Loading...
HomeMy WebLinkAbout2660303 - Acknowledgement / Validation Letter 29/07/2026 Uisce Éireann C/O Paul Iliffe Jacobs Engineering Termini Building 3 Arkle Road, Sandyford D18 C9C5 Ref. No:- 26/60303 A Chara, I wish to acknowledge receipt of your application for permission for a ten-year planning permission for the rationalisation and upgrading of wastewater infrastructure serving Oram village, County Monaghan comprising: (1) The decommissioning of the existing Oram Wastewater Treatment Plant (WwTP), including the decommissioning, removal, abandonment or making safe of wastewater treatment infrastructure, site restoration, boundary treatment works and landscaping; (2) The upgrading of the existing Church Wastewater Pumping Stations (WwPS), including the provision a control kiosk (2.88m3) and below ground flowmeter and value chamber, associated pipework, drainage, electrical infrastructure, lighting and 2.4m high security fencing; (3) The 440m2 extension and upgrading of the existing Sruth an Luir Wastewater Pumping Station (WwPS), including the provision of a wet kiosk (0.22m3), control kiosk including welfare facilities (20.59m3), emergency shower (5.38m3), chemical dosing infrastructure consisting of storage tank (7.2m3) and dosing kiosk (2.08m3), upgraded access arrangements, drainage, electrical infrastructure, area of hardstanding, lighting and 2.4m high security fencing; (4) The construction of new below ground wastewater transfer infrastructure, comprising approximately 3.8km of rising main and approximately 400m of gravity sewer together with associated chambers and air management infrastructure, located within the existing L76003, R182, and R181 public road corridor, extending from the existing Church WwPS to the extended Sruth an Luir WwPS and onward to connect with the existing Castleblayney wastewater network; and (5) All associated ancillary works at Oram Village and townlands of Formil, Oram, Lisdoony, Lurganmore, Annyart, Drumaliss, Killygola, Derrycreevy, Drumillard Big and Drumillard Little Castleblayney, Co. Monaghan was received on 16/07/2026. The drawings and specifications submitted with your application are being examined by the Council’s technical staff and you will be notified of the Council’s decision in due course. Please note that no work should be carried out in connection with the proposal until a written grant of permission to do so has been received by you from this Council. The carrying out of work, without the permission referred to, could render you liable for legal proceedings under the Planning Acts. Please note that the validity of this application is subject to the Site Notice complying with the Regulations. An inspection of the site will be carried out within a period of five weeks from the date of receipt of your application. If in the event of the Site Notice not complying with the Regulations, this application will be declared Invalid and returned to you. Mise le Meas, ______________ ADMINISTRATIVE OFFICER