Loading...
HomeMy WebLinkAbout2560394 - F.I. Maps - Elevations1:100 ELEVATION 1 (PROPOSED) 1 1:100 ELEVATION 1 (PROPOSED) 1 1:100 ELEVATION 3 (NORTH) (PROPOSED) 2 RENDER RENDER RENDER RENDER RENDER 69.19 64.6564.63 64.81 64.80 64.82 64.79 64.80 64.65 64.64 64.63 65.45 64.63 67.17 67.5767.5767.57 66.75 67.0167.0067.01 67.01 66.79 67.47 66.4466.4466.44 66.73 67.18 67.17 67.17 67.17 66.38 66.08 66.08 66.08 64.6464.81 67.01 66.08 FIG 3 STANDING SEAM ZINC ROOF 53345482DEMOLITION WORKS DEMOLITION WORKS LEGEND REVISION WORKS PROPOSED WORKS EXISTING WORKS EXISTING WORKS576757674988FIG 2.1 EQUITONE [linea] SYSTEM (Colour LT20 Pebble) FIG 1 CURTAIN WALL SYSTEM (PROPOSED) CURTAIN WALL SYSTEM (PROPOSED) INSULATED DOUBLE SKIN STANDING SEAM ZINC ROOF (SEAM @ 600 c/c's) (COLOUR: ANTHRA-ZINC PLUS) (SEE FIG 3) (PROPOSED) BUTTRESS WALL (EXISTING) CURTAIN WALL(PROPOSED) AUTOMATIC SLIDING DOORS (PROPOSED) STANDING SEAM ZINC ROOF (SEAM @ 600 c/c's) (COLOUR: ANTHRA-ZINC PLUS (SEE FIG 3) CONCEALED GUTTER DETAIL CANOPY(PROPOSED) INSTALL SOLAR PV (PHOTOVOLTAIC) PANELS TO BE INSTALLED ON SOUTH FACING CANOPY ROOF THROUGHOUT INSTALL SOLAR PV (PHOTOVOLTAIC) PANELS TO BE INSTALLED ON SOUTH FACING CANOPY ROOF THROUGHOUT BREAKOUT OPE TO FLOOR LEVEL TO ACCOMMODATE THE NEW FENESTRATION BREAKOUT OPE TO FLOOR LEVEL TO ACCOMMODATE THE NEW FENESTRATION BREAKOUT OPE TO FLOOR LEVEL TO ACCOMMODATE THE NEW FENESTRATION EQUITONE [linea] SYSTEM (SECRET FIX) (SEE FIG. 1, 2.1) REVISION REVISION REVISION REVISION DRAWN DRAWN DRAWN DRAWN COMMENTDATE COMMENTDATE COMMENTDATE COMMENTDATE DRAWN BY: SCALE: CHECKED BY: DRAWING NAME JOB No.DATE: Irish Rail Iarnród Éireann Irish Rail Iarnród Éireann Údarás Náisiúnta Iompair Chk'd Chk'd Chk'd Chk'd App'd App'd App'd App'd DRAWING No. DRAWING STATUS Structural & Architectural Design Section, Engineering & New Works, Inchicore Works, Inchicore, Dublin 8, D08 K6Y3. PLANNING DRAWING ONLY ELEVATIONS(PROPOSED) Monaghan(MN) Bus Station Accessibility-Upgrade Works 51.2.525 MON 1/100@A2 27/07/2026 A405 AB & DK --- BÉMN01-PH01-IÉCI-ZZ-DR-AR-0001 ----/--/--------- ----/--/--------- ----/--/--------- ----/--/--------- THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL AND ENGINEERING DRAWINGS.RECEIVED: 29/07/2026 68.42 64.62 64.19 63.59 69.25 1:100 ELEVATION 2 (PROPOSED) 1 1:100 ELEVATION 6 (PROPOSED) 45659 533464.64 51.88 64.66 64.64 64.63 64.63 51.88 66.71 66.71 66.69 66.69 68.13 69.12 63.78 64.50 64.822353 30845334CANOPY(PROPOSED) ROOF PARTIALLY DEMOLISHED ALONG WITH BRACKETS TO ACCOMMODATE BUS SHELTER CANOPY POST(PROPOSED) CANOPY POST(PROPOSED) SOLAR PV (PHOTOVOLTAIC) PANELS TO BE INSTALLED ON SOUTH FACING CANOPY ROOF THROUGHOUT EQUITONE [linea] SYSTEM (SECRET FIX) (SEE FIG. 1, 2.1) DEMOLITION WORKS DEMOLITION WORKS LEGEND REVISION WORKS PROPOSED WORKS EXISTING WORKS EXISTING WORKS INSULATED DOUBLE SKIN STANDING SEAM ZINC ROOF (SEAM @ 600 c/c's) (COLOUR: ANTHRA-ZINC PLUS) (SEE FIG 3) (PROPOSED)47354735EQUITONE [linea] SYSTEM (SECRET FIX) (SEE FIG. 1, 2.1) FIG 2.1 EQUITONE [linea] SYSTEM (Colour LT20 Pebble) FIG 1 FIG 3 STANDING SEAM ZINC ROOF REVISION REVISION REVISION REVISION DRAWN DRAWN DRAWN DRAWN COMMENTDATE COMMENTDATE COMMENTDATE COMMENTDATE DRAWN BY: SCALE: CHECKED BY: DRAWING NAME JOB No.DATE: Irish Rail Iarnród Éireann Irish Rail Iarnród Éireann Údarás Náisiúnta Iompair Chk'd Chk'd Chk'd Chk'd App'd App'd App'd App'd DRAWING No. DRAWING STATUS Structural & Architectural Design Section, Engineering & New Works, Inchicore Works, Inchicore, Dublin 8, D08 K6Y3. PLANNING DRAWING ONLY ELEVATIONS(PROPOSED) Monaghan(MN) Bus Station Accessibility-Upgrade Works 51.2.525 MON 1/100@A2 27/07/2026 A407 AB & DK --- BÉMN01-PH01-IÉCI-ZZ-DR-AR-0001 ----/--/--------- ----/--/--------- ----/--/--------- ----/--/--------- THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL RELEVANT ARCHITECTURAL AND ENGINEERING DRAWINGS.RECEIVED: 29/07/2026