Loading...
HomeMy WebLinkAbout2660122 - F.I. Received Doc. - Construction & Environmental Management planGRAY CONSTRUCTION & DESIGN LTD Cornacreeve Dunraymond Co. Monaghan T : 047 85081 M: 086 0298424 E: grayconstructionanddesign@gmail .com CONSTRUCTION & ENVIRONMENTAL MANAGEMENT PLAN Proposed Replacement Dwelling @ Doagheys, Glaslough, Co. Monaghan Prepared in support of Planning Application Ref. 26/60122 Applicant: Michael & Margaret Wallace Prepared by: Christopher Gray 1. Introduction This Construction and Environmental Management Plan (CEMP) has been prepared in response to Item 5(b) of the Further Information Request issued by Monaghan County Council. The document sets out the environmental protection measures which will be implemented during demolition and construction of the proposed replacement dwelling and detached domestic garage. The plan has been prepared having regard to: • EPA Best Practice Guidelines for the Preparation of Resource & Waste Management Plans for Construction & Demolition Projects (2021) • Waste Management Act 1996 (as amended) • Waste Directive Regulations • Planning and Development Acts • Safety Health & Welfare at Work (Construction) Regulations • Environmental Protection Agency Code of Practice for Domestic Waste Water Treatment Systems (2021) where relevant. Reference should be made to the Site Drainage Plan and Water Protection Checklist for the proposed development. 2. Description of Development The proposed development comprises: • demolition of the existing two-storey dwelling; • demolition of existing domestic outbuildings outlined in the proposed site layout; • construction of a replacement two-storey dwelling having a floor area of approximately 192m²; • construction of a detached domestic garage; • improvements to the existing entrance and visibility splays; • associated drainage and site development works; • landscaping and boundary treatments. The existing agricultural entrance will remain unchanged. The existing septic tank is proposed to remain in service, subject to the outcome of the structural assessment requested separately by the Planning Authority. No works are proposed to the existing septic tank as part of the construction phase unless required following that assessment. RECEIVED: 12/08/2026 GRAY CONSTRUCTION & DESIGN LTD Cornacreeve Dunraymond Co. Monaghan T : 047 85081 M: 086 0298424 E: grayconstructionanddesign@gmail .com 3. Environmental Objectives The objectives of this CEMP are to: • protect surface water and groundwater; • minimise waste generation; • maximise reuse and recycling; • prevent pollution; • minimise nuisance to adjoining landowners; • protect the existing agricultural enterprise; • comply with EPA Best Practice Guidance. 4. Site Management The applicant shall be responsible for environmental compliance. It is the applicant's responsibility to ensure: • implementation of this CEMP; • environmental inspections; • pollution prevention; • waste documentation; • maintenance of site records. 5. Construction Sequence Construction will generally proceed in the following order: 1. Site fencing. 2. Protection of retained trees. 3. Establishment of construction compound. 4. Isolation of services. 5. Asbestos removal (if identified). 6. Demolition of dwelling. 7. Demolition of outbuildings. 8. Removal and segregation of demolition materials. 9. Excavation. 10. Foundations. 11. Superstructure. 12. Roofing. 13. Internal works. 14. Garage construction. 15. External works. 16. Landscaping. 17. Final reinstatement. 6. Demolition Management Demolition works shall be undertaken in a controlled manner. Materials suitable for reuse shall be retained where practicable. Dust suppression measures shall be employed throughout demolition. The contractor shall ensure no debris leaves the site. No demolition waste shall be burned on site. RECEIVED: 12/08/2026 GRAY CONSTRUCTION & DESIGN LTD Cornacreeve Dunraymond Co. Monaghan T : 047 85081 M: 086 0298424 E: grayconstructionanddesign@gmail .com 7. Construction & Demolition Resource Management The project shall follow the EPA Waste Hierarchy: • Prevention • Reduction • Reuse • Recycling • Recovery • Disposal 7.1. Expected Materials Material Proposed Management Concrete Crushed for reuse where suitable or recycled Stone Reused on site where practical Brick Reused or recycled Timber Segregated for reuse/recycling Steel Sent to licensed metal recycler Slates Reused where suitable or recycled Glass Recycled Plastic Recycled Mixed construction waste Authorised recovery facility 7.2. Construction Waste Construction materials will be ordered to minimise surplus and packaging shall be returned to suppliers where possible. Separate skips shall be provided for: • timber • metals • plastics • cardboard • mixed recyclables • residual waste. Only authorised waste contractors shall remove waste from site. Waste transfer documentation shall be retained. 8. By-Products Management Excavated topsoil shall be retained for landscaping. Subsoil suitable for reuse shall remain within the site wherever practicable. Should surplus uncontaminated soil require removal from site, it shall be managed in accordance with Article 27 of the Waste Directive Regulations and EPA guidance relating to by-products. Only material incapable of lawful reuse shall be treated as waste. 9. Water Protection No contaminated water shall enter roadside drains. Measures shall include: RECEIVED: 12/08/2026 GRAY CONSTRUCTION & DESIGN LTD Cornacreeve Dunraymond Co. Monaghan T : 047 85081 M: 086 0298424 E: grayconstructionanddesign@gmail .com • silt trap as detailed in the Water Protection Checklist and site drainage plan; • temporary sediment control; • prevention of concrete washout; • no discharge of cement washings; • wheel cleaning if necessary; • stabilisation of exposed soils. • No wash water shall enter drains. 10. Protection of Existing Septic Tank The existing septic tank is to remain operational throughout construction. The following precautions shall be implemented: • construction traffic shall avoid the septic tank and associated pipework; • no storage of building materials over the septic tank; • no excavation adjacent to the tank unless required; • no fuel, cement washings or contaminants shall enter the tank; • the percolation area shall be protected from compaction by heavy machinery. 11. Fuel Storage Fuel shall be: • stored in bunded containers; • located away from drainage routes; • protected from accidental damage. Spill kits shall be available at all times. Refuelling shall take place in a designated location. 12. Dust Control Dust shall be controlled by: • water suppression during demolition; • damping down stockpiles; • covered skips; • covered lorries; • cleaning of public roads where necessary; • minimising exposed surfaces. 13. Noise Control Working hours shall generally be: • Monday to Friday 08:00–18:00 • Saturday 08:00–14:00 No routine Sunday working. Plant shall be maintained in good condition and engines shall not be left idling unnecessarily. RECEIVED: 12/08/2026 GRAY CONSTRUCTION & DESIGN LTD Cornacreeve Dunraymond Co. Monaghan T : 047 85081 M: 086 0298424 E: grayconstructionanddesign@gmail .com 14. Traffic Management Construction deliveries shall be planned to minimise disruption. Public roads shall be kept clean. Mud shall be removed immediately if deposited. Construction vehicles shall avoid unnecessary reversing on the public road. Existing agricultural access shall remain available throughout construction. 15. Protection of the Adjacent Farmyard The proposed dwelling is located adjacent to an operational agricultural yard. Construction activities shall ensure: • unrestricted access to agricultural buildings; • no obstruction of farm machinery movements; • separation of construction traffic from farming operations where practical; • maintenance of the proposed boundary wall during construction; • secure fencing around construction areas. The contractor shall liaise with the landowner where activities could temporarily affect agricultural operations. This reflects the adjacent farmyard arrangement acknowledged in the planning documentation. 16. Tree and Vegetation Protection Existing trees identified for retention shall be protected. No storage of materials shall occur within root protection areas. Native hedgerow planting shall be completed in accordance with the approved landscaping proposals. 17. Asbestos Management Prior to demolition an asbestos survey shall be completed. Should asbestos containing materials be identified: • removal shall be undertaken by an authorised asbestos contractor; • works shall comply with all Health and Safety Authority requirements; • asbestos shall be transported by a licensed waste carrier; • disposal shall take place at an authorised hazardous waste facility; • all waste transfer documentation shall be retained. No asbestos materials shall be broken, buried or disposed of on site. 18. Emergency Procedures The contractor shall maintain: • spill kits; • fire extinguishers; • emergency contact numbers. Any pollution incident shall be immediately contained and reported to the Site Manager. 19. Environmental Monitoring The Site Manager shall undertake routine inspections covering: • waste segregation; • pollution prevention; • dust; RECEIVED: 12/08/2026 GRAY CONSTRUCTION & DESIGN LTD Cornacreeve Dunraymond Co. Monaghan T : 047 85081 M: 086 0298424 E: grayconstructionanddesign@gmail .com • noise; • fuel storage; • housekeeping; • protection of the existing septic tank; • protection of adjoining agricultural operations. Corrective action shall be taken immediately where deficiencies are identified. 20. Conclusion This Construction and Environmental Management Plan demonstrates that the demolition of the existing dwellin g and outbuildings and the construction of the proposed replacement dwelling and detached garage can be undertaken without significant adverse environmental effects. The proposed works will be carried out in accordance with the principles of the EPA Best Practice Guidelines for the Preparation of Resource & Waste Management Plans for Construction & Demolition Projects (2021). Waste generation will be minimised through careful procurement, segregation and reuse of materials where practicable, with all remaining waste managed by authorised waste contractors. Surface water, groundwater, the existing septic tank, neighbouring lands and the adjoining agricultural enterprise will be protected throughout the construction period through the implementation of the measures contained within this CEMP. ___________________________ Christopher Gray B.Sc (Hons) Const. Eng & Management. Dip. Ind.on RECEIVED: 12/08/2026