Loading...
HomeMy WebLinkAbout2560394 - F.I. Received Doc. - Asbestos survey Risk assessment MONAGHAN BUS STATION, NORTH ROAD, MONAGHAN TOWN - ASBESTOS SURVEY METHOD STATEMENT & RISK ASSESSMENT Phoenix Environmental Safety Ltd. CONTRACTOR: Phoenix Environmental Safety Ltd. NAME: Jane Hickey ADDRESS: Graigueswood, Freshford, Co. Kilkenny TEL: 056 8832414 FAX: 056 8832950 E-MAIL: admin@phoenixenv.ie Project Name Asbestos Management and Refurbishment/Demolition Surveys at Monaghan Bus Station, North Road, Monaghan Town Brief description of the Task/Activity This Method Statement is specific for carrying out Asbestos Refurbishment/ Demolition Survey at the existing buildings at Monaghan Bus Station, North Road, Monaghan Town Legislation,Codes of Practice /standards Consulted: Safety, Health & Welfare at Work Act 2005 – General Application Regulations 2007 - Construction Regulations 2013 – Working at Height Regulations 2006 - Exposure to Asbestos Regulations 2006/2010 - HSA guidance document: Asbestos Containing Materials (ACMs) in Workplaces - Practical Guidelines on ACM Management & Abatement (2013) - HSE (UK) guidance documents HSG 264 (Asbestos: The Survey Guide) and HSG 227 (A Comprehensive Guide to managing Asbestos in Premises) Site Address/Location: Monaghan Bus Station, North Road, Monaghan Town Start Date/Time: Wednesday 11th February 2026 10am Finish Date/Time: Wednesday 11th February 2026 4pm Site contact: Telephone & email Jim McFaul (087 1130058) – On site in Monaghan Anthony Mcmahon (087 6045143) Property Project Programme Manager - Bus Éireann Personnel likely to be involved Name Role/Trade John Hickey  Asbestos surveyor Eoghan Hickey Asbestos surveyor Jane Hickey Asbestos surveyor Andrew Hickey  Asbestos surveyor Jamie Hogan Asbestos surveyor Site Supervisor: Andrew Hickey Tel: 086 7774901 Safety Officer Andrew Hickey Tel: 086 7774901 Key Plant & Tools The following surveying equipment will be used during the asbestos survey: Other Essential Equipment: N/A Specific Identified Residual Hazards: Refer to the site specific risk assessment Specific Staff Training Safe Pass training & Manual Handling training BOHS P401 - Identification of Asbestos in Bulk Samples BOHS P402 – Building Surveys & Bulk Sampling BOHS P403 - Asbestos Fibre Counting BOHS 404 - Air Sampling & Site Clearance Testing BOHS P405 – Management of Asbestos in Buildings D.G.S.A. (Dangerous Goods Safety Advisor) Bachelor of Science (Hons) in Health and Safety Bachelor of Science (Hons) in Industrial Environmental Science Bachelor of Science in Analytical Science Bachelor of Engineering in Mechanical Engineering o Site Plan o Telescopic A-Frame ladder o Digital camera with flash o Two torches o Asbestos waste bags / approved type o Sample bags (polythene self-seal bags) o Wet wipes and tissues o Pliers/screwdriver/Chisel o Core samplers o Stanley knife with retractable blades o Hand-spray with diluted surfactant o Type H vacuum o Warning Sign and barrier cones RECEIVED: 29/07/2026 MONAGHAN BUS STATION, NORTH ROAD, MONAGHAN TOWN - ASBESTOS SURVEY METHOD STATEMENT & RISK ASSESSMENT Phoenix Environmental Safety Ltd. Survey planning and sequence of operations: PROGRAMME & SAFETY The program of works will be agreed with the client’s representative and may be subject to change at any time. An initial walkthrough of each of the site will be carried out on the morning of the survey with the site contact. The purpose of the walkthrough is to develop a safe plan of work/programme and to identify any additional risks associated with the scope of the asbestos survey. SEQUENCE OF ASBESTOS SURVEY The purpose of the survey is to survey and sample all accessible areas of the existing buildings on the site. All accessible areas will be surveyed and safe access to all areas will be the responsibility of the Client. Access to all external roof areas will be via a boom lift (organised by Phoenix). Representative samples will be collected by the asbestos surveyors for laboratory analysis. Sampling will be carried out in accordance with our Procedures Manual. Site drawings will be used to clearly identify the sampling points. Samples will be taken using a sharp knife with a spring-loaded retractable blade or a simi lar hand tool to cut a representative portion from each suspect sample. No mechanical or electrical power tools will be used for sampling. The suspect samples will be doubled bagged and sealed in airtight plastic bags for laboratory analysis. LIMITATIONS Samples will not be taken where the act of sampling would endanger the surveyor e.g. sampling near working machinery or live electrical equipment. Samples will not be taken when prohibited by the client. Following the completion of the asbestos survey, the surveyor(s) will contact the site contact and complete the sign out sheet NOTES RECEIVED: 29/07/2026 MONAGHAN BUS STATION, NORTH ROAD, MONAGHAN TOWN - ASBESTOS SURVEY METHOD STATEMENT & RISK ASSESSMENT Phoenix Environmental Safety Ltd. SCOPE OF SURVEY - Main Station Building and all associated storage and maintenance sheds within the site boundary RECEIVED: 29/07/2026 MONAGHAN BUS STATION, NORTH ROAD, MONAGHAN TOWN - ASBESTOS SURVEY METHOD STATEMENT & RISK ASSESSMENT Phoenix Environmental Safety Ltd. Method of Access & Egress Telescopic A Frame ladder & MEWP to be supplied by Phoenix Fall Protection Measures: Harness for wear on MEWP Hazardous Substances: Applicable? Yes / No : Very Toxic Harmful/ Irritant Corrosive Dangerous For the environment Oxidizing Highly flammable Explosives Yes (asbestos) No No No No No No Storage of samples: Samples will be doubled bagged in self-seal airtight bags and securely stored in the surveyor’s tool kit Permits to Work: TBC Required Personnel Protective Equipment: Other: 1. High viz vest Safety Boots Hard Hats Safety Gloves Hearing Protection Eye Protection Respiratory Protection P3 Filter 2. Type 5 coveralls YES/NO Yes Yes No Yes Yes Yes Yes EMERGENCY PROCEDURES Emergency procedures to be followed will be as per site rules. In the event of a fire, priority will be given to evacuating the work area by the quickest possible route. Surveyors will familiarise themselves with fire exit routes, assembly points, location of firefighting equipment and first aid facilities prior to commencement of the asbestos survey. The main priority in an emergency situation is to deal with any life-threatening situation, which could include the effects of a fire or injury to surveyors, building staff or members of the public. All work will cease immediately, and the emergency addressed. All Emergency Services: Dial 112 ACCIDENT REPORTING PROTOCOL Employers and the Self Employed have a duty to report accidents and dangerous occurrences (Reportable Incidents) that happen to themselves, their employees, or persons not in their employment where the accident occurs at their place of work or a place of work where they have control. Reportable accidents are notified to the Authority on the IR1 form and Dangerous Occurrences (Reportable Incidents) are Notified to the Authority on the IR3 form. All accidents and dangerous occurrences are recorded in the Phoenix Accident Report Form Name of On-Site First Aider: Andrew Hickey First Aid Box Location: First Aid Box located in Surveyor’s vehicle Location of Nearest Hospital: Monaghan General Hospital Welfare Requirements Site facilities / Off Site Services to be supplied by Others N/A Method Statement & Risk Assessment prepared by: Jane Hickey RECEIVED: 29/07/2026 MONAGHAN BUS STATION, NORTH ROAD, MONAGHAN TOWN - ASBESTOS SURVEY METHOD STATEMENT & RISK ASSESSMENT Phoenix Environmental Safety Ltd. RISK ASSESSMENT RISK RATING = SEVERITY X LIKELIHOOD Potential severely Very likely 3 Likely 2 Unlikely 1 Fatality or cause permanent disability : 3 9 6 3 Serious injury: 2 6 4 2 Require Medical attention: 1 3 2 1 RECEIVED: 29/07/2026 MONAGHAN BUS STATION, NORTH ROAD, MONAGHAN – ASBESTOS SURVEY METHOD STATEMENT & RISK ASSESSMENT Phoenix Environmental Safety Ltd. Location: Monaghan Bus Station, North Road, Monaghan Town Duration : 1 day total Assessment by: Jane Hickey Description: Asbestos Survey at Monaghan Bus Station, North Road, Monaghan Town Works By: Phoenix Environmental Safety Ltd. Date: 9th February 2026 Activity/Hazard Potential risks from these activities Likely- hood Sever- ity Risk Rating Controls Measures Required Responsibility for Control Risk Rating after controls 1-3 1-3 L x S Collecting asbestos samples during asbestos surveys Exposure to asbestos fibres to surveyors, building staff and members of the public. Exposure to asbestos fibres may lead to the following asbestos related diseases: o Asbestosis o Lung Cancer o Mesothelioma 3 3 9 o Ensure that correct sampling procedures are followed at all times o Wear appropriate RPE & PPE at all times o Provide employees with training/information about the dangers of asbestos and the correct use of PPE o Minimum amount of people in the sampling area o Sampling should not be undertaken in normally occupied areas, but if in constant use, periods of minimal occupation should be chosen o Dampen the sampling area where necessary o Use vacuum with HEPA filter where necessary Surveyors on site 1 Working at height Falls of persons Falls of materials Falling from heights can result in death or serious injury. Surveyors may be affected 3 3 9 o Always use adequate PPE o Ensure that work equipment for Work at a Height is in good condition before starting the work o Use GA3 - Report of Results of Inspections of: Work Equipment for Work at a Height o Ensure that there is a safe method of access and egress o Check surface conditions and other permanent features where work at height will be taking before use and at appropriate intervals during use o Ladders to be footed at all times o Where ladders and stepladders are used, they will only be used as a workplace for light work that is low risk and of short duration Surveyors on site 1 RECEIVED: 29/07/2026 MONAGHAN BUS STATION, NORTH ROAD, MONAGHAN – ASBESTOS SURVEY METHOD STATEMENT & RISK ASSESSMENT Phoenix Environmental Safety Ltd. Wild animals in derelict buildings Potential for encountering wild animals and pests such as foxes, cats, rats, pigeons etc. and being injured as a result of being attacked or contracting a disease. Aggregated by: • Likelihood for foxes, cats, rats and pigeons being in the building and its curtilage (e.g. burrow holes, bait boxes, dead pigeons, guano etc.). 3 2 6 o Surveyor to wear appropriate PPE including disposable overalls, gloves, breathing apparatus, goggles, hard hats, boots and boot covers, etc. o Surveyor to have access to welfare facilities. Good basic hygiene to be followed including hand washing and avoiding hand to mouth contact. Regular breaks to be taken, including meals and drinks, away from the work area. o Surveyor to ensure employees have relevant vaccinations for working in derelict buildings. All cuts must be covered with waterproof dressings and medical advice should be sought if wounded. o Surveyors to avoid lone working Surveyors on site 1 Manual Handling Spinal Injuries, Hernias, Cuts, crushing of hands or fingers Injuries to toes and feet Various sprains, strains etc. Surveyors may be affected 3 2 6 All personnel involved in manual handling will wear safety shoes, and gloves as appropriate Avoid carrying awkward items up and down steps o All operatives to have Manual Handling Training Surveyors on site 1 Slips, trips and falls in derelict buildings Falls can be fatal serious injury Surveyors and building staff may be affected 3 2 6 o Identify areas where levels change, e.g. slopes, ramps, steps/ stairs, unexpected holes, bumps, drainage channels o Identify mats and rugs – decorative or functional o Identify slippery surfaces o Identify poorly maintained, damaged floors o Identify trailing cables and hoses o Keep the working area cordoned, clean & tidy Surveyors on site 1 Chemicals Exposure to chemicals can cause fires, explosions, skin and eye irritation, cancer, ill health and other serious injuries 3 2 6 o During the initial discussion with Site contact, the surveyors will ask if they are likely to encounter hazardous chemicals in the areas they are surveying. o Employees are trained in the safe use of working near chemicals o Eye, skin and respiratory protection is provided and worn where appropriate and in accordance with the chemical’s safety data sheet where necessary Surveyors on site Fire Fire can cause smoke inhalation, burns and other serious injuries 3 3 9 o Respond to any fire alarm or raise the alarm if required o In the event of an alarm sounding, follow emergency evacuation procedures and use of fire extinguishers if required o Follow any emergency evacuation procedures that are in place Surveyors on site 1 RECEIVED: 29/07/2026 MONAGHAN BUS STATION, NORTH ROAD, MONAGHAN – ASBESTOS SURVEY METHOD STATEMENT & RISK ASSESSMENT Phoenix Environmental Safety Ltd. Electricity Contact with electrical installations or electrical equipment can cause burns, electrocution and other serious injuries 3 3 9 o All electrical equipment which may be used by surveyors on site will be PAT tested every 6 months and in good working order o No inspection will be carried out on live electrical equipment in the building Surveyors on site 1 Hand tools Working in an environment with hand tools can cause burns, entanglement, fractures, lacerations, amputation and serious injuries if contact is made 3 1 3 o Adhere to all warning signs that may be in place where hand tools are used o Employees are advised of the risks from contact with any hand tools on site o Use hearing protection and all relevant PPE in an environment where hand tools may be used Surveyors on site 1 Moving vehicles on site Contact between people/property and moving vehicles, vehicles overturning/collapsing, people falling from vehicles or collisions can cause damage, crush injuries 3 3 9 o Use all pedestrian and vehicle routes, crossing points, parking, loading and vehicle only areas which are clearly marked and signposted o Keep all routes free of obstructions o Mark any permanent obstructions to ensure people and vehicles are kept apart o Work in a well lit area o High visibility vests/jackets are provided and worn by people who work near vehicles o Adhere to site rules, speed limits and speed ramps/rumble strips etc. are used to control speed, as needed o Avoid working near moving vehicles where possible Surveyors on site Drug paraphernalia in derelict buildings Risk of infection or contracting disease from drug paraphernalia, faecal matter or fungus. Aggravated by: • Likelihood that the building was previously used as a squat. • Drug paraphernalia, toilet tissue etc. may be present. • Fungus growth and extensive dampness may be 3 3 9 o Surveyor to wear appropriate PPE including disposable overalls, gloves, breathing apparatus, goggles, hard hats, boots and boot covers, etc. o Surveyor to have access to welfare facilities. Good basic hygiene to be followed including hand washing and avoiding hand to mouth contact. Regular breaks to be taken, including meals and drinks, away from the work area. o Surveyor to ensure employees have relevant vaccinations for working in derelict buildings. All cuts must be covered with waterproof dressings and medical advice should be sought if wounded. o Surveyor to avoid lone working. RECEIVED: 29/07/2026 MONAGHAN BUS STATION, NORTH ROAD, MONAGHAN – ASBESTOS SURVEY METHOD STATEMENT & RISK ASSESSMENT Phoenix Environmental Safety Ltd. METHOD STATEMENT BRIEFING RECORD Briefing delivered by: Andrew Hickey Position: Surveyor Contractor: Phoenix Environmental Safety Ltd. Site Name: Monaghan Bus Station, North Road, Monaghan Town Method Statement Title: Asbestos Management and Asbestos Refurbishment/Demolition Surveys at Monaghan Bus Station, North Road, Monaghan Town I (the undersigned) have had the contents of this site task and area specific method statement including risk assessment communicated to me and I agree to comply with all conditions and control measures detailed within. If the work activity changes or deviates from that originally scope, I will seek further advice and request an amended method statement. Name (Print) Signature Date Remember: if your task changes and your new task is not reflected and risk assessed within this method statement, STOP your work and contact your Lead Surveyor immediately Where necessary the method statement will be amended on site to reflect site conditions. When an amendment is deemed necessary, all work will be temporally stopped and working procedures will be reviewed NOTES ON AMENDMENTS RECEIVED: 29/07/2026