HomeMy WebLinkAbout2560489 - Report Received from Internal Staff - EnvironmentENVIRONMENTAL REPORT
To Planning
From: Donna McEvoy, Environment Section
Ref: 25/60489
Agent: Michael Malone, 9 Dolphins Barn, Dolphins Barn, Dublin 8.
The following FI was received and reviewed as follows:
1) Submit contract with Uisce Eireann for public for connection to public sewer and
Doohamlet WWTP. No Contract has been submitted.
2) Details to be included in the Surface Water drainage plan which outline how the SW
drainage system will be maintained and serviced after the development has been completed
thesedetails should clearly indicate the persons responsible for this.
Details submitted are sufficient. Maintenance of these systems will be carried out by a Service
Management Company. Details related to this company and copy of contract should be
submitted prior to completion.
3) Submit a Construction & Environmental Management plan. This plan must consider
impactsand propose mitigation for air, noise, dust and surface water risks. It must also take
intoconsideration Construction and Demolition proposals and By-Products management
using“Best Practice Guidelines for the preparation of resource & waste management plans
for construction & demolition projects’. It is not clear in the application if imported infilling
material will be required for the development and details in particular regard to the source
and quantities of this material should be specified in the CEMP.
CEMP has been submitted. Measures for dust, noise and surface water management have
been included. Environment Section will inspect the site as part of C&D compliance.
If infilling material is required to be imported onsite the applicant or economic operator shall:
i) Utilise EPA By-Product Regulation 27 in moving soil infill material from one site to
another. Official correspondence demonstrating Article 27 Registration with the EPA
shall be submitted to the Planning Authority prior to commencement of development.
▪ or
i) If using waste material as infill and prior to acceptance of material a valid permit must
be issued by Monaghan County Council in accordance with the Waste Management
(Facility Permit and Registration) Regulations 2007 as amended.
▪ or
ii) Buy topsoil material as a product for final landscaping purposes only. Documentation
demonstrating purchase shall be submitted to Planning Authority
The CEMP and FI map No.1 details cut and fill. It does not detail if additional fill be be required.
If so condition ( e) below must be complied with.
Planning subject to the following conditions.
a) Submit details and copy of contractual agreement with Service Management Company
prior to completfon of development.
b) All surface water collectfon, attenuatfon and discharge systems to be maintained as
per Page 8 of further informatfon submission.
c) All aspects of the CEMP must be implemented as per FI submission.
d) If infilling material is required to be imported onsite the applicant shall conform to one
of the following;
i. Economic operator shall utflise EPA Artfcle 27 notfficatfon in moving soil infill
material from one site to another. Official correspondence from the EPA
grantfng approval shall be submitted to the Planning Authority prior to
commencement of development.
or
ii. If using waste material as infill and prior to acceptance of material a valid
permit must be issued by Monaghan County Council in accordance with the
Waste Management (Facility Permit and Registratfon) Regulatfons 2007 as
amended.
or
iii. Buy topsoil material as a product for final landscaping purposes only.
Documentatfon demonstratfng purchase shall be submitted to Planning
Authority.
a) Facilitfes shall be provided for the collectfon and segregatfon of recyclable waste.
Wastes shall be collected for recycling/reuse whenever feasible or otherwise disposed
of in accordance with the Waste Management Act 1996 as amended.
b) The developer shall ensure that adequate measures and precautfons are in place for
the constructfon phase to ensure there is no discharge of pollutfng matter/sediment
laden waters discharging from the site to any watercourse. These measures shall take
account of the Guidance produced by Inland Fisheries Ireland tftled “Requirements for
the Protection of Fisheries Habitat during Construction and Development Works at
River Sites”, available to download at https://www.fisheriesireland.ie/documents/624-
guidelines-on-protectfon-of-fisheries-during-constructfon-works-in-and-adjacent-to-
waters/file.html
c) Monaghan County Council and Inland Fisheries Ireland shall be informed promptly of
an accidental spillage of sediment laden waters, fuel, machine oil or any pollutfng
discharge which may threaten the quality of any watercourse or groundwater body.
d) Any fuels, oils, greases, hazardous liquid wastes and hydraulic fluids within the site
area shall be stored on site, away from any watercourses in a bunded, leak-proof, and
lockable storage area. Note that bunds are to be designed to contain 110% of the
capacity of the largest storage container located within the bund. There shall be no
overflow drain facility from any bunds on site and all filling and off-take points shall be
located within a bund.
e) Material storage, fuel handling, parking areas and other yard actfvitfes shall be
managed in a manner which prevents the discharge of pollutfng matter to ground or
surface water.
f) All storm water arising from the proposed development shall discharge to an
appropriately sized and suitable class 1 interceptor prior to discharge. The interceptor
shall be provided with appropriate warning device to indicate when required levels for
maintenance have been reached and should be fitted with a sampling chamber, which
has easy access. An inspectfon manhole shall be installed on the outilow pipe from the
oil interceptors.
g) Fuel/Oil interceptor shall be serviced regularly, maintained, and installed as per
manufactures recommendatfons to prevent any discharge of pollutants to ground or
surface waters. Maintenance records shall be kept by the applicant.
h) Sludge’s/silt/solid wastes arising from the desludging of silt/grit traps, interceptor, the
attenuatfon system shall be collected by a suitably permitted collector in accordance
with the Waste Management Act, 1996 as amended.
Prepared By: Date: 10/08/2026
A/Exec Scientist
Approved Date: 10/08/2026
Senior Exec Engineer.