range of wastewater treatment plants is fully in conformance with EN12566-3 and complies with SR66. For the soil polishing filter, a minimum of 72m of percolation pipe will be required. The EPA Code of Practice outlines a loading rate on the trench of 25 1/m2/d based on a P/T value of 21.40. It recommends that each percolation trench should be equal in length and no longer than 10m. The percolation pipe is laid in trenches 500mm wide. A Tricel distribution box will be required to split the flow evenly into each trench to ensure even dispersal. Note: In the above named site, a substitute wastewater treatment system may not be put in place of the Tricel wastewater treatment system. This recommendation only applies to the above named site based on the information supplied to Tricel, A Site Characterisation Form should accompany this report. Tricel cannot be responsible for misinformation due to misleading information being received by us from clients. Please see attached the accompanying documents in Section 1 for the Tricel Novo Package Plant and Section 2 for the percolation area. Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel: +353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie Page: 2 Tricel Site Recommendation Report Tricel Novo Package Plant and Gravity Soil Polishing Filter (Percolation Area) T�ICEL Section 1 �4h�� lit I ( L) Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel: +353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie Page: 3 the uo"PYtI rWNe ?, ne-h?'.1 Intl dre'OfANer of r fl r F. mrr•:irrJ SMyb t 0 l.�1lM W+tr I1't.51fSA-4 s' ,.v, Iz^tr:'2.S9 Tricel Site Recommendation Report Tricel Novo Package Plant and Gravity Soil Polishing Filter (Percolation Area) '1l'ZICEL Certificate in accordance with SR66 for EN12566-Part 3 Pfufir-Otut fur Ahwasstcrtcchtik GmbH TREATMENT PERFORMANCE RESULTS Tricgi (Killarney) I3allyspillane Industrial Est., Killarney, Co. Kerry. Ireland EN 12566-3 Results corresponding to EN 12566-3 and S.R. 66 PIA-SR66-1512-1082 Novo Serged fixed film ubm .... Nnnxnal organic, duly lord Nu', eNl t%ydlauiir: doily Icad Mat6dat V1ralLHttghlrses5 Sfructdral hour (CA1,601Aria:l) Owxb4fly rre+tntrrrtn11c+1i Vtf'nrtof;eauences) Ntt+nh$r of donhalf¢n9 FW.1flcsl oenjumpuen 0 26 Old 0 90 m'!d Glass 10'W0"eed plirYlic Vass $ a (Also war condiliwts) Pass Efcrley Lf$u[nl con 910°% 52rnxl.'l Both 9s.9 "•s 11 mg:t N$ -I .N 79.9 % e ms}q 5S 95.3'a 16/1 Not more ihnn once I I Who P,>+tannn-n+lefhfd tsy VIA — Priifinstitut fur Abwassertechnik GmbH (PIA GrabH) Hcrgcnratlier Weg 30 S2074 Aachen, Gc+rmany ;,pv783, eri. +117. ri Sth`g • ` Mint Lau' Jurj 206 Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel: +353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie Page: 4 Tricel Site Recommendation Report Tricel Novo Package Plant and Gravity Soil Polishing Filter (Percolation Area) TRICEL Novo range and its referring test Population ' Dra'wirtg of model of &quivtttertt ° that tarxle (fE) reports'. Watertightness Treatment (EN 12566-3 Efficiency Annex A) (EN 125436- ; 3 Annex B) Initial Pass i Pass Type Test (ITT) .1 PIA2009-WD• PIA2010- AT09011-1055 103I318St3e 6 l# ,j� ! 4"{ 1; . yl WDJNC-f404• iv � `, i 1021.01 PIA2015• r' 1NU/NC-1408- 1031.01 6 �� ' 4; Pass PIA200fl-WD• AYOfl09-1055 ;:. .•,�'-' •1'1{'` " t.. tt l� '-' 1 PIA2015- ! �.. WD/NC-1404- Kz_ (i 1021.01 PIA2015• . Wl0/1NC-1-008- 1031.01 8 s" Pass •r./' t PIA200 -WD- AT0909.1055 • '' ! PIA2015- ..g I • WCrNC-1404- 1021.01 PIA2015- . - . �__ t' WWNC-1406- i 1031.01 Pass Mingo conformity according to S.R. 662015 Pass Range conformity according to S.R. 66:2015 Structural Behaviour (EN 12686- 3 Annex C) Peat; For wet ground conditions also. 1.25 m Installation depth from Intel Invert lass or wet ;round :onditions tIso, 1.25 m ri3tU11ation fepth from ntet invert Pass For vial ground cone Lions 1 also, I 1.25 m Irish lation depth from Inlot avert Durability PIA2015• Dli- 1504- 1023,01 lags �IA2015.1 )II- 1504 - 1023,01 Pass PIA2015- D 14- 102301 Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel: +353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie Page: 5 Tricel Site Recommendation Report Tricel Novo Package Plant and Gravity Soil Polishing Filter (Percolation Area) TRICEL Population equivalent (PE) 10 12 18 Drawwtlng of model of Watertightness ( Treatment the range ' (EN 12566.3 1 Efficiency Annex A) (EN 12566. 3 Annex H) Pass Pass .� PIA2009-WD- Range •JJ AT0909-1055 conformity • according to llii, tl j j( . a P1A2015� WD/NC-1404- S.R. 1 86:2015 1021.01 I- I PIA2015- � WDINC-1406- 1031.01 C' qi Pass PIA2009-W D- AT0909-1055 PIA2015- WDtNC-1404- 1021,01 PIA2015- WD/NC-1406- 1031.01 Pass PIA200S-WD- AT0909-1055 P1A2-015- WDINC-1404- 1021.01 PIA2015- WD/NC-1406- 1031.01 Pass Range I For vet conformity ground aceardieg to conditions S.R. also, 56:2015 1.25m installation depth from inlet invert Struelural I Durability Behaviour (EN 1256- 3 Annex C) Pass ; Pass For wet PIA2015- ground DH - conditions 1504 - also. 1023.01 1.25 m inalallalion depth from inlet invert Pass Pass Range conformity according to S.R. 66:2015 Pass P1A2015- UH- 1504- 1023.01 Pass I Pass For wet , PIA2015- ground OH- conditBons , 1504 - also, 1023.01 1.25 m installation depth from inlet invert Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel: +353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www,tricel.ie Page: 6 Tricel Site Recommendation Report. Tricel Novo Package Plant and Gravity Soil Polishing Filter (Percolation Area) TPICEL Populat'ran II a uivalent (PE) 24 30 3t6 Drawing of model of Watertightness Treatment i the range (EN 12566-3 Efficiency ( Annex A) (EN 12566• i 3Annex B) i Pass i Pass Structural Behaviour (EN i266 3 Annex C) Pass I(4 ,, i PIA2009•WD- I Range PIA2013- M' 1 AT0909.1055 • ; conformity ST -PIT - 1 r r. -'1�;, � ,. °_ _. elj j: { PtA2015- according to S.F. 1303- 10113.01 WD/NC-1404- i, 662015 al 1021.01 For wet is ground '� PIA2015- condilions III ' a;l , WD/NC-14x8- also. - + 11031.01 1.25 m ,1• i' 4.'d Pass PIA2008•WO- AT0909-1055 PIA2015- WO/NC-1404- 1021.01 PIA2015- WD/NC-1406- 1O31.01 Pass P1A2009-WD- AT0909-1055 PIA2015- WD/NC-14O4- i 1021.01 PtA2015 WD/KC-14013- 1031.01 installation depth from inlet invert Durability Pass PIA2015- DH- 1504- 1023.01 Pass Pass Pass Range For Viet E PIA2015 conformity ground DH - according to conditions 1504- S.R. else, 1023.01 66:201b 1,25m installation depth from inlet,nvert Pass Pass ; Pass Range Por wet PIA2015 conformity ground OH - according to conditions 1504 - SR. also, 1023.01 66:2015 1,25 m irista'lwtlon depth from inlet avert Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel: +353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie Page: 7 Tricel Site Recommendation Report Trice] Novo Package Plant and Gravity Soil Polishing Filter (.Percolation Area) TRICEL Poputatlon equivalent (PE) 42 50 [7ravAng of model of the range Watertightness (EN 12566-3 IEffitretnty Annex A) I Treatment (EN 1256(1- 3 Annex 8) Pass Pass „t+ i PIA2009-WD- A10909-1055 Range conformity according to ft' PIA2015- S -R. ,!r I WDINC-1404- 96:2015 • Iy 102101 jLi i„ •' ' PIA2015. I.1!t, WDINC-1408 { 1031.01 Pass Pass PIA200€3-WD- Range AT09D9.1055 conformity according to PIA2D15- S.R. WDINC-1404- 66:2015 1021.01 PIA201 5- j WDINC-1406- 1031.01 Struclurat Behaviour (EN 125&5- 3 Annex C) Pass For wet ground conditions also. 1.25 m installation depth from inlet invert Dutability Pass PtA2015- DFI- 1504- 1023, 01 Pass Pass For v,at i f IA2015- ground DH- conditions ; 1504 - also. 1023-01 1.25m Instalatlon depth from inlet invert Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel: +353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.triceLie Page: 8 Tricel Site Recommendation Report Tricel Novo Package Plant and Gravity Soil Polishing Filter (Percolation Area) TRICEL FNVlk15NI tWA1 TRICEL Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel: +353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie Page: 9 Tricel Site Recommendation Report Tricel Novo Package Plant and Gravity Soil. Polishing Filter (Percolation Area) 1"RICEL ,..I. 1 n' _ .Lr i.:a� (: ..i•..il Urn: How a Trcet Novo works These plants Usn a simple. proven technology, consisting of 3 ireasment tones, in each soar a dlffertrtt stage of the treatment eCcu, t. Wastewater from the dwelling, toilets, sinks. shower etc., entets the plant. 2, Effluent enters the primary settlement chamber, Settlement occur, when tie heavier solids drop out Cl the wastewater and smite to that bottom of the tank to creme sludge, and the lag suer solids float to the top or the water to create a scum. The top tower acts as a seal and stops odours escaping, This chamber separates up to 70% of the solids present. 3. Nets lithe aeration chamber, Where masses of naturally occurring bacteria Inhabit specially designed plastic hitet media. The bacteria feed on the waste removing It from the liquid . A continues wpply of air (loin a low presstne, high volume compressor in the top section of the Unit sustains these bact#rta. Was wirer pashas through the filter media av*r- and over, ensuing a very high treatment efficiency. 4. The liquid then proceeds to the final settlement chamber. Any remaining minufe bactetipl particles separate from 1st* liquid within this chatlibor 9efote discharge from the plant. This process stows the Key features & benefits • Compression moulded SMC tank, The compression moulding process Is one of the mast technologically developed processes available to manufacture structural earnposltas. Components ate mtnttattuitd under hear and high pressure and have unrivalled strength and dufablilty over standard GqP tanks or PE tanks. SMC is unique in the wastewater treatment industry with Tricel SMC tanks operating in some of the harshest cllinatic conditions tot over 50 years with no defects. Tricels ceramic dlffussv Is unique In the domestic ..,a.earrafar tr..annant atom gnatkat and alit tact twira European Certification Requirements All Tricel wastewater treatment plants have been tested to t:uropean certification EN 12566=s and comply with the requirements of S.R. 6-612015, This certification tests all plants for strength, water tightness. durability and treatment efhtiOncy. By using a wastewater treatment plant which Is CE cribbed tliknts can test assVttd that it has complied with tests and Inspections which guarantee a high level of security and efficiency. liquid's velocity, allowing for any find trace Impuntles to settle to the bottom Cl the tank section. A sludge return system then returns these Impurities back to the primary settlement chamber, s. The remaining treated liquid now meets the requited standard and Is safely passed out Cl the Tricel Wove plant system. The treated effluent Is now ready far discharge to a suitably designed discharge area as requited by the relevant local authority. ri Aet &s'.' ltl'.tw. -rr' rmy,tr,}:t r• ;,r as long as all standard competitors rubber equivalents. this saves money In both <al1 out tees and replacement parts. P No <ancrett backnll tot Installation on most sites saving up to fboo over tower quality grplpiastic competitors. tdo moving parts or pumps In the plant ensuring reliahtt' operation and mintmat maintenance and repair -costs. P Tritel Novo plants are designed with a shallow Invert to reduce both installation and time costs 9 Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel: +353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www,tricel.ie Page: 10 7ho'9.stI31 tc+:a,rMiht f 0 iv+irt5:Bbr�f is in•1Uktct80!a'ttlrrl{At ► frr�,;{ct.dthP p.�1�^ilep S03F; iagN hrudr,;nti".r«ewvst.�asna'i�nlAcfr,7 t 50r:.n:.sw.ix;at tihs ,wrc :lcrut"'v. trtt.aFvy?+4re, t.ty4 ' r7.,.lknnt ^'a1 tLntr,' y{e4 a !t, I t1 Uz at v. Tricel Site Recommendation Report Tricel Novo Package Plant and Gravity Soil Polishing Filter (Percolation Area) Homeovrrwers: Individual donwestic installation It, I• 'aaf[":1rT.:W{ofe6P„y1 s'nrwr'6fnr:;g-rar,r0 :gr'trvl rnraiy .Mittodt :Fn ':e AI/C1ty Larger projects: Commercial installation up to SOPE ilL Technical disracteristics/ Plant dimensions 1 Lrfle.y NtxMitt 7rr7rt1 ti3l+1:67",gl 711"t t-0 11 366 2)s i 130 )70 1.175 11 0311 60 THICEL Zb 76 [M1c 776 , ltd L.7) 13 6573 60 7-a )6 10d 73d Ill can 617h 11 dill Ito 3.16 31 1.M 77d ltd };0 III. 13 0435 to + j i 411 36 164 777 $10 top $.375 13 6335 100 -:. -. !� 61tl - db 166 773 !t0 ! 3lq 6175 Lf 0413 760 ?� :.� 644 66 163.3P, , LA HM L31 L! ofb I00 ?7,A to o 36 166 I. lo 100 a }3 l.i III Sb 1.66 2]1 I i,b 503 1.15 1_i 34 i06P!t t 7A 17.16 34 166 160 1.0 4.0 ... 111 11 0.46 t4643 b tbd 217 150 790 111 13 016 ito•a0 t 1ic£IA =4.47 56 164 777 !A Ego 135 LJ } 76 a6 , 36 3M727 Lso t 600 133 1.1 0.16 700.1 � 16A 16.50 60 164 027 i III } 730 LIS L.! OAO Ism 11"a 66 1.tk1 727 350 } 760 L35 1.1 015 700.170•x0: 'iini1Tu �11� 610 18f f M - Sim 146 •,mss ra.1y}Ar6100 0Y MMOM 0 11ttv0411"1 1 Lt.,14611lnv 9'.:'f lti 44M`3fGf iYt'temdarit 5..tt0'e f - i,i'TNl fzr<t7rt-4... Sf0 i^;10t,r'tr t;l'pt tar 7utrp:ARm4r4N40r: ¶c? ,.pea?part .in w5017IDW Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel: +353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie Page: 11 Trice] Site Recommendation Report Tricel Novo Package Plant and Gravity Soil Polishing Filter (Percolation Area) TRICEL Tricot Group Trl¢et s an eat ((shad and %vssrid recornisad Rtabal provider of high pmformenco solutions for the tonuruttion, Environmental; Water and Materials industries erd is a brand ira;flt upon scrvlca. b,?ctt vp and rei'alt Iity. We occupy a unique position In the field of reinforced ol•-istics, comhininn the 1hchnlcas rupertk of ovor 4o years In Cho �( press -moulding,, and Composites Industry. Ttfcul is proud of bring one of the largest nianufirturc:rs of Wm rcr✓/atet Trpatrrient plants In €urape, jrd Ere rewarded by regulators as rho standard ceitets within cite industy Tilcet an etrperts In Shoot Muuiding Compound (SMtC) processes AA0 produce fhe only wastewsthr treitrrsenI planI in purope constructed from this material. This process Izivas rise highest strnn ;Ih in thickness ratin, of any tank on (be rnnrkat ,h(l has no fish, of corrosion uvet vi rite Out fti npauy often Igduttey IOadln(r Innovative solutions that Ott rntSOnIPIA can rrii r „rid orb manufAauthry Ii 5r 0ns'is g nsuntrlea wP supply 9 compryhrnslvv range of products to over 50 countries woridvddo. MtmbersMp of twopeon governing bodies on wsstewotter trestmenti if'e Tticol Efwltormetnial Waste Water Treatment Plants ant fully baled and acctedlied to lot" atiNgdst fMeC1coofta$rtmPtA(Priifrrsilo,tfirAhwaisertuchntkGhltrHiari.thc adirrk Pent Inuiture in future, frst wastewater Ii rirrnlntry Tricel Wastewater nearyrert plants meet wilt. L1144 4 4 regulrelnents which rest both ire nisliry of the rornpnronls As weft as the o'irrsll performance of nit t plAnl rho kiss Water k the national assovanon to• the trcatmenf. clkss�cl WSAY♦iY cor:a'rV,3(ton, MCyfI!nand rMr%tt of water and waste'wate'r j rho kMbDMhsWutswi00 As/.tMlsn000WA) formed In 2007 with the goal of Improving t)sn standard of professsnnalisrr in rhn en -to trnirment of wastrnvater in brined Contact us Today to get a free quote on 00 35j (0) 64 t6�s3lAz. or email us at �=�1€;r(ltric:el.ir Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel: +353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie Page: 12 Tricel Site Recommendation Report Tricel Novo Package Plant and Gravity Soil Polishing Filter (Percolation Area) TPICEL Tricel Novo: Wastewater Treatment System Service Agreement Establdhing a regime of yearly Inspections and maintenance is advised to ensure that your Tricel Novo continues to perform to the same high standards throughout its liktiime. The service agreement covets travel, the service era! the labour cost of seMcing only. Other labour costs art excluded. as are all rt:plaoernent parts. Tricel (Killarney) Unhrnited Company, Sallyspteane Industrial Estate, Killarney. Co,. Kerry, V93 X253, Ireland (`The Company) enter this Tricel Novo service agreement with tare Customer named bekrr: Customer Details: Name: Address: Address o! Site: (If other) Telephone No.: Date of Trice! Novo order: work order No.: Date of Deliveryof Trkel Novo: Date of System Commissioning: Set*e Agreement Fee pant; Date olServke Agreement Com meticemettt: Unit Serial No.: Darin; roatiae .servicing. the service terhnidan %ill petfostn s series of eheeics aed pivttdrrxe.s: Checks: • The air -diffuser is monitored to check for sufficeent dispersion of air. • The sludge return system is functioning correctly, • Toe covers and locks are in place and In good condition, • General appearance and condition of the treatment system is ¢coil, Procedures: • The blower is tested. • The blower filter Is replaced. • The system alarm is tested. - The pump and float -switch are tested (If applicable). • The vents are cleared of any blockages. • The sludge level in the primary chamber n measured. Notes: • Fup inspection labour is covered (including any immediate minor system adjustment requlred), ThIs service agreement does not cover the cost of any labour or materials that may arise as a result of this inspection_ • Components that require repeating vn:7 hxur additional charges. • All service emeententseiicfudslehtg Trert11u31oma }tlntdnited[ar»pa v vasisngrsTreei. Math zoaj Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel: +353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie Page: 13 Tricel Site Recommendation Report Tricel Novo Package Plant and Gravity Soil Polishing Filter (Percolation Area) Ti�ICEL Service Agreement Options: TICK THE SERVICE AGREEMENT OPTION YOU WISH TO AVAIL OF: Please tick one tiara oral Single Service: r] One standard scheduled visit to service the system Since &trite & one emergency btea*down service •. One standard sthtdutedvisit to service the system & one emergency breakdown visit it required Three•yeat service: Oft stheduled visit to service the system pee year. for 3 veers. o live -yew service: One scheduled vial W service Me system per year. to( 5 years. • Unused emergency bteakdawn cover fits cannel be reftetded if a breakdown does no rtatetfalise. Note: In caws in which multiple service agreements have been pu►crtased by a catstomet for IndMdual components of a complete wastewater treatment plant, I.e. a Trice! Novo, Tricel Puraflo or $andcel - a g6scount will apply, This contract is subject to terms & conditions. For Terms & Gandhian&, please contactTritel: Triad(trafaer►eVlllrttrnloedCompany. edut*M Estate Killarne, Co. Kecty,W3X253, Ireland TO: +353 (0)64 663 242 1 Fax: +35310164 6632777 EmaM: Wes0trkeLie i Web: www.trtcel.ie This servke agreement relates only to the Tricot Novo, mernffactured by Trite, its stdtsidieries end associated cdntpanley end Is between the company, or person named in this document, & Tricel. By signing the deduction below, I hereby acknowledge that I. the Customer, have reed, understand and agree to the Inforrstation in the Novo Technical Manual, this service agreement and also the relevant terms $ conditions. Tree! oymes to provide the sersrres lisreet on this service agreement subject to the terms and r?ondbions: Pkose swppfy the ser4kes %sled on rids servke ogreement subject to The terms and conditions: Signed on beh*01 the contpony: Sipped by the ldstonter: Name 18lock Capitals): Name (Block Capitals): Signature: Signature: Date: Gate. lmooftant; Orwgtnal signed service agreements must be returned to Trcei with payment In fs l and in a&arue, In order for the service agreements to be initiated. You are reminded of your obligations to the relevant County count. Trk,N lK31erneyi ttntimittd Company t»dlny is Trtcet March sos> Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel: +353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie Page: 14 Tricel Site Recommendation Report Tricel Novo Package Plant, and Gravity Soil Polishing Filter (Percolation Area) TRICEL rK.anae,... Section 2 The design and construction of the polishing filter is the responsibility of the site engineer. A full site layout drawing should accompany this report. The EPA CoP 2009 outlines the design, siting and construction requirements for polishing filters. The tables below outline some of the key factors to take into consideration when designing and locating a polishing filter. TAn 5.1. %tL .ttM 5EFARA 1O (2 WrANCES l MflS. Sephc an1. ln*.mt tteR* Rlttrs. pac Jged systems, percolatlon.wea, Wishing fiite.s tm) yWtlist _ Erufate water soamay1 wat4roowsehtrtanee Open drain Herttapt feaWeet mfAt5ACa lakeottofechore Any dwetnp house Site boundary Trees' 10 10 50. 7 tIpti* tarts 10 pttcoL on area Road 4 slope breaklcuts 4 'See Ansex B: . zTh. e abrray tot wnboe ria et drama@. shou$d be 4oaated down rad:ent of the pet0olibon area rrpobahiigflwr arse also enscae dui lids dstarce is rnsi antd'rorn rtsagt.4owinp %Wm vuW disposal ueas a soakaways iha detancis reed are dirpender* ar .t "pores of site feature 'thrrefore. admoe sbeua be 1ou ht arum the local ai thorny erwrornnent and ptrmmg seabons (oordwv3tcn af!roer and nonage of5oerl asrilor from the Dep`atf�rrent cf ete E vaunmkeif. Mlrttage an Local Goremmeet (DoeK% aptafcalt' the Arthiee fMR of the Natant Moxotn.nte Seeho and the Naretcat Parks amt Wtd'3e Se+ute If ootesderrsg damharpnp to a Wetroo3w'st @sat *tans to an f* W'SAC the relevant le slabun is Ms 63 of tits His D9ect , (N#4A. Natant lieaeae Area; W. Sped area of Conssetvaraon. °free nicer may lead to the won of prefteereo taw pa5tl The canopy sp e3d In3cates pcttnbao root oorersge. Table 6.1 EPA CoP 2009- Minimum separation distances T.BLL 14.1. 11t\LML'yl SOIL VOL158L\G f1LTLR AREAS AND PERCOLATION' TRENCH LENGIHS REQUIRED rOR A f11`E-PERSOi uovst, PIT.vatues' Dfrtel and pumped discharge pacotaRfet! utnoh dfscharpa (Options I and 2) (600 mm wide) (Option 3) Loading at. on plan Area required for (lve loading rate on trench Trench Ienpth required area (thnf1day) persons Im21 area (t&'day) for five persons (m) 3-20 5`1!i L-31 S e1% 230 21-40 !0 .75 25 c60 41-54 si 150 as 60 51-15 ,3 wx50 516 dyci 1Tne loaavv rare s dependent on the pereplabon rote and in the case of an reported m[ td then the htgner of the P•vatue of the Nr•s+tu subsoil and of ftie Irt6mrted ma".erw1 stvvuld be used to sae the pvtshesg nper Table 10.1 from EPA CoP 2009 - Loading rates for gravity fed soil polishing filter Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co.Kerry, V93 X253 Tel: +353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie Page: 15 Tricel Site Recommendation Report Tricel Novo Package Plant and Gravity Soil Polishing Filter (Percolation Area) T ICEL tt®LE ij. Rtgtmsa€_Ais OF MC0LAIIGN iVIENCa (GR,1*T i" FD) Pe►ooIa 6tmthchnaclartat ;v Requketnents taaop* of pipe *em tank tls ibstrpbuUpn t in 40 fm *udrm�nwe cs box 5 opr of pefv&. tlan trerch from t 1n 200 dlsbdbtatbn box tsegth of per '*I4l ra ptpp to e� tenth to m wapmum Mlnimu,i srstion distance bet+reen 2 in (2 5 m wean! to otr.+ss'I psreef36M treneMs 0ta*ette of pipe tact septbo t k to t00-fto rnm di*MAun bap y'Rf wl9td n pipes, 100 rum We, mi-fta!6d (iyp-a,y s! 4, ei s ,Fi b fi t:B�R) S4i:i8[r� tJ1il P L�1. eifa-hrgr papas wth ptfrttkwis o" tar+h d +'i ttar z4 ab.sd 7S.nua SCE n +4s a' u no rite p g:➢ or P:o es w th vra: oaf ityti r3A-- rropert as Md1h of peteoUUon trstuh Wd rr:a OepM of pfncsla1 of ttenth hbo,1 I<5l1•rem I4� bob« around twataos dapendrnptoat s3! (as p F.y 7 3) BatIANing of paroIatbn trench 00n+ n o(9 to 32 nrrt washed Oars! an 1mrNC p po is# a a i .r+ ZIi0 L±rpe (u. Fid f.11 atntetntdcd bye. to 32.mm ream rtmhtM ur+vet and wit I0rum of :ittsr ptavel ewt ppe: N*etutt$ tad by 3, hrtt tott^ts 1 to p+t tuft* (it�eptMe Oeolefsts shbtr-tr.,m stmt,13r.5a w.th EN tMu 10312 tt:1mn pitt dl point! ied vvht% thite str t~Mwodad ibt M ands of tit* pafaitit.e C &g: b cwt t,hb+uld be vIa bte rd tt $lid t0 Pfttuwot *troy *w.fbef Tft ' rnsy t ;so t v for roddtgrsoot rn p€apotos '&lte nsnitsben the totes m tfos prrout Lion pine ,I1etdd . atspecl*d to wheel drat Itey pro t!a eotrett s ae and true from peers Ift puetrfat,eft pip*t My be Icca40 Ma stsgdpner 680k lxowbed thft s nswrnt,sn of 450 tent of ttnaetat a pfd shave 9ne peers top d. the rtivaed ptot ct n aga.rtst dirnape from *ow IFY, 14t Table 7.3 EPA CoP 2009 - Construction of percolation trenches. For secondary treated waste water the maximum length of percolation pipe in each trench should be 10m as outlined in section 10.1.1 option 3 For further information in relation to percolation area design please refer to the EPA Code of Practice: Wastewater Treatment and Disposal Systems Serving Single Houses (p,e. ≤ 10) Terms and conditions: Tricel cannot accept responsibility for incorrect site details or calculations as these are based on user inputs which are outside of Tricel control. Full terms of website use are available at www.tricelsiteassessor.ie./TermsOfWebsiteUse Tricel (Killarney) Unlimited Company trading as Tricel, Ballyspillane Ind Est, Killarney, Co,Kerry, V93 X253 Tel: +353 64 6632421. Fax: +353 64 6632777 Email:sales@tricel.ie Web: www.tricel.ie Page: 16