Loading...
HomeMy WebLinkAbout2668 - Site Assessment ReportV1� FOR KEVIN O'HAGAN, DERRYRELLAN, KILLYBRONE, CO MONAGHAN. Ff_.ANNNJUNG DEPARTMENT FEF. NO. NCIL Np CO. CO. PLANNING SECTION /4 jUL 2u26 REG. NO APPENDIX A: SITE CHARACTERISATION FORM File Reference: Kevin O'Hagan, Cavan Moutry, Emyvale. Prefix: Mr EI First Narne: Kevin Surname: O'Hagan Address: nl rnirallan Killvhrnna (:n_I\Annanhnn Site Location and Towniand: DerryreIlan, Killybrone, Co -Monaghan. Number of Bedrooms: I4 [E Maximum Number of Residents: 6 Comments on population equivalent There are 4 double bedrooms which will equate to six adults. Proposed Water Supply: Mains V Private Well/Borehole Soil Type, (Specify Type): Subsoil, (Specify Type): Bedrock Type: IDMSSL MON. CO. .ANNING SECTION 14 JUL 2026 REG. NO I Group �ell/Borehole 'oorly drained mineral soil. Gleys. AminPD Sandstone and shale till TLCSsS Aquifer Category: Regionally Important Loc ly i}r / Lm Poor EJ No Vulnerability: Extreme High Moderate Groundwater Body: Aughnacloy Status Poor Name of Public/Group Scheme Water Supply within 1 km: Tru R 1 Source Protection Area: ZOO SI SO Groundwater Protec i'' pC)M: Presence of Significant Sites (Archaeological, Natural & Historical): Past experience in the area: Raised mounds gererally required in this area. Comments: I (Integrate the information above in order to comment on: the potential suitability of the site, potential targets at risk, and/or any potential site restrictions). The site is potentially suitable as there appears to be no restrictions to the on -site treatment of domestic effluent. Surface water and ground water could be targets at risk. Note: Only information available at the desk study stage should be used in this section. 3.1 Visual Assessment --- ------- Landscape Position: Low-lying near base of North -Easterly facing slope. Slope: Steep (>1:5) jj Shallow (1:5-1:20) Relatively Flat (<1:20) ✓1 Slope Comment About 1:18 Surface Features within a minimum of 250m (Distance To Features Should Be Noted In Metres) Houses: Dwelling house 55m East North-East, 99m North North-West and 102m North-West. Existing Land Use: Agricultural grassland. Vegetation Indicators: Grass Groundwater Flow Direction: Expected North-East. Ground Condition: Firm during a spell of wet weather. Site Boundaries: Mature hedges all around. 3.1 Visual Assessment (contd.) Roads Local road along the North-Eastern boundary hedge. Outcrops (Bedrock And/Or Subsoil): None Surface Water Ponding: None Lakes Lough More 3.2km South -East. Beaches/Shellfish Areas: None Wetlands: None Karst Features: None Watercourses/Streams:* Rakelly river 282m South -East. *Note and record water level 3.1 Visual Assessment (contd.) Drainage Ditches:' Open ditch along North-East boundary hedge. 1 m deep containing 0.2m water Springs:* None listed within 100m Wells:* None within 100m Comments: (Integrate the information above in order to comment on: the potential suitability of the site, potential targets at risk, the suitability of the site to treat the wastewater and the location of the proposed system within the site). The site was in good condition underfoot with the assessment being carried out during a period of wet weather. "Note and record water level 3.2 Trial Hole (should be a minimum of 2.1m deep (3m for regionally important aquifers)) To avoid any accidental damage, a trial hole assessment or percolation tests should not be undertaken in areas which are at or adjacent to significant sites, (e.g. NHAs, SACs, SPAs, and/or Archaeological etc.), without prior advice from National Parks and Wildlife Service or the Heritage Service. Depth of trial hole (m): 2.1 Depth from ground surface Depth from ground surface to bedrock (m) (if present): to water table (m) (it present): 1.3 Depth of water ingress: 0.81 Rock type ff present): None Date and time of excavation: 08 Jun 2026 12:30 Date and time of examination: 10 -Jun -2026 I 10:00 Depth of Surface and Subsurface Soil/Subsoil Percolation Texture & Plasticity and Soil Density/ Colour**** Preferential Tests Classification** dilatancy*** Structure Compactness flowpaths 0.1 m 0.2 m j 0.3m1 0.4 m 0 0.5 m III 0.6 m ri 0.7 m EI 0.8m FS 0.9m lI 1.0 m 0 1.1 m 1.2 m L.iiilli 1.3m1 1.4m I 1.5 m 1.6m 1.7m C] 1.8m 0 1.9 m 2.0m 2.1 m 2.2 m 2.3 m ] 2.4 m II 2.5 m I 2.6 m II 2.7 m II 2.8 m 2.9 m 3.Om 0 3.1 m 0 3.2m1 3.3 m 3.4 m 3.5m SILT/ CLAY 3 threads -70mm TOP SOIL ribbons — dilatant 5 threads - 110mm SILT / CLAY subsoil ribbons - dilates 50% clay with difficulty. Water table 1.3m Base of trial hole 2.1 m O Likely Subsurface Percolation Value: _.2i Likely Surface Percolation Value: 30 CRUMB BLOCKY SOFT UNCOMPACT BROWN GRASS ROOTS NONE PALE BROWN Note: "Depth of percolation test holes should be indicated on log above. ('Enter Surface or Subsurface at depths as appropriate). See Appendix E for BS 5930 classification. 3 samples to be tested for each horizon and results should be entered above for each horizon. "" All signs of mottling should be recorded. 3.2 Trial Hole (contd.) Evaluation: The trial hole was 2.1 m deep. There were two distinct layers. Silt / clay top -soil and below that sub -soil that was blocky in nature with about 40% clay. The water table was at 1.3m 3.3(a) Subsurface Percolation Test for Subsoil Step 1: Test Hole Preparation Percolation Test Hole Depth from ground surface to top of hole (mm) (A) Depth from ground surface to base of hole (mm) (B) Depth of hole (mm) [B - A] Dimensions of hole [length x breadth (mm)] Step 2: Pre -Soaking Test Holes 2 400 400 400 800 80011 800 400 400 fl 400 290 x 280 fi 280 x 30011 270 x 310 Pre-soak start Date08-Jun-2026 08 -Jun -20261 I 08 -Jun -2026 Time 16:30 16:30 16:30 2nd pre-soak Date 09 -Jun -2026 09 -Jun -2026109 -Jun -20261 start Time 15:00 I 15:00 15:00 Each hole should be pre-soaked twice before the test is carried out. Step 3: Measuring T100 Percolation Test Hole No. 1 1 2 3 Date of test 10-06-2026 10-06-2026 10-06-2026 Time filled to 400 mm 1 10:0011 10:0011 10:00 Time water level at 300 mm I 13:20 13:3011 13:401 Time (min.) to drop 100 mm (T700) 200.00 210.0011 220.001 Average T100 210.00 If T100 > 480 minutes then Subsurface Percolation value >120 — site unsuitable for discharge to ground If T100 ≤ 210 minutes then go to Step 4; If T100> 210 minutes then go to Step 5; Step 4: Standard Method (where T100 ≤ 210 minutes) Percolation Test Hole 1 2 3 Fill no. Start Finish At (min) Start Finish At (min) Start Finish At (ruin) Time Time Time Time Time Time (at 300 (at 200 (at 300 (at 200 (at 300 (at 200 mm) mm) mm) mm) mm) mm) 1 I II II 0.00 I II II 0.00 I II 0.00 _II 2 II II 0.001 II II o.00l I IP II 0.00 3 ii 0.001 II0 0.00l II II 0.00 Average At 0.00 0.00 0.00 Value Average At/4 = Average At/4 = Average At/4 = [Hole No.1] I 0.001(t1) [Hole No.2] I 0.001(t2) [Hole No.3] 0.00 (t3) Result of Test: Subsurface Percolation Value = 10.00 (min/25 mm) Comments: With the sub -surface tests being slow I proceded to step 5 Step 5: Modified Method (where T100>210 minutes) Percolation Percolation Test Hole No. 1 Test Hole No. 2 Fall of water Time Start Finish Time K„ T- Fall of water Time Start Finish Time K,, T- in hole (mm) Factor Time Time of fall = T, Value in hole (mm) Factor Time Time of fall = T Value =T, hh:mm hh:mm (rains) /T =4.45 =T, hh:mm hh:mm (rains) /T, =4.45 = T /K, = Tm /Kr 300-250 8.1 13:20 14:20 60.0011 0.1411 32.96 300-250 I8.1 13:30 14:50 80.0011 o.ioll 43.95 250 - 200 I9.7 14:20 15:40 80.0011_0.1211_36.70] 250 - 200 I9.7 14:50 16:00 70.0011 0.1411 32.11 200 -150 I 11,9 15:40 17:551 -I35.00 0.09 50.48 200- 150 I__11.91116:00 18:00 120.00 0.10 44.87 150 - 100 14.1 17:551120:4011165.00 0.09 52.07 I 150 - 100 I 14.1 18:00 21:10 190.00 0.07 59.96 Average T- Value T- Value Hole 1 = (T1) 43.06 I Average T- Value T- Value Hole 2 = (T2) 45.23 Result of Test: Subsurface Percolation Value = Percolation 45.27 (min/25 mm) Test Hole No. 3 Fall of water Time Start Finish Time K,. T— Comments: in hole (mm) Factor Time Tim§e of fall =T Value II = T, hh:mm hh:mm (mins) /T,n = 4.45 A raised mound will be required due to the amount of clay =T /J in the subsoil. 300 - 250 I8.1 13:40 I 15:10 90.0011 0.09D 49.44 250- 200 9.7 115:10116:20 7opjI 0.1411 32.11 200- 150 11.9 16:20 I 18:30 130.0011 0.09f61 150-100 14.1 18:30 21:40 190.0011 0.07 Ir96I Average T- Value T- Value Hole 3 = (T2) I 47.53 3.3(b) Surface Percolation Test for Soil Step 1: Test Hole Preparation Percolation Test Hole 1 2 3 Depth from ground surface I II 1I 1 to top of hole (mm) Depth from ground surface 400 400 400 to base of hole (mm) Depth of hole (mm) 1 40011 40011 400 Dimensions of hole [length x breadth (mm)] I 290 x 280 11 280 x 28011 290 x 2701 Step 2: Pre -Soaking Test Holes Pre-soak start Date 08 -Jun -2026 08 -Jun -2026 08 -Jun -2026 Time 16:35 16:35 16:35 2nd pre-soak Date 09 -Jun -2026 09 -Jun -2026 09 -Jun -2026 start Time 15:05 15:05 15:05 Each hole should be pre-soaked twice before the test is carried out. Step 3: Measuring T100 Percolation Test Hole No. Date of test I 10 -Jun -26 10 -Jun -26 1 1 10 -Jun -2026 Time filled to 400 mm 10:05 10:0511 10:05 11:15 11:10 11:15 Time water level at 300 mm 70.00 II 65.00 70.00 Time to drop 100 mm (1) 68.33 Average Ti., If T,00 > 480 minutes then Surface Percolation value >90 - site unsuitable for discharge to ground If T1 ≤ 210 minutes then go to Step 4; If T100 > 210 minutes then go to Step 5; Step 4: Standard Method (where T100 ≤ 210 minutes) Percolation Test Hole 1 2 3 Fill no. Start Finish AT (min) Start Finish AT (min) Start Finish AT (min) Time Time Time Time Time Time (at 300 (at 200 mm) mm) (at 300 (at 200 mm) mm) (at 300 (at 200 mm) mm) 1I 11:15 12:4011 85.00 11:10 12:2511 75.00 11:15 12:4511 90.001 2 I 12:40 14:3011 110.00 12:25 14:2011 115.00 12:45 14:4011 115.001 3 Average AT I 14:30 17:4011 190.00114:201117:2011 128.33 180.00 123.33 14:401117:4511 185.001 130.00 Value Average AT/4 = [Hole No.1] I 32.081(T1) Average AT/4 = [Hole No.2] I 30.831(T2) Average AT/4 = [Hole No.31 32.501(T3' Result of Test: Surface Percolation Value = 31.811 (min/25 mm) Comments: 'he topsoil at this site is of fair quality and may be used to form a raised mound soil percolation area to polish treated effluent from an dvanced treatment system. Step 5: Modified Method (where T100> 210 minutes) Percolation Test Hole No. 1 Fall of water Time Start Finish Time K,, T — in hole (mm) Factor Time Time of fall = T, Value =T, hh:mm hh:mm (mins) /T, =4.45 =1-r /K1, 300 - 250 8.1 0.00 l 250 - 200 9.7 00 0.00 l� 200- 150 11.9 =� 0.0011� 150-100 14.1 0� 0.00111= Average T- Value T- Value Hole 1 = (T, ) I 0.00 Percolation Test Hole No. 3 Percolation Test Hole No. 2 Fall of water Time Start Finish Time K„ T— in hole (mm) Factor Time Time of fall = T, Value =1-, hh:mm hh:mm (mins) IT,, =4.45 T, 300- 250 8.1 I= 0.0011 250 - 200 9.7 �0 0.0011= 200- 150 I11.911 0.00 I_ 150 - 100 14.1 00 0.00 =� Average T- Value T- Value Hole 2 = (12) I0.00 Result of Test: Surface Percolation Value = I 0.00 (min/25 mm) Fall of water Time Start Finish Time K,, T- Comments: in hole (mm) Factor Time Time of fall = T, Value =T, hh:mm hh:mm (mins) /T, =4.45 =T /K„ 300 - 250 I 8.1 � 0.00 250 - 200 9.7 0� � 0.00 � 200- 150 11.9 0 �I 0.00 150- 100 14.1 =� 1 0.00 1 ______ Average T- Value T- Value Hole 3 = (T2) I 0.00 Integrate the information from the desk study and on -site assessment (i.e. visual assessment, trial hole and percolation tests) above and conclude the type of system(s) that is (are) appropriate. This information is also used to choose the optimum final disposal route of the treated wastewater. Slope of proposed infiltration / treatment area: 1:18 Are all minimum separation distances met? I // Depth of unsaturated soil and/or subsoil beneath invert of gravel (or drip tubing in the case of drip dispersal system) 0.90 Percolation test result: Surface: 31.81 Sub -surface: 45.27 Not Suitable for Development II Suitable for Development Q Identify all suitable options Septic tank system (septic tank and No percolation area) (Chapter 7) Secondary Treatment System (Chapters 8 and 9) and soil polishing filter Yes (Section 10.1) 3. Tertiary Treatment System and Infiltration / Yes treatment area (Section 10.2) Discharge Route' Groundwater Propose to install: Secondary Treatment System and soil polishing filter aEl I nd discharge to: Ground Water Invert level of the trench/bed gravel or drip tubing (m) 0.60 Site Specific Conditions (e.g. special works, site improvement works testing etc. Mechanical aeration system and a raised mound soil polishing filter measuring 1.0m in height to be installed and constructed to EPA 2021 specifications. The raised mound is required due to the high clay content in the subsoil. The raised mound shall be made up of the insitu topsoil. I recommend 60m of percolation trench in the soil polishing filter consisting of 6 lengths of trench each measuring 10m. The invert of the percolation trenches should be at 0.6m with 0.9m pervious unsaturated soil below to ensure proper polishing of the final effluent. The raised percolation area shall measure 13m x 13m and may be landscaped into the contours of the site. Ensure that the final effluent from the mechanical aeration system is distributed evenly to each of the six percolation trenches. It is important to ensure that the percolation trenches and related pipe work are put in at the correct slope. A surface water drain measuring 1 m deep shall be employed (min 2m away) up -slope from the raised mound soil polishing filter to divert surface water away from the percolation area and to prevent the water table rising in wet weather. NOTE: It is very important to ensure that the aeration pump remains on at all times on the mechanical aeration system or otherwise the system will revert to septic conditions causing odors and poorer quality effluent which may lead to clogging of the percolation trenches. 'A discharge of sewage effluent to "waters" (definition includes any or any part of any river, stream, lake, canal, reservoir, aquifer, pond, watercourse or other inland waters, whether natural or artificial) will require a licence under the Water Pollution Acts 1977-90. Refer to Section 2.4. QUALITY ASSURANCE: Installation & Commissioning System to be signed off by a suitably qualified person and recommendations in section 5.0 to be adhered to. Package treatment system must conform to EN 12566-3 standard. Package treatment system to be properly installed and certified by company supplying the system in accordance with the EPA 2021 code of practice. Keep records of desludging for five years. On -going Maintenance Desludge tank as recommended by manufacturer and periodically inspect the system for damage or surface ponding. Maintenance contract to be agreed by company supplying the package treatment system and contract must be adhered to so as to ensure that the system continues to function properly. Company: rBiolabs 1 Prefix: Mr 0 First Name: Michael Surname: Holohan Address: ITERERA, SCOTSTOWN, CO. MONAGHAN Qualifications/Experience: GSI / EPA CERTIFIED Date of Report: 12 -Jun -2026 Phone: P 0868169162 E-mail biolabsirl@outlook.com Indemnity Insurance Number: _ RPl-IE000946-00I Signature:___— e 1 1TE VULNERABILITY LOW 3T6 BEDROCK DMSSL WELLS AND BOREHOLES ADJACENT TO THE SITE Public Supply Source Protection Areas SI-Inner Protection Area SO -Outer Protection Area SOURCE PROTECTION DATA (N/A) o RIVERS AND LAKES . S'TE AQUIFER CATEGORY Lm • T' 1p-• II _l r --j , / i 1. V - L / 1 � t 1 I:�. /[;l ', -. i' �,• t ' t' '•. of llh��i I • •1335 AAF3 'f • P. • X11, Zvi A ,1 r -, - .-.-••% (11,rj- I- - / — 1 •I •?` ^ •^ 'te ' -- - ' •-.-•—•: LLI ` '� 1 9 D - •. •••'•\__ • ,. -• - Ayr,. ! .� I t ' — �� �i- 12( 'C :7k' Il f _ / 1O 1\ ii ke1 / i,' �t r brut iI_ \ "1A) I ' S ::'- LT I AERIAL VIEW OF PERCOLATION SITE SKETCH OF PERCOLATION AREA INCLUDISITE SURROUNDS 4k { • rte. `� - � r�f ��'�•. �, ids Y�"a - n' } 'fin y sw7:F.C � yy � �a� s�yi �s��y s-. q,� Jbi � 4• n � x, f 1 �4a1 Pic: ��W' � ¢ n��� i '�y, i � ., n rMyq.,. � r b ' �.. R",:Ildi°. �i�:r '..'. e.. � L•,izatii�'_FiS��'`.�7$'t; ,*'�:�:9� ,.�-xtiW.. y'.. . , a - ... , t.:+ . -•,cam wti r -. VIEWS OF PERCOLATION SITE '•.' r.1.:: ,fit t I it I ti�P,' eft` - r .rI. is 4j� tlf, f% t 5 .t ti L - JUL TRIAL HOLE ON DAY OF EXCAVATION J (A TRIAL HOLE TWO DAYS AFTER EXCAVATION , y► as `�'� T3 T TEST HOLES r. -. I P'te' 4 r d 'fir ` �441Y ;I T2 P1 P2 Ua P TEST HOLES OUTLINE SPECIFICATIONS FOR MOUNDED SOIL POLISHING FILTER 1. Treated effluent from the mechanical aeration sump unit shall be pumped intermittently or fed by gravity if the levels allow to the distribution chamber on the mound feeding the 6 percolation trenches. The raised mound shall be 1.0m in height throughout its area and consist of the topsoil from the site. The mound shall measure 13m x 13m. 2. The slope of the percolation trenches from the distribution chamber shall be 1 in 200 3. The length of each of the 6 percolation trenches shall be 10m. Total length 60m. 4. The separation distance between the percolation trenches shall be 2m (ie 2.5m centre to centre) 5. Percolation pipes shall be 100mm diameter smooth wall uPVC sewer pipes, perforated at 4, 6 and 8 o'clock. Perforations shall be 8mm diameter, at 75mm centre's along the pipe. Holes shall be checked before installation to ensure they are free from debris. 6. The width of each percolation trench shall be 500mm. 7. The depth of each percolation trench shall be 600mm below the mound surface. 8. Percolation pipes shall be laid on a 250mm bed of washed gravel, having particles in the range of 8 - 32mm. 9. Pipe surround shall be washed gravel, having particle size in the range 8 - 32mm. 10. Pipe cover shall be 150mm depth of washed gravel, having particle size in the range of 8 - 32mm. 11. Geotextile layer to be placed on top of this followed by 100mm topsoil to top of mound. 12. Geotextile shall be in accordance with EN ISO 10319. Access / inspection points and vents shall be provided for the ends of the percolation pipes. Covers shall be visible and installed to prevent the ingress of water. They shall be suitable for rodding and scouring purposes. 13. A surface land drain 1m deep shall be employed upslope of the raised mound soil polishing filter and not closer than 2m to divert surface water away from it and stop the water table rising in wet weather. SCHEDULE OF SITE SEPARATION DISTANCES PACKAGE TREATMENT SYSTEM . Minimum distance to any dwelling = 7m . Minimum distance to site boundary = 3m . Minimum distance to trees = 3m . Minimum distance to roads = 4m . Minimum distance to slope breaks = 10m . Minimum distance to watercourse / streams = 10m . Minimum distance to soakaway = 10m . Minimum distance to open drain = 10m . Minimum distance to lake or foreshore = 50m 6.3 EPA Code of Practice 2021 POLISHING FILTER Minimum distance to any dwelling = 10m . Minimum distance to site boundary = 3m . Minimum distance to trees = 3m . Minimum distance to roads = 4m . Minimum distance to slope breaks = 10m . Minimum distance to water course / stream =10m . Minimum distance to soakaway =10m . Minimum distance to open drain = 10m . Minimum distance to lake or foreshore = 50m . Minimum distance to up gradient well = 15m . Minimum distance well on same level = 30m . Minimum distance to down gradient well = 40m ble 6.31 EPA Code of Practice 2021 unless stated otherwise GEOTEXTILE LAYER TOPSOIL 100MM 150MM WASHED STONE ABOVE PIPE O 100MM PIPE 250MM WASHED STONE BELOW PIPE SUITABLE SUBSOIL MINIMUM 0.9M Water table EACH TRENCH 500MM WIDE 0.6M INVERT OF TRENCH MOUNDED TOPSOIL 1.0M GROUND LEVEL SECTION THROUGH MOUNDED SUBSOIL PERCOLATION SYSTEM