Loading...
HomeMy WebLinkAbout2560394 - F.I. Received Doc. - Application - Cover LetterStáisiún Uí Chonghaile, Baile Átha Cliath 1, D01 V6V6 Connolly Station, Dublin 1, D01 V6V6 T (01) 8366 222 E Info@irishrail.ie W www.irishrail.ie Directors: S. Byrne, J. Doran, S. Murphy (U.K), S. Roarty, T. Wynne, G. Cazenave (France), P O’Donoghue, T Pedersen (Denmark) Príomh Fheidhmeannach Chief Executive: M Considine Iarnród Éireann – Irish Rail, cuideachta ghníomhaíochta ainmnithe, faoi theorainn scaireanna, cláraithe in Éirinn ag Stáisiún Uí Chonghaile, Baile Átha Cliath 1, Ur. 119571 Ur. CBL: IE 4812851 O Iarnród Éireann – Irish Rail, a designated activity company, limited by shares, registered in Ireland at Connolly Station, Dublin 1, No. 119571 VAT No. IE 4812851 O Anthony Brown Architect MRIAI Assistant Project Manager Structural & Architectural Design Section Iarnród Éireann – Irish Rail Inchicore Works, Dublin 8, D08 K6Y3 Tel: 087 703 4784 Email: anthony.brown@irishrail.ie www.irishrail.ie 29th July 2026 Planning Offices Monaghan County Council 1 Dublin Street Monaghan H18 X982 Ireland Planner: Brian McGeary Re: Further Information Response – Planning Ref. 25/60394 Dear Sir/Madam, I refer to your correspondence dated 21 November 2025 ( 3 month extension granted) requesting Further Information under Article 33 of the Planning and Development Regulations 2001 (as amended). Please find below the detailed responses: Further Information Item 1-A 1. Having regard to Section 8.8 ‘Surface Water Drainage’ of the Monaghan County Development Plan 2025-2031, it is considered that insufficient information has been provided to demonstrate that the proposed development will not adversely affect existing surface and/or groundwaters. The applicant is therefore requested to submit the following details/documentation: a) Full design details of the proposed stormwater system, clearly demonstrating that surface waters arising onsite will discharge to an appropriately sized and suitable Class 1 interceptor prior to discharge from the site. Stormwater treatment proposals shall consider the use of nature-based solutions for the attenuation and treatment of stormwater run-off from hardstanding areas and shall include proposals for future maintenance of same. Response: The following coordinated documents are submitted in response to Further Information Item 1A: • Drainage Report – Bus Éireann, Monaghan Bus Station, Ref. T011H0141-L1-MO-ZZ-XX-RP-IECI-CV- 0001 Drainage Report • Existing Drainage Plan, Drawing No. T011H0141-L1-MO-ZZ-XX-RP-IECI-CV-0001-REV-2 Drainage Report RECEIVED: 29/07/2026 Directors: S. Byrne, J. Doran, S. Murphy (U.K), S. Roarty, T. Wynne, G. Cazenave (France), P O’Donoghue, T Pedersen (Denmark) Príomh Fheidhmeannach Chief Executive: M Considine Iarnród Éireann – Irish Rail, cuideachta ghníomhaíochta ainmnithe, faoi theorainn scaireanna, cláraithe in Éirinn ag Stáisiún Uí Chonghaile, Baile Átha Cliath 1, Ur. 119571 Ur. CBL: IE 4812851 O Iarnród Éireann – Irish Rail, a designated activity company, limited by shares, registered in Ireland at Connolly Station, Dublin 1, No. 119571 VAT No. IE 4812851 O • Proposed Drainage Plan, Drawing No. T011H0141-L1-MO-ZZ-XX-DR-IECI-CV-0301-REV-3- PROPOSED DRAINAGE PLAN; • Monaghan Local Authorities Water Protection Plan Checklist, Planning Ref. 25/60394; and • Monaghan Bus Station Surface Water Drainage and SuDS Maintenance Proposals, July 2026. Stormwater design, interceptor, SuDS and maintenance The Drainage Report and Proposed Drainage Plan set out the existing and proposed surface-water drainage arrangements. The proposed system includes upgrading the station-building and bus-bay surface-water drainage from 150 mm to 225 mm, extending the system to collect runoff from the eastern bus parking area, and providing a surface-water channel at the entrance ramp. The design has been assessed for a 1-in-30-year storm event with a 20% climate-change allowance. Nature-based/SuDS measures comprise porous asphalt parking bays with an infiltration sub-base, overflow to adjoining planted areas, tree pits beneath paved areas and additional landscaping. Surface water from the hardstanding areas is routed through the interceptor before discharge. The Drainage Report records that the existing interceptor is maintained by ENVA Environmental and that approximately 4.3 tonnes of waste liquid were removed at its April 2026 service, with no defects reported. Bus Éireann will confirm the interceptor type and capacity and, where required, upgrade or replace it to ensure that the final installation is an appropriately sized Class 1 interceptor/separator before discharge from the site. The separate Surface Water Drainage and SuDS Maintenance Proposals confirms ongoing maintenance by Bus Éireann’s appointed contractor and includes inspection, cleaning, silt and debris removal, porous-asphalt maintenance, planted SuDS maintenance, specialist servicing of the Class 1 interceptor, spill response and retention of inspection and waste-disposal records. Further Information Item 1b b) A revised site layout plan, scale 1:500, demonstrating the following: • all proposed surface storm water drainage systems (outlined in blue). • the directional flow of all surface water pipelines. • the location of the petrol interceptor and any other nature-based solutions proposed for treatment/attenuation of stormwater • all associated stormwater discharge points and outfalls. • all proposed foul water drainage systems (outlined in red). Response: Revised site drainage plan Drawing T011H0141-L1-MO-ZZ-XX-DR-IECI-CV-0301, Revision 03 is provided at 1:250, a larger and more detailed scale than the 1:500 scale requested. It identifies the proposed surface-water system in blue and the foul-water system in red, indicates pipeline flow directions, shows the interceptor and nature-based/SuDS measures, and identifies the relevant surface- water discharge connections and outfalls. Drawing T011H0141-L1-MO-ZZ-XX-DR-IECI-CV-0300-REV-2 records the existing drainage arrangement for comparison. Further Information Item 1c c) A fully completed water protection checklist. Response: The completed Monaghan Local Authorities Water Protection Plan Checklist is submitted. It identifies the site as a sewered transport/café development, confirms that the drainage plan includes surface water, RECEIVED: 29/07/2026 Directors: S. Byrne, J. Doran, S. Murphy (U.K), S. Roarty, T. Wynne, G. Cazenave (France), P O’Donoghue, T Pedersen (Denmark) Príomh Fheidhmeannach Chief Executive: M Considine Iarnród Éireann – Irish Rail, cuideachta ghníomhaíochta ainmnithe, faoi theorainn scaireanna, cláraithe in Éirinn ag Stáisiún Uí Chonghaile, Baile Átha Cliath 1, Ur. 119571 Ur. CBL: IE 4812851 O Iarnród Éireann – Irish Rail, a designated activity company, limited by shares, registered in Ireland at Connolly Station, Dublin 1, No. 119571 VAT No. IE 4812851 O foul water, outfalls, interceptor and SuDS measures, and records the proposed use of porous asphalt, tree pits and increased landscaping. Summary Item 1 response: Taken together, the submitted report, drawings, maintenance proposals and completed checklist address the requirements of Further Information Item 1 and demonstrate that surface water will be collected, treated and discharged in a controlled manner to protect existing surface water and groundwater. Further Information Item 2a Further Information Request – Planning File Ref No: 2560394 No. 2 (a) 2. a) The Planning Authority notes that the number of car parking spaces available within the site will be significantly reduced as part of the proposed development. In the interests of clarity, the applicant is requested to provide additional information to clearly demonstrate how the proposal complies with the requirements of section 15.24 Car Parking Standards, Policy CP 1 and associated Table 15.5 of the Monaghan County Development Plan 2025-2031. The submitted information should include details of the existing and proposed number of car parking spaces, accessible spaces, Electrical Vehicle (EV) spaces, taxi spaces and bus parking spaces. Response: Please see completed car-parking compliance schedule, clarification of EV-adjacent bays, concrete yard use below, and revised layout drawing 51.2.525 MON-A303-FI Note 40 spaces are currently provided (existing) - See Drawing No. 51.2.525 MON-A302-FI Gross floor space5 of any existing building(s) in m2 299.1 Sq M Gross floor space of proposed works in m2 056.7 Sq M Gross floor area in m2 355.8 Sq M The car parking minimum requirements shall be calculated in accordance with Monaghan County Development Plan 2025-2031 section 15.24 Car Parking Standards & Table 15.5 Car Parking Standards. RECEIVED: 29/07/2026 Directors: S. Byrne, J. Doran, S. Murphy (U.K), S. Roarty, T. Wynne, G. Cazenave (France), P O’Donoghue, T Pedersen (Denmark) Príomh Fheidhmeannach Chief Executive: M Considine Iarnród Éireann – Irish Rail, cuideachta ghníomhaíochta ainmnithe, faoi theorainn scaireanna, cláraithe in Éirinn ag Stáisiún Uí Chonghaile, Baile Átha Cliath 1, Ur. 119571 Ur. CBL: IE 4812851 O Iarnród Éireann – Irish Rail, a designated activity company, limited by shares, registered in Ireland at Connolly Station, Dublin 1, No. 119571 VAT No. IE 4812851 O Monaghan County Development Plan 2025-2031 section 15.24 Car Parking Standards & Table 15.5 Car Parking Standards. RECEIVED: 29/07/2026 Directors: S. Byrne, J. Doran, S. Murphy (U.K), S. Roarty, T. Wynne, G. Cazenave (France), P O’Donoghue, T Pedersen (Denmark) Príomh Fheidhmeannach Chief Executive: M Considine Iarnród Éireann – Irish Rail, cuideachta ghníomhaíochta ainmnithe, faoi theorainn scaireanna, cláraithe in Éirinn ag Stáisiún Uí Chonghaile, Baile Átha Cliath 1, Ur. 119571 Ur. CBL: IE 4812851 O Iarnród Éireann – Irish Rail, a designated activity company, limited by shares, registered in Ireland at Connolly Station, Dublin 1, No. 119571 VAT No. IE 4812851 O Total minimum Car-parking spaces required with reference to the above calculation is 15 Spaces. Proposed Carparking spaces. 23 car parking spaces were proposed in the original planning application. In addition, in this Further Information response we are adding an additional 3 No. extra parking spaces. 26 car parking spaces are now proposed in total (See Drawing 51.2.525 MON-A303-_FI) Note: The parking spaces include 2 Disable or accessible parking and 3 EV charging parking spaces 2 Disable or accessible parking spaces are highlighted or denoted as point No. 2 (See Drawing 51.2.525 MON-A303-FI) 3 EV charging parking spaces are highlighted or denoted as point No. 26 (See Drawing No. 51.2.525 MON-A303-FI) Designated disabled parking spaces requirement standards TGD M 2022 Access and Use, 1.1.5 On–Site Car Parking For buildings (including apartment buildings), at least 5% of the total number of spaces should be designated car parking spaces, with a minimum provision of at least one such space. Designated disabled parking spaces requirement standards calculations as follows 26 Spaces multiplied by 5% = 1.3 Spaces required (Actual proposed are 2 Spaces) The designated Bus parking spaces are highlighted or denoted as point No. 31 (See Drawing No. 51.2.525 MON-A303-FI) The designated Staff EV parking space are highlighted or denoted as point No. 26 (See Drawing No. 51.2.525 MON-A303-FI), These are designated Staff EV parking space - staff only. Further Information Item 2b Further Information Request – Planning File Ref No: 2560394 No. 2 (b) b) The applicant is requested to clarify if the proposed 2 No. parking spaces adjoining the 3 Electrical Vehicle (EV) charging spaces, as highlighted in green on the submitted layout plan, are to be used as public parking spaces. Response: 2 No. parking spaces adjoining the 3 Electrical Vehicle (EV) charging spaces, as highlighted in green (See Drawing No. 51.2.525 MON-A303-FI) and shall be used for staff parking only. For health and safety reasons vehicles belonging to the general public are not to be permitted to enter the bus yard area Land Use Classification Gross Floor Area Maximum Car Parking Standards Spaces Required Office/Financial and Professional Services 282.6 1 space per 25 Sq M 11.304 Cafe/Bar/Lounge/Restaurant 73.2 1 space per 20 Sq M 3.66 Total Spaces Required 14.964RECEIVED: 29/07/2026 Directors: S. Byrne, J. Doran, S. Murphy (U.K), S. Roarty, T. Wynne, G. Cazenave (France), P O’Donoghue, T Pedersen (Denmark) Príomh Fheidhmeannach Chief Executive: M Considine Iarnród Éireann – Irish Rail, cuideachta ghníomhaíochta ainmnithe, faoi theorainn scaireanna, cláraithe in Éirinn ag Stáisiún Uí Chonghaile, Baile Átha Cliath 1, Ur. 119571 Ur. CBL: IE 4812851 O Iarnród Éireann – Irish Rail, a designated activity company, limited by shares, registered in Ireland at Connolly Station, Dublin 1, No. 119571 VAT No. IE 4812851 O between the entrance and exit automatic lifting bus gates. Within the site the public may only use the designated parking area to the west of the lifting bus gates, where they can then avail of the main final exit and entrance to the North Road. Further Information Item 2c Further Information Request – Planning File Ref No: 2560394 No. 2(c) The Planning Authority notes that the concrete yard area to the rear, (to be extended as highlighted ‘18B’ on the submitted layout plan) is currently used as an ad-hoc car parking area. In the interests of clarity, the applicant is requested to confirm the intended to use of this to-be-extended concrete yard area and clarify whether or not it will be used to facilitate customer/staff car parking. Response: The extended areas denoted 18B proposed includes for new works to provide 3 no. additional demarcated compliant staff car parking bays in a location that had existing ad hoc unused and overgrown former storage spaces. A blockwork perforated screen wall to the front of this area that also partly masked the view of this derelict area is to be demolished also. It is proposed to demolish this wall and storage areas to rear, make good and extend the concrete yard on this highlighted ‘18B area to provide the 3 no. staff car-parking spaces. Other extended yard areas denoted 18B are for bus parking and manoeuvring only, no staff or customer parking to be permitted in this area. The designated Bus overtaking area adjacent denoted 18 A will also have its hardstanding made good and demolition of unused sheds, low level walls and plinths denoted 6 on the plan are to allow space for buses to enter, wait and reverse from their diagonal bays and safely proceed to and from the existing automatic bus gates. No other customer/staff car parking will be facilitated in these areas other than the aforementioned. Further Information Item 2d Further Information Request – Planning File Ref No: 2560394 No. 2(d) The applicant is requested to submit a revised site layout plan to correspond with items (a) to (c) above, as required. Response: Please see revised Site Layout Plan (SLP) Drawing No. 51.2.525 MON-A303-FI Further Information Item 3a/b 3. Section 15.30 ‘Construction Wastes and Construction and Environmental Management Plans’ of the Monaghan County Development Plan 2025-2031 notes that Construction Waste Management Plans shall be required where relevant, to minimise waste and ensure correct handling and disposal of construction waste streams. Having regard to the nature of the works proposed, the applicant is requested to submit the following; a) A site-specific Construction & Demolition Resource Management plan for approval, in accordance with EPA ‘Best Practice Guidelines for the preparation of Resource & Waste Management Plans for RECEIVED: 29/07/2026 Directors: S. Byrne, J. Doran, S. Murphy (U.K), S. Roarty, T. Wynne, G. Cazenave (France), P O’Donoghue, T Pedersen (Denmark) Príomh Fheidhmeannach Chief Executive: M Considine Iarnród Éireann – Irish Rail, cuideachta ghníomhaíochta ainmnithe, faoi theorainn scaireanna, cláraithe in Éirinn ag Stáisiún Uí Chonghaile, Baile Átha Cliath 1, Ur. 119571 Ur. CBL: IE 4812851 O Iarnród Éireann – Irish Rail, a designated activity company, limited by shares, registered in Ireland at Connolly Station, Dublin 1, No. 119571 VAT No. IE 4812851 O construction and demolition projects (2024). b) Asbestos survey and removal plan. Response: 3a - See attached combined: “Construction & Demolition Resource Management Plan and Asbestos-Report”. 3b - See attached reference reports from Phoenix Environmental Safety Limited asbestos survey/removal plan reports:  Monaghan Bus Station North Road Monaghan Town - Asbestos Surveys - Method Statement Risk Assessment Report.  Monaghan Bus Station - Asbestos Survey Report Further Information Item 4 4. In the interests of clarity and appropriate design, and notwithstanding the details provided, the applicant is requested to confirm the description of the proposed external wall cladding of the bus station building and provide a sample of same, along with additional sample images. Revised elevation drawings should also be updated to remove any references to unconfirmed finishes. (Please see submitted elevational Drawing No. A407 and associated annotation ‘Equitone (linea) System (Secret fix) (TBC)).’ Response: Equitone Linea fibre-cement cladding (secret fix) is confirmed. See drawings 51.2.525 MON-A405 & A407-FI with revised elevations to clarify the external cladding as requested in item 4. Physical samples have been hand delivered to Monaghan County Council on the 29-07-2026 to be sent internally to the planning department for the attention of Brian McGeary – Council Planner responsible for the application. See uploaded brochures from the proposed supplier: Equitone-brochure-ireland. Equitone-Linea DOP See also precedent images below for as built example of the external cladding system proposed. https://www.equitone.com/en-ie/ RECEIVED: 29/07/2026 Directors: S. Byrne, J. Doran, S. Murphy (U.K), S. Roarty, T. Wynne, G. Cazenave (France), P O’Donoghue, T Pedersen (Denmark) Príomh Fheidhmeannach Chief Executive: M Considine Iarnród Éireann – Irish Rail, cuideachta ghníomhaíochta ainmnithe, faoi theorainn scaireanna, cláraithe in Éirinn ag Stáisiún Uí Chonghaile, Baile Átha Cliath 1, Ur. 119571 Ur. CBL: IE 4812851 O Iarnród Éireann – Irish Rail, a designated activity company, limited by shares, registered in Ireland at Connolly Station, Dublin 1, No. 119571 VAT No. IE 4812851 O Figure 1 - Architects re-clad of the old toilet block in the historic city of Cahir, Co Tipperary Figure 2 - Architects re-clad of the old toilet block in the historic city of Cahir, Co Tipperary RECEIVED: 29/07/2026 Directors: S. Byrne, J. Doran, S. Murphy (U.K), S. Roarty, T. Wynne, G. Cazenave (France), P O’Donoghue, T Pedersen (Denmark) Príomh Fheidhmeannach Chief Executive: M Considine Iarnród Éireann – Irish Rail, cuideachta ghníomhaíochta ainmnithe, faoi theorainn scaireanna, cláraithe in Éirinn ag Stáisiún Uí Chonghaile, Baile Átha Cliath 1, Ur. 119571 Ur. CBL: IE 4812851 O Iarnród Éireann – Irish Rail, a designated activity company, limited by shares, registered in Ireland at Connolly Station, Dublin 1, No. 119571 VAT No. IE 4812851 O Figure 3 - Architects re-clad of the old toilet block in the historic city of Cahir, Co Tipperary RECEIVED: 29/07/2026 Directors: S. Byrne, J. Doran, S. Murphy (U.K), S. Roarty, T. Wynne, G. Cazenave (France), P O’Donoghue, T Pedersen (Denmark) Príomh Fheidhmeannach Chief Executive: M Considine Iarnród Éireann – Irish Rail, cuideachta ghníomhaíochta ainmnithe, faoi theorainn scaireanna, cláraithe in Éirinn ag Stáisiún Uí Chonghaile, Baile Átha Cliath 1, Ur. 119571 Ur. CBL: IE 4812851 O Iarnród Éireann – Irish Rail, a designated activity company, limited by shares, registered in Ireland at Connolly Station, Dublin 1, No. 119571 VAT No. IE 4812851 O Figure 4 - Architects re-clad of the old toilet block in the historic city of Cahir, Co Tipperary RECEIVED: 29/07/2026 Directors: S. Byrne, J. Doran, S. Murphy (U.K), S. Roarty, T. Wynne, G. Cazenave (France), P O’Donoghue, T Pedersen (Denmark) Príomh Fheidhmeannach Chief Executive: M Considine Iarnród Éireann – Irish Rail, cuideachta ghníomhaíochta ainmnithe, faoi theorainn scaireanna, cláraithe in Éirinn ag Stáisiún Uí Chonghaile, Baile Átha Cliath 1, Ur. 119571 Ur. CBL: IE 4812851 O Iarnród Éireann – Irish Rail, a designated activity company, limited by shares, registered in Ireland at Connolly Station, Dublin 1, No. 119571 VAT No. IE 4812851 O Figure 5 - Architects re-clad of the old toilet block in the historic city of Cahir, Co Tipperary Figure 6 - Architects re-clad of the old toilet block in the historic city of Cahir, Co Tipperary RECEIVED: 29/07/2026 Directors: S. Byrne, J. Doran, S. Murphy (U.K), S. Roarty, T. Wynne, G. Cazenave (France), P O’Donoghue, T Pedersen (Denmark) Príomh Fheidhmeannach Chief Executive: M Considine Iarnród Éireann – Irish Rail, cuideachta ghníomhaíochta ainmnithe, faoi theorainn scaireanna, cláraithe in Éirinn ag Stáisiún Uí Chonghaile, Baile Átha Cliath 1, Ur. 119571 Ur. CBL: IE 4812851 O Iarnród Éireann – Irish Rail, a designated activity company, limited by shares, registered in Ireland at Connolly Station, Dublin 1, No. 119571 VAT No. IE 4812851 O Further Information Item 5a 5. Section 15.22.4 ‘Landscaping and Boundary Treatment’ requires all applications to be accompanied by a comprehensive landscaping plan commensurate to the scale of development being proposed. Having regard to same, the applicant is requested to provide the following additional information; a) Specific details of species, height at planting, height at maturity and an implementation timescale for all proposed planting. Response: See drawing No. 51.2.525 MON-A303-FI for proposed full landscaping plan with all required details as requested. See Landscape Report attached: 51.2.525 MON-Landscape Report. Further Information Item 5b b) Details of proposed retaining walls structures. Planning Authority notes that the submitted layout plan indicates a proposed retaining wall to the rear boundary of the site, however details of same are ‘to be confirmed’. In the interests of clarity and appropriate development the applicant is requested confirm if a new retaining wall is proposed and, if so, provide details of same. Submitted details should include a revised layout plan showing the layout and extent of the proposed retaining wall structure and typical cross-sectional details of same. Response: The proposed retaining walls are to be omitted in the location as previously noted. No new retaining walls are to be proposed for the rear boundary. Further Information Item 6 6. The Planning Authority notes that the proposed development includes proposals for solar panels to be erected to the rear of the bus station building. In the interests of clarity, and for the purposes of determining the appropriate development contributions to be levied in respect of Community Recreation and Amenity facilities, please confirm if the renewable energy generated at the site will primarily be used for on-site usage. Where it is confirmed that the solar panels will be primarily used for delivering energy off site (for sale), please provide details of the rated power output and electricity demand of the user. Response: All PV energy will be used for on-site purposes only. No energy generated will be for sale off site. . RECEIVED: 29/07/2026 Directors: S. Byrne, J. Doran, S. Murphy (U.K), S. Roarty, T. Wynne, G. Cazenave (France), P O’Donoghue, T Pedersen (Denmark) Príomh Fheidhmeannach Chief Executive: M Considine Iarnród Éireann – Irish Rail, cuideachta ghníomhaíochta ainmnithe, faoi theorainn scaireanna, cláraithe in Éirinn ag Stáisiún Uí Chonghaile, Baile Átha Cliath 1, Ur. 119571 Ur. CBL: IE 4812851 O Iarnród Éireann – Irish Rail, a designated activity company, limited by shares, registered in Ireland at Connolly Station, Dublin 1, No. 119571 VAT No. IE 4812851 O Further Information Item 7 7. The Planning Authority notes that the proposed development includes the installation of signage. The applicant is requested to provide further details in respect of this signage in terms of materials, levels of illumination, etc and to demonstrate that the signage will not distract drivers travelling along the adjoining N2 national road, particularly at night. Furthermore, it is noted that signage is not included within the development description. Therefore the applicant is required to amend the development description to include signage within it, to publish revised newspaper notices and erect revised site notices with the amended development description, and to submit copies of both to the planning authority. Response: The applicant wishes to confirm that no new external signage, illuminated signage or advertising signage forms part of the proposed development. Any signage illustrated or referred to in earlier documentation has been omitted from the revised submission drawings and reports. Accordingly, there is no requirement to amend the development description, nor to issue revised site or newspaper notices, as no signage is proposed. Should any clarification be required, please do not hesitate to contact me. Yours faithfully, Anthony Brown Architect MRIAI Assistant Project Manager Iarnród Éireann – Irish Rail RECEIVED: 29/07/2026