Our Ref: KOR/DS/6499
Date: 14th July 2026
Planning Office,
Monaghan Co. Co.
Dublin St.
Monaghan
Re: Additional Information for Klaine Childcare Ltd. at Drumillard Little, Castleblayney Co.Monaghan
Planning Application Ref:26/60167
Dear Planner,
Further to your request for Further Information in respect of Planning Application Ref. 26/60167, we
enclose our response addressing each of the matters raised in your letter dated 18 June 2026. The
enclosed revised drawings and supporting documentation provide the additional information
requested by the Planning Authority in relation to the proposed material change of use from an existing
commercial unit to a childcare facility at Drumillard Retail Park, Drumillard Little, Castleblayney, Co.
Monaghan. We trust that the enclosed information satisfactorily addresses the Further Information
request and enables the Planning Authority to proceed to a favourable determination of the
application.
Point 01
To ensure the safe and efficient operation of the proposed childcare facility within a shared
commercial environment, further clarity is required regarding the operational arrangements of the
site. Accordingly, please submit:
a) A revised site layout plan and supporting statement demonstrating:
i) Clearly defined set-down/pick-up arrangements for children;
i) A dedicated set-down/pick up area is provided immediately outside the childcare facility
entrance to facilitate the safe drop -off and collection of children. In addition, designated short -
term parking spaces, as identified on the revised Site Layout Plan, are provided for parents and
guardians who wish to park briefly and accompany children to and from the facility. The proposed
pedestrian guard rails provide a physical barrier between the childcare facility entrance and the RECEIVED: 27/07/2026
Page 2 of 8
adjacent internal roadway, at the main entrance to the building, helping to ensure the safe
movement of children and minimising potential conflict with vehicular traffic.
ii) How it is proposed that vehicles would circulate;
ii) The revised Site Layout Plan illustrates the existing vehicular access arrangements and internal
circulation route within Business Park. Vehicles will continue to enter and exit the site via the
existing access points. While no alterations to the existing vehicular access arrangements are
proposed, new traffic management measures are proposed within the parking area previously
permitted under Planning Ref. 05/46. These measures include the implementation of a one -way
vehicular circulation system, aligned with the existing one-way traffic arrangement within the
Business Park, together with new STOP road markings. In addition, a clearly defined pedestrian
walkway is proposed to provide a safe route for pedestrians through the site and to minimise
potential conflict between vehicles and pedestrians. Traffic speeds will continue to be controlled
through the existing speed ramps located along the internal roadway. Existing traffic signage,
including one-way signs, speed limit signs, school warning signs, speed ram p warning signs and
stop signs, will be retained to ensure the safe and efficient operation of the development.
Existing Traffic Control on Site RECEIVED: 27/07/2026
Page 3 of 8
iii) Measures to ensure safe pedestrian movement and segregation between vehicles and
children, including details of upgrades to the existing guard rails;
iii) To enhance pedestrian safety and provide effective segregation between children and vehicles,
new pedestrian guard rails will be installed in accordance with the accompanying drawings. The
proposed guard rails will comprise standard steel pedestrian safety barriers, finished in blue,
approximately 900 mm in height. Guard rail sections will have a maximum length of 2.0 m and will
be positioned directly in front of the childcare facility entrance, with a 1.0 m opening provided
between sections to facilitate controlled pedestrian access.
The proposed guard rails will provide a physical barrier between the entrance doors and the
adjacent internal roadway, discouraging children from inadvertently stepping directly into the
vehicular circulation area while maintaining convenient access for pa rents and staff. In addition,
the parking area approved under Planning Ref. No. 05/46 will be subject to enhanced traffic
management measures, including the introduction of a one -way vehicular circulation system that
aligns with the existing one-way traffic arrangement within Business Park. New STOP Road
markings and directional arrows will be provided to clearly guide vehicle movements, together
with a designated pedestrian walkway. These measures will provide a safe and clearly defined
pedestrian route while minimising potential conflict between pedestr ians and vehicles.
The traffic management layout approved under Planning Ref. No. 00440008 have been
constructed in substantial compliance with the approved permission and already provide
generous, good-quality pedestrian footways throughout the Business Park.
Reference image for Guard Rail RECEIVED: 27/07/2026
Page 4 of 8
iv) Details of staff parking allocation relative to short-term drop-off spaces; and
iv) A total of 25 existing parking spaces will be allocated to the childcare facility. The existing 9
parking spaces currently associated with the childcare facility within the main Business park will
be designated as short-term drop-off/pick-up spaces. In addition, a further 16 existing parking
spaces will be allocated to the childcare facility. Of these, 9 spaces will be reserved for staff
parking, while the remaining 7 spaces will be design ated as short-term drop-off/pick-up spaces.
The revised Site Layout Plan identifies the allocation of staff parking and short -term drop-off/pick-
up spaces, ensuring that dedicated parking provision is available for both staff and
parents/guardians.
Parking Allocation
v) Measures to avoid conflict with existing Business Park traffic, particularly during peak drop-off
and collection periods.
v) The proposed childcare facility has dedicated parking spaces allocated for staff and
parents/guardians, reducing the potential for conflict with parking associated with the existing
Business Park. A dedicated set-down area is provided immediately outside the childcare facility
entrance to facilitate the efficient drop-off and collection of children, while designated short -term
parking spaces accommodate parents and guardians who wish to park before accompanying
children to and from the facility. The existing one-way internal circulation system, together with RECEIVED: 27/07/2026
Page 5 of 8
the proposed enhanced traffic management measures, will assist in maintaining the orderly
movement of vehicles throughout the Business Park.
The accompanying Children Count Timetable demonstrates that the principal drop -off period
occurs between approximately 8:00 a.m. and 10:00 a.m., during which attendance increases
from 22 children to 88 children. Attendance then remains relatively stable du ring the late morning
before reducing around midday. The principal operating hours of the surrounding businesses are
generally between 9:00 a.m. and 5:00 p.m. As such, the majority of childcare drop-off activity
occurs prior to the peak operational period of the Business Park, thereby minimising the potential
for conflict with existing traffic and parking demand. Collection of children is staggered
throughout the afternoon and early evening, avoiding a significant concentration of vehicle
movements at any one time.
Children count timetable
b) Details of any operational measures, including:
i. Staggered drop-off/collection times (if proposed); and
i) Formal staggered drop-off and collection times are not proposed. However, arrivals and
departures naturally occur over a range of times during the childcare facility's operating hours and
are therefore distributed throughout the day rather than occurring simultaneously. This natural
distribution of arrivals and departures reduces the concentration of vehicular movements at any
one time and assists in maintaining the safe and efficient operation of the site.
ii) General site management arrangements during peak hours.
ii.) The proposed childcare facility will operate within the existing site layout and circulation
arrangements serving Business Park. The parking layout and pedestrian infrastructure previously
approved under Planning Ref. No. 00440008 have been constructed in substantial compliance
with the approved permission and provide a safe and well-established environment for both RECEIVED: 27/07/2026
Page 6 of 8
pedestrians and vehicles. The building has historically operated as a school, generating regular
drop-off and pick-up activity, and the proposed childcare facility will operate in a similar manner
using the established access, circulation and parking arrangements. Accordingly, no additional
site management measures are considered necessary during peak drop -off and collection
periods, and the existing site layout is considered capable of accommodating the proposed use in
a safe and efficient manner.
Point 02
The information submitted is insufficient with regards environmental protection.
Accordingly, please submit the following:
a) A feasibility letter from Uisce Éireann confirming that Castleblayney Wastewater Treatment
Plant has capacity to accept the hydraulic and organic loading arising from the proposed
development.
2a) The Planning Authority has requested a feasibility letter from Uisce Éireann confirming that
Castleblayney Wastewater Treatment Plant has sufficient capacity to accommodate the
hydraulic and organic loading arising from the proposed development. Following consultation
with the Environment Section of Monaghan County Council , we can confirm that the proposed
development does not give rise to an increase in occupancy or wastewater loading when
compared with the previously authorised use of the premises. The proposed childcare facility will
accommodate a lower overall occupancy than the previous educational use (Gael Scoil Lorgan)
of the building and, accordingly, will generate a reduced hydraulic and organic loading on the
existing public wastewater network. The subject premises is already served by an existing
connection to the public foul sewer network, which is to remain unchanged. No alterations or
upgrades to the existing foul drainage infrastructure are proposed as part of this development. In
light of the reduction in occupancy and associated wastewater loading, a Confirmation of
Feasibility from Uisce Éireann is not required in this instance and that the existing public
wastewater infrastructure is considered adequate to serve the proposed change of use.
b) A revised site layout plan (1:500) clearly showing the following:
I. The storm water drainage system (in blue) and foul drainage (in red);
II. Location of interceptor and/or any nature-based solutions;
III. The storm water outfalls; and
IV. Location of any watercourses in the vicinity of the site.
RECEIVED: 27/07/2026
Page 7 of 8
2b) The applicant, Klaine Childcare Limited, is leasing the existing building only and has no
ownership, management responsibility or operational control over the external surface water
drainage infrastructure serving the wider Business Park.
The existing storm water drainage network forms part of the original infrastructure constructed
under the parent planning permission (Planning Ref. No. 00440008) for the Business Park
approximately twenty years ago and remains under the control and maintenance of the Business
Park Management Company. The current application relates solely to the change of use of an
existing building. No extensions, external works, site development, alterations to hardstanding, or
modifications to the existing drainage infrastructure are proposed. Consequently, the proposed
development will have no impact on the operation, capacity or configuration of the existing
surface water drainage system, as previously approved. As no works are proposed to the external
drainage network, the information requested in Item 2(b)(i)–(iv) relates to infrastructure that is
outside the control of the applicant and is completely unaffected by the proposed development.
Point 03
In the interest of clarity and to allow for a fully informed decision, please submit details of the
proposed signage to include
I. location, size and design of all signage, and
II. details of any illumination, where proposed.
3) The proposed development includes one backlit fascia sign located above the principal
entrance to the childcare facility on the front elevation of the building. The proposed sign will
measure 2.50 m in width by 0.70 m in height and will display the name an d logo of the childcare
facility. The sign will comprise a high-quality rectangular aluminium composite fascia panel
incorporating backlit acrylic signage, finished in a clean, neutral colour palette. The simple,
contemporary design and high-quality materials provide a welcoming appearance appropriate to
the commercial character of Business Park while clearly identifying the childcare facility.
The proposed fascia sign will be internally illuminated by means of discreet LED backlighting. The
level of illumination will be modest and appropriate to the commercial character of Business
Park, ensuring that the sign remains clearly legible while avoiding undue glare, light spill, or
adverse impacts on visual amenity or on pedestrian and vehicular safety.
RECEIVED: 27/07/2026
Page 8 of 8
Sample Reference Image- Signage
The location and dimensions of the proposed signage are illustrated on Drawing No. 6910 -CSP-
PL-26-05-AI, submitted as part of this Further Information response.
We trust that the enclosed information satisfactorily addresses the Further Information request and
demonstrates that the proposed development is acceptable in planning terms. We trust that the
Planning Authority has sufficient information to proceed with the determination of the application.
Yours sincerely,
Kieran O’Reilly MRIAI
Architect | PSDP | Director