PLANNING AND DEVELOPMENT ACT 2000 (as amended)
Chief Executive's Order No
Reference Number
Name of Applicant
Address:
P786-26
25/60502
GEDA Construction Company Ltd.
Kieran O'Reilly
Monaghan Road
Castleblayney
Co. Monaghan
A75 EP84
Nature of Application: Permission for development including the demolition of 1 No. existing
bungalow and the provision of 30 No. dwellings comprising of: 8 No. 2
bed semi-detached bungalow dwellings 10 No. 2 bed semi-detached
two -storey dwellings 8 No. 3 bed semi-detached two -storey dwellings
2 No. 4 bed semi-detached two -storey dwellings 2 No. 4 bed detached
two -storey dwellings together with all boundary treatments, hard and
soft landscaping, public lighting, new estate road, connection to the
existing mains services and all ancillary and associated site works.
Location of Development
ORDER:
Scarnageeragh (or Emyvale)
Emyvale
Co. Monaghan
I hereby decide, pursuant to the provisions of the Planning and Development Act 2000 (as amended)
and the Planning and Development Regulations 2001 (as amended) to grant permission for the above
development in accordance with documents submitted, subject to the 19 condition(s) set out in the
Schedule attached hereto.
I further decide that PERMISSION be granted subject to the same conditions on the expiration of the
period for the taking of an appeal to An Coimisiun Pleanala against this decision if there is then no
appeal before An Coimisiun Pleanala.
Adrian Hughes
SENIOR PLANNER
Uc-r • v� - 2-6
Date
25/60502 GEDA Construction Company Ltd.,
Scarnageeragh (or Emyvale), Emyvale, Co. Monaghan
1
a) The dwellings hereby permitted shall only be for the purposes of the provision of social housing as
defined by Section 3.12 Social Housing in Chapter 3 of the Monaghan County Development Plan
2025-2031.
b) Prior to commencement of development, the applicant, developer, or any person with an interest in
the land shall enter into an agreement with the Planning Authority, pursuant to Section 47 of the
Planning and Development Act 2000 (as amended), that restricts all residential units permitted to
first occupation by those eligible for the provision of social housing, and to first occupation to those
not being a corporate entity, unless otherwise agreed in writing.
c) No dwelling hereby permitted shall be disposed of or sold off without the prior written agreement
of the planning authority.
Reason: To restrict the housing development to use by persons of a particular class or description in
order to ensure an adequate choice and supply of housing, including social housing, in the common
good.
2.
a) The developer shall pay to Monaghan County Council, or as otherwise agreed, a sum of €30,600.00
in accordance with the General Development Contribution Scheme 2021-2026 (as revised) made by
the Council under Section 48 of the Planning and Development Act 2000 (as amended), towards
expenditure incurred or proposed to be incurred by the Council in the provision of public roads,
public footpaths/cycle paths and public lighting that will facilitate the proposed development. The
amount of contribution to be paid may be reduced / waived in respect of the provision of social
housing units within the development scheme.
b) The sum attached to this condition shall be revised from the date of the grant of planning permission
to the value pertaining at the time of payment in accordance with the Wholesale Price Index for
Building and Construction (Materials and Wages).
c) No works shall commence until payment of the development contribution is made in full, or until
Monaghan County Council has agreed in writing to a schedule of phased payments of the sum.
Reason: It is considered appropriate that the developer should contribute towards the expenditure
incurred or proposed to be incurred by the Council in the provision of public roads, public
footpaths/cycle paths and public lighting that will facilitate the proposed development.
R
a) The developer shall pay to Monaghan County Council, or as otherwise agreed, a sum of €58,200.00
in accordance with the General Development Contribution Scheme 2021-2026 (as revised) made by
the Council under Section 48 of the Planning and Development Act 2000 (as amended), towards
expenditure incurred or proposed to be incurred by the Council in the provision of community,
recreation and amenity public infrastructure and facilities in the area. The amount of contribution to
be paid may be reduced / waived in respect of the provision of social housing units within the
development scheme.
b) The sum attached to this condition shall be revised from the date of the grant of planning permission
to the value pertaining at the time of payment in accordance with the Wholesale Price Index for
Building and Construction (Materials and Wages).
c) No works shall commence until payment of the development contribution is made in full, or until
Monaghan County Council has agreed in writing to a schedule of phased payments of the sum.
Reason: It is considered appropriate that the developer should contribute towards the expenditure
incurred or proposed to be incurred by the Council in the provision of community, recreation and
amenity infrastructure and facilities in the area.
4. Prior to commencement of development, a security by way of a cash deposit in the sum of €210,000.00
(index linked) or as otherwise agreed in writing with the Planning Authority, shall be given to the Planning
Authority by the developer to ensure satisfactory completion of all roads, footpaths, services, surface
water drainage and boundary work and open space in the development in accordance with the lodged
plans. The bond shall remain in full force for a minimum period of two years following the expiration of
the planning permission; but ultimately not until the development has been completed to the
satisfaction of the Planning Authority in accordance with the approved details and has been Taken in
Charge by Monaghan County Council.
Reason: To ensure the proper planning and sustainable development of the area.
5
a) Prior to any other works commencing, visibility splays of 45m, measured to the nearside road edge
in each direction, shall be provided from a point in the centre of the laneway 2.4m from the public
road edge at a height of between 1.05m and 2m above ground level to an object height of between
1.05m and 2m above ground level in both directions. The visibility splays shall be retained and kept
clear from obstructions thereafter.
b) Where it is necessary to remove hedges, fences, embankments or other obstructions in order to
achieve the required visibility splays, they shall be reinstated behind the visibility splays. Any new
trees or shrubs shall be planted back from the visibility splays to allow for future growth and some
species will require additional set back. All existing planting shall be kept trimmed behind visibility
splays.
c) The new entrance shall form a bellmouth of 6m radius with edge of new boundary. Recessed
entrance shall be of sufficient dimensions to contain a stationary vehicle off the public road. Entrance
gates shall open inwards only.
d) No development exempt or otherwise shall be erected over the public sewer, drain or water -main,
unless otherwise agreed in writing with the Planning Authority.
e) Prior to and during construction any pumping of groundwater, surface water or any other potentially
polluting discharges of any other effluent, under the relevant Water Pollution Acts, the applicant is
obliged to apply for a licence from the Local Authority.
f) All surface water management/SUDs works to comply with Monaghan County Council Technical
guidance document (WSTGD 2008) and Monaghan County Council Storm Water Technical Guidance
Document 2017.
g) Where work is proposed in the public roadway, consent and a relevant road opening licence shall be
obtained from the Local Authority. All proposed works shall be carried out in accordance with
Guidelines for Managing Openings in Public Roads Second Edition (Rev 1) April 2017.
h) Provision shall be made within the site for surface water drainage and no surface water shall be
allowed flow onto the public roadway. The discharge of surface water from the public road onto the
site through road surface drainage and road subsoil drainage to remain unimpeded.
i) Unless otherwise agreed in writing with the Planning Authority, the footpath section to the south
side of Market House Lane shall be completed and available for public use prior to occupation of any
dwelling.
j) Before any work is commenced on this development a security, by way of a cash deposit, in the sum
of €2250, shall be paid to the planning authority by the developer to ensure the satisfactory
completion of all surface water drainage/boundary work within and abutting the site area, to prevent
runoff of surface water onto the public roadway and to ensure that no damage is caused to public
roadway and any such damage is repaired satisfactorily. Failure to carry out all entrance works to a
standard to the satisfaction of the planning authority will result in forfeiture of part or all of the cash
security.
Reason: In the interest of traffic/road safety.
6. Prior to the release of the bond as required under condition 3 above, the developer shall agree details
relating to the private management of the housing development specifically in relation to ongoing
maintenance of the roads, services and open spaces in the period prior to the taking in charge of the
development by the local authority.
Reason: To ensure the proper planning and sustainable development of the area.
7. No development shall take place until a written legal agreement in compliance with the requirements of
Part V (Social and Affordable Housing) of the Planning and Development Act, 2000, as amended by the
Planning and Development (Amendment) Act, 2002, has been made between the developer and the
Planning Authority, relating to the provision of social housing, in accordance with the Monaghan County
Council Housing Strategy and section 15.8.10 of the Monaghan County Development Plan 2025-2031.
Reason: In the interest of proper planning and sustainable development
8.
a) One month prior to commencement of development, the applicant shall submit to the Planning
Authority, Monaghan County Council, for approval:
i. A revised site -specific Construction and Demolition Plan and By -Products Management Plan
for the proposed development works shall be provided using "Best Practice Guidelines for
the preparation of resource & waste management plans for construction and demolition
projects" — EPA, 2021.
ii. An Asbestos survey and removal plan for the proposed development works.
b) Within one month after completion of the drainage system, the developer shall submit to the
planning authority, a surface water drainage plan and CCTV survey detailing how the surface water
drainage system will be maintained post development stage, and details of the responsible persons.
c) Any construction and demolition waste or excess soil generated during the construction phase which
cannot be reused on site in accordance with Section 3 (1)(c) and Section 39 (1) of the Waste
Management Act 1996 as amended, shall be disposed/recovered at an appropriately permitted
facility in accordance with the requirements of the Waste Management Act 1996 as amended using
authorised waste collectors authorised to collect the type of material for disposal/recovery at
authorised treatment facilities.
d) The development shall be carried out in accordance with the agreed surface water drainage plan and
the Construction and Demolition and By -Products Waste Management Plan.
Reason: In the interests of environmental protection and to ensure that the development is carried
out in an orderly and planned manner.
a) In the event that infilling is required to be imported onsite the developer shall conform to one of the
following;
i. If utilising EPA Article 27 notification to move soil infill material from one site to another,
official correspondence from the EPA granting approval shall be submitted to the Planning
Authority prior to commencement of development, or:
ii. If using waste material as infill, a valid permit must be issued by Monaghan County Council
in accordance with the Waste Management (Facility Permit and Registration) Regulations
2007 as amended prior to acceptance of material.
b) Facilities shall be provided for the collection and segregation of recyclable waste. Wastes shall be
collected for recycling/reuse whenever feasible or otherwise disposed of in accordance with the
Waste Management Act 1996 as amended.
c) The developer shall ensure that adequate measures and precautions are in place forthe construction
phase to ensure there is no discharge of polluting matter/sediment laden waters discharging from
the site to any watercourse. These measures shall take account of the Guidance produced by Inland
Fisheries Ireland titled "Requirements for the Protection of Fisheries Habitat during Construction and
Development Works at River Sites", available to download at
https://www fisheriesireland ie/documents/624-guidelines-on-protection-of-fisheries-during-
construction-works-in-and-adlacent-to-waters/file.html
d) Monaghan County Council and Inland Fisheries Ireland shall be informed promptly of an accidental
spillage of sediment laden waters, fuel, machine oil or any polluting discharge which may threaten
the quality of any watercourse or groundwater body.
e) Any fuels, oils, greases, hazardous liquid wastes and hydraulic fluids within the site area shall be
stored on site, away from any watercourses in a bunded, leak -proof, and lockable storage area. Note
that bunds are to be designed to contain 110% of the capacity of the largest storage container
located within the bund. There shall be no overflow drain facility from any bunds on site and all filling
and off -take points shall be located within a bund.
f) Material storage, fuel handling, parking areas and other yard activities shall be managed in a manner
which prevents the discharge of polluting matter to ground or surface water.
g) All storm water arising from the proposed development shall discharge to an appropriately sized and
suitable class 1 interceptor prior to discharge. The interceptor shall be provided with appropriate
warning device to indicate when required levels for maintenance have been reached and should be
fitted with a sampling chamber, which has easy access. An inspection manhole shall be installed on
the outflow pipe from the oil interceptors.
h) The fuel/Oil interceptor shall be serviced regularly, maintained, and installed as per manufactures
recommendations to prevent any discharge of pollutants to ground or surface waters. Maintenance
records shall be kept by the developer.
i) Any sludges/silt/solid wastes arising from the desludging of silt/grit traps, interceptor, the
attenuation system shall be collected by a suitably permitted collector in accordance with the Waste
Management Act, 1996 as amended.
Reason: In the interests of environmental protection and to ensure that the development is carried
out in an orderly and planned manner.
10. All amenity/open spaces, roads, footpaths, and public lighting services shall be completed in accordance
with the standards and conditions set out in the Departmental publication Recommendations for Site
Development Works for Housing Areas, except where superseded by the Council's Taking in Charge Policy
(2010), and Storm Water Technical Guidance Document 2017.
Reason: In the interest of orderly development.
11.
a) Prior to the occupation of the dwelling units hereby granted, the recommendations of the Road
Safety Audit, submitted to the Planning Authority on 09th July 2026 and in so far as they relate to
land within the application red line site area and/or lands under the control of the developer, shall
be complied with in full, unless otherwise agreed in writing with the Planning Authority
b) Within one month of completion of the development hereby granted, the developer shall carry out
a Stage 3 Road Safety Audit and submit this and details of any remediation measures to the Planning
Authority for agreement in writing
c) The development shall be carried out in accordance with these agreed details.
Reason: In the interests of traffic safety.
12.
a) Prior to the commencement of development, the developer shall submit to the Planning Authority
for agreement in writing, a Traffic Management Plan (TMP) for the duration of the construction
period.
b) No work shall be carried out on the development hereby permitted until the developer receives
written agreement from the Planning Authority in respect of the TMP.
c) The TMP shall be implemented in accordance with details agreed in writing with the Planning
Authority.
d) The contractor will be required to provide wheel washing facilities, and any other necessary
measures to remove mud and organic material from vehicles exiting site. In addition, the cleaning of
delivery trucks such as concrete delivery trucks shall be carried out within the new site development
and not in the existing residential area.
e) The contractor shall carry out road sweeping operations to remove any project related dirt and
material deposited on any length of the road network by construction / delivery vehicles. Road
Sweepers shall dispose of material following sweeping of road network, to a licensed waste facility.
f) Loads of materials leaving each site will be evaluated and covered if considered necessary to
minimise potential dust impacts during transportation and the transportation contractor shall take
all reasonable measures while transporting waste or any other materials likely to cause fugitive loses
from a vehicle during transportation to and from site, including but not limited to, covering of all
waste or material with suitably secured tarpaulin/ covers to prevent loss and utilisation of enclosed
units to prevent loss.
Reason: In the interests of Road Safety
13
a) No development exempt or otherwise shall be erected over the public sewer, drain or water -main,
unless otherwise agreed in writing with the planning authority.
b) Prior to and during construction any pumping of groundwater, surface water or any other potentially
polluting discharges of any other effluent, under the relevant Water Pollution Acts, the developer
shall apply for a licence from the Local Authority.
c) All surface water management/SUDs works shall comply with Monaghan County Council Technical
guidance document (WSTGD 2008) and Monaghan County Council Storm Water Technical Guidance
Document 2017.
d) Where work is to be carried out in the public roadway, consent and relevant road opening licence
shall be obtained from the Local Authority. All works carried out by the developer shall all be in
accordance with Guidelines for Managing Openings in Public Roads Second Edition (Rev 1) April 2017.
e) Provision shall be made within the site for surface water drainage and no surface water shall be
allowed flow onto the public roadway. The discharge of surface water from the public road onto the
site through road surface drainage and road subsoil drainage shall remain unimpeded.
f) The line of any new fence or wall shall be positioned behind the visibility splays. Any new trees or
shrubs to planted back from the visibility splays to allow for future growth and some species will
require additional set back. All planting must be kept trimmed and must not impede on the visibility
splays. Where a timber post and rail fence is erected along road boundary, the timber rails to be
placed on the site side of posts, in the interest of road safety. The developer shall confirm that the
existing hedge within boundary shall be cut back and maintained in order to achieve the required
sight lines described above.
g) Prior to any commencement of works on this development a security, by way of a cash deposit, in
the sum of €2,250 shall be paid to the planning authority by the developer to ensure the satisfactory
completion of all surface water drainage/boundary work within and abutting the site area, to prevent
runoff of surface water onto the public roadway and to ensure that no damage is caused to public
roadway and any such damage is repaired satisfactorily. Failure to carry out all entrance works to a
standard to the satisfaction of the planning authority will result in forfeiture of part or all the cash
security.
Reason: In the interests of road/traffic safety and securing a satisfactory standard of development.
14. Proposed external wall finishes shall be as indicated on the submitted drawings unless otherwise agreed
in writing with the Planning Authority.
Reason: In the interest of visual amenity.
15.
a) All construction and/or demolition activity shall be restricted to the hours 08:00 to 18:00 Monday to
Friday and the hours 09:00 to 13:00 on Saturdays, unless otherwise agreed in writing with the
Planning Authority.
b) No works shall take place on Sundays, bank holidays or public holidays.
Reason: In the interests of residential amenity and to ensure that the development is carried out in an
orderly and planned manner.
16.
a) All hard and soft landscaping shall be in accordance with the submitted details.
b) All planting shall be carried out in the first planting season following commencement of building
operations and shall be permanently retained thereafter.
c) Semi -mature tree specimens (native species; including oak, sycamore and beech) shall be used. Any
plant which fails in the first planting season shall be replaced.
d) Any planted trees or shrubs removed, dying, being severely damaged and/or becoming seriously
diseased within 5 years from the completion of the scheme, shall be replaced by trees or shrubs of
similar size and species to those originally required to be planted, unless as otherwise approved in
writing by the Planning Authority.
e) The proposed formal playground facility shall be provided and be fully operational, in accordance
with the submitted details, before the occupation of any dwelling.
Reason: In the interest of visual amenity.
17.
a) All electricity, telephone, television and suchlike services shall be located underground.
b) A duct, fit to accommodate a cable of minimum 100mm diameter, shall be provided where
appropriate to allow for future broadband and suchlike connections.
Reason: In the interest of orderly development.
18. If/where applicable, prior to the occupation of the houses, proposals for (i) the housing
estate/development name, (ii) street names, (iii) house numbers and (iv) any associated signage, shall
be submitted to the Planning Authority for agreement in writing. Estate and street names shall be
displayed in bilingual format.
Reason: To ensure a satisfactory standard of development.
19. The development shall be developed in accordance with plans and documentation submitted to the
Planning Authority on the 12th December 2025, as amended on 09th July 2026 except as may otherwise
be required in order to comply with the above conditions.
Reason: In the interest of proper planning and sustainable development