Loading...
HomeMy WebLinkAbout2560432 - F.I. Received Doc. - CSPringle repsone ARCHITECTS | CONSULTING ENGINEERS | BUILDING SURVEYORS Tel: 042-9746492 info@cspringle.com www.cspringle.com MNK Engineering T/A CS Pringle Incorporated in Ireland: Reg No 640491 Registered Office: Main Street Castleblayney, Co. Monaghan. Page 1 of 1 Our Ref: CSP/KOR/QR/00322 Date: 4th August 2026 Response to submission from Inland Fisheries Ireland Storm Water Management The steep nature of the site means that many of the nature-based solutions envisaged for storm water management are not open to us or are not practical. For example permeable pavements and retention basins have limited effectiveness when gradients are being pushed to the limit. We have however implemented 2 small swales along the entrance road and permeable paving for each driveway. We have also implemented attenuation in line with GDSDS policies such as an interception volume which replicates greenfield sites by ensuring that small rainfall events (<5mm) do not result in runoff and a treatment volume being stored whereby the base of the tank allows percolation into the ground to ensure that the first flush runoff from the site is intercepted and treated naturally. Prior to entry to the attenuation tank the surface water is put through a petrol interceptor/separator. River regime protection is ensured by limiting the level of runoff from the site to that which could be expected from a greenfield flow of similar return period. However, in addition to this the outflow from the site is limited to Qbar which is effectively a storm of 2.35 years even for events of up to 1:100 with a 1.2 multiplier incorporated to account for climate change. Surface Water Management During Construction Phase I direct you to the Construction Environmental Management plan and Surface and groundwater Management plan submitted in this Further Information Response. Wastewater management Due to the existing Monaghan Wastewater Treatment Plant being under stress and having limited capacity, the developments wastewater will discharge to an on-site Wastewater Treatment Plant that provides an appropriate pretreatment of 10mg/l BOD, 10mg/l SS and 1mg/l Ammonia prior to discharging to the Uisce Eireann network. Uisce Eireann have requested such through their Confirmation of Feasibility. RECEIVED: 12/08/2026