Loading...
HomeMy WebLinkAbout2660324 - Site layout planGSPublisherVersion 0.0.100.100 Drawing Number Status Purpose of Issue Client Approval A - Approved B - Approved with Comments C - Do Not Use Notes Scales @ A1 Issuing Office Project No. a. A-Tek Building Unit 2, 4 Edenaveys Industrial Estate Armagh, Co. Armagh, BT60 1NF t. (028) 3752 2271 f. (028) 3751 7590 e. info@daarchitectsltd.com w. www.daarchitectsltd.com Project Title : Drawing Title : scale checkeddatedrawn Client : a. North End Larne Harbour Larne, Co Antrim, BT40 1AJ t. (028) 28269502 f. (028) 28269502 e. info@daarchitectsltd.com w. www.daarchitectsltd.com No part of this document may be reproduced or transmitted in any form or stored in any retrieval system of any nature without the written permission of da architects ltd. as copyright holder except as agreed for use on the project for which the document was originally issued. RevID Issue ID Issue Name Issue Date Issuer-Intls Status Approved by In addition to the hazard/risks normally associated with the types of work detailed on this drawing take note of the above. It is assumed that all works on this drawing will be carried out by a competent contractor working, where appropriate, to an appropriate method statement. Safety Health and Environmental Information Box #### #### #### #### Construction Risks Maintenance/cleaning Risks Demolition/adaptation Risks da architects ltd Project no.Drawing no.Revision Mr T Shanahan & Mrs B Neary Dwelling at Coolartragh Clontibret Co Monaghan 2526 SN GHF N 1.40014.85912.411 31.845 8.9850.61870.000 70.000 13.6925.804 2.500 5.920 22.063 15.256 23.83820.1199.144 16.184 34.25416.262 24.8044.425 3.506 7.955steps up 153.50152 .54150.82150.44 149 .45148 .98149.47149.38 150 .38151.21151.43 151 .50151 .00149.68146.04146.26 146.37146.84148.27149 .25150 .33150.82 150.38149.62148.82 148.29147.83 149 .63149.83150 .20150 .69151.10 151 .49151.95151.57151 .47151.58150 .94150.61151.17 151.45151.98151.90151.74 152.06152 .33152 .69153.05 153.15152.94 152 .49152 .06151 .95151.63151.75151 .69151 .64152.11152 .67152 .99153 .38153.26 153.55154 .03153.54 153.19152 .87151 .97151.54 152 .10151.86 152 .77153 .21153.20153.74153.74153.89154 .11154 .05154.38154.52148.63 146 .76POST 155 .96 TP 155 .12 154 .83 POST POST 154 .64 154 .32 153 .85 153 .16 TP 152 .03 151 .33 150 .31 TP POST POST IL=144.31IL=144.84152 .82 153.42152.70152.20151.48150.71150.43150.54151.49151.96152.65152.89153.33154.10154.08151 .34 154 .51 146.5 154 154 149.5 149.5 149.5 149.5 149.5 152.5 152.5 152.5 152.5 152.5 147 147 153.5 153.5 153.5 148.5 148.5 148.5 153 153 153 153 153 149 149 149147.5 147.5 150 150 150 150 150 151.5151.5 151.5 151.5 151.5 151.5 151.5 151.5 151 151 151 151 151 151 151 150.5 150.5 150.5 150.5 150.5 150.5 152 152 152 152 152 152 148 148 148 FENCEFENCETRACKTRACKDITCHDITCHROAD verge road verge verge verge OUTLINE SPECIFICATIONS FOR MOUNDED SOIL POLISHING FILTER 1. Treated effluent from the mechanical aeration sump unit shall be pumped Intermittently, or fed by gravity if the levels allow, to the distribution chamber on the mound feeding the 5 percolation trenches. The raised mound shall be 1.3m in height throughout its area and consist of the topsoil from the site supplemented by imported good quality topsoil. The mound shall measure 13m x 13m and may be landscaped into the contours of the site. 2. The slope of the percolation trenches from the distribution chamber shall be 1 in 200 3. The length of each of the 5 percolation trenched shall be 10m. Total length 50m. 4. The separation distance between the percolation trenches shall be 2m (ie 2.5m centre to centre) 5. Percolation pipes shall be 100mm diameter smooth wall uPVC sewer pipes, perforated at 4, 6 and 8 o’clock. Perforations shall be 8mm diameter, at 75mm centers along the pipe. Holes shall be checked before installation to ensure they are free from debris. 6. The width of each percolation trench shall be 500mm. 7. The depth of each percolation trench shall be 600mm below the mound surface. 8. Percolation pipes shall be laid on a 250mm bed of washed gravel, having particles in the range of 8 - 32mm. 9. Pipe surround shall be washed gravel, having particle size in the range 8 – 32mm. 10. Pipe cover shall be 150mm depth of washed gravel, having particle size in the range of 8 – 32mm. 11. Geotextile layer to be placed on top of this followed by 100mm topsoil to top of mound. 12. Geotextile shall be in accordance with EN ISO 10319. Access / inspection points and vents shall be provided for the ends of the percolation pipes. Covers shall be visible and installed to prevent the ingress of water. They shall be suitable for rodding and scouring purposes. 13. A surface land drain 1m deep shall be employed upslope of the raised mound soil polishing filter and not closer than 2m to divert surface water away from it and to lower the water table in this area. 14. Ensure that the well proposed for the site satisfies the minimum distance from the percolation area WELL percolation area AA50.60m Key Site Proposed site area - 2485 m2 Proposed garden area - 710 m2 Proposed hardstanding area - 737 m2 Existing tree planted boundaries to be retained Existing hedgrow to be retained, pruned and thickened New indigenous trees screen planting New indigenous hedgrow 50.33 Existing Levels New Proposed Levels Existing Wall New Proposed Wall ABB SPECIES Hedgerow CM Crataegus monogyna Tree Planting BP(f) Betula pendula (Birch) FE(f) Fraxinus excelsior (Ash) QR(f) Quercus robur (Oak) SIZE 1+1 transplant 40-60 12-14 cm RB 12-14 cm RB 12-14 cm RB Den sity (per m2)0.5 m/c - - - Buffer Planting Schedule New Proposed Fence PS(f) Pinus sylvestris - - Spiraea 250-300 cm RB 12-14 cm RB FFL 150.600 planter planter planter planter bbq seating planter planter new boundary fence + hedge (see landscape plan for further detailRETAINED AGRICULTURAL LAND POST sight lines 70 m x 2 .4 m x 1 .05 /2 m (according to 15 .27 County Development Plan 2019 -2015 ) sight lines 70m x 2.4m x 1.05/2m (according to 15.27 County Development Plan 2019-2015) Site Entrance Existing Hedge Height 1570mm open dry ditch seating neighbouring hedge and fence to be maintained to allow for visible distance for sight lines surface land drain existing boundaryexisting bounda r y existing boundaryProposed Dwelling Garage Courtyard Driveway Driveway Garden Garden 1:200 slope Local Class 2 Road retaining wallramp 12345 6 1 2 3 151.91 steps up steps up MH F1 MH S2 New entrance gates & piers ramped pathway ramped pathway 151.51m 150.58m 149.65m 149.00m 149.00m149.00m 148.50m 147.95m 148.30m 148.60m 149.00m 147.98m 147.90m 148.90m Entrance Entrance 149.00m 149.00m plantersteps up steps up 146 .76Sightlines Site Boundary SITE NOTICE LOCATION bounda r y boundary boundary boundary boundary boundaryC C B B Terrace Terrace boundaryProposed site plan 02 1:200 @ A1 27.11.2025 Proposed site plan 1 : 200 Planning issue a a client Value engineering 04/03/26RECEIVED: 28/07/2026