Loading...
HomeMy WebLinkAbout2660105 - Final Grant 30/07/2026 To: Martin McElroy Ted Duffy Market Square Drumillard Little Castleblayney A75 FP70 File Number - 26/60105 Planning and Development Act 2000 (as amended) NOTIFICATION OF FINAL GRANT Monaghan County Council has by order dated 26/06/2026 granted the above named, for the development of land namely for:- retention permission for change of finished floor levels, change of ground levels and change of boundary fencing from that previously approved granted planning permission under planning reference (24/60094) , at Annahale, Castleblayney, Co Monaghan, subject to the 5 condition(s) set out in the Schedule attached. Signed on behalf of MONAGHAN COUNTY COUNCIL. __________________________ ADMINISTRATIVE OFFICER __________________________ DATE I refer you to the Health and Safety Authority website www.hsa.ie for new responsibilities for homeowners under Safety, Health and Welfare at Work (Construction) Regulations 2013. 30/07/2026 26/60105 Martin McElroy, Annahale, Castleblayney, Co Monaghan 1. The development hereby permitted shall be completed within the timeframe associated with planning permission file number 24/60094. Reason: To ensure consistency with the established planning history of the site and to comply with Section 40 of the Planning and Development Act 2000 (as amended). 2. a) Within three months of the date of the final grant of permission, the developer shall submit, for the written agreement of the Planning Authority, full details of surface water management measures for the site(s), including: i. measures to ensure that surface water runoff from the rear garden areas is appropriately managed; ii. confirmation that no surface water shall discharge onto adjoining lands or properties; and iii. details of any drainage infrastructure required, including intercepting drains or soakaways, particularly along the rear boundaries. b) The agreed measures shall be implemented in full within three months of written agreement and shall be permanently retained thereafter. Reason: In the interest of orderly development and to protect the amenities of adjoining properties. 3. a) Within three months of the date of the final grant of permission, the developer shall submit, for the written agreement of the Planning Authority, a comprehensive landscaping plan for the site, to include: i. the reinstatement and proper finishing of all rear garden areas; ii. details of soil build-up, topsoil depth and seeding to ensure adequate permeability; and iii. boundary treatments and interfaces with adjoining lands. b) The agreed landscaping shall be completed within the first planting season following agreement and shall be permanently maintained. Reason: In the interests of visual amenity and appropriate design. 4. The development shall be retained, completed and maintained in such a manner as not to give rise to any additional requirement for retaining structures, drainage works, or protective measures on adjoining lands. Reason: In the interests of appropriate design and orderly development. 5. The development of the site(s) shall be retained, completed and maintained in accordance with the pertaining plans, details and conditions of planning permission file number 24/60094 as amended by the plans and details submitted under this application on the 25/03/2026 and the 30/05/2026, and as otherwise required to comply with the above conditions. Reason: In the interests of proper planning and sustainable development. BUILDING CONTROL ADVICE NOTE Before Any Building Works Commence - Things you should check! 1. Building Control Legal Requirements - Commencement Notice & Fire Safety Certificates (FSC); In accordance with the Building Regulations you are obliged to submit a Commencement Notice prior to commencement of a development and it must be submitted not less than 14 days and not more than 28 days before you wish to commence. The Commencement Notice must be submitted to the Local Authority via the online national portal BCMS. Applicants are advised to register on this website in advance of submitting a commencement notice via the attached link: www.localgov.ie/en/bcms As the type of Commencement Notice required will vary depending on your proposed development, you are advised to seek advice from your agent or architect on what type of commencement notice is relevant to your proposed works. Alternatively please feel free to contact Monaghan Fire & Building Control Authority for advice at 047-30521 or email: bcms@monaghancoco.ie Please be advised that works can not begin until the applicant has received a valid commencement notice from the Building Control Authority, and that it is an offence under the Building Control Act 1990 to proceed with the works without a valid commencement notice and/or a valid FSC (if required for works/development). 2. Pre-Development Conditions; If there are any Pre-Development conditions on the schedule of conditions attached to your permission you should give your immediate attention to them prior to the commencement of your development. N.B. All conditions must be complied with in full as failure to do so will render your permission invalid and may result in the initiation of enforcement proceedings for compliance with same. 3. Construction Products Regulations (SI No 225 of 2013); You need to ensure that you, your builder, your designer/assigned certifier and your suppliers are familiar with the requirements of the Construction Products Regulations. For more information, please see link provided below. https://monaghan.ie/firebuildingcontrol/building-control-construction-products-regulation/ 4. Responsibilities under the Safety, Health and Welfare at Work (Construction) Regulations 2013; The regulations are to ensure that there is a safe working environment for all involved in the construction works, including dwellings. For more information; http://www.hsa.ie/eng/Publications_and_Forms/Publications/Construction/Guide_for_Homeowners.html