HomeMy WebLinkAbout2660002 - Final Grant
14/08/2026
To: Dervla McKenna
C/O Paul McGuigan
6 Plantation Terrace
Monaghan
Co.Monaghan
H18RP49
File Number - 26/60002
Planning and Development Act 2000 (as amended)
NOTIFICATION OF FINAL GRANT
Monaghan County Council has by order dated 10/07/2026 granted the above named, for
the development of land namely for:- permission to apply to the above named authority
for planning permission to retain and complete a detached domestic garage with ancillary
equine accommodation and all associated works , at Killyvane, Monaghan, Co.Monaghan,
subject to the 7 condition(s) set out in the Schedule attached.
Signed on behalf of MONAGHAN COUNTY COUNCIL.
__________________________
ADMINISTRATIVE OFFICER
__________________________
DATE
I refer you to the Health and Safety Authority website www.hsa.ie for new responsibilities
for homeowners under Safety, Health and Welfare at Work (Construction) Regulations
2013.
pp
14 / 08 / 2026
26/60002 Dervla McKenna, Killyvane, Monaghan, Co.Monaghan
1.
a) The developer shall pay to Monaghan County Council a sum of €2712.00 in accordance with
the General Development Contribution Scheme 2021-2026 made by the Council under
Section 48 of the Planning and Development Act 2000 (as amended), towards expenditure
incurred or proposed to be incurred by the Council in the provision of community, recreation
and amenity public infrastructure and facilities in the area.
b) The sum attached to this condition shall be revised from the date of the grant of planning
permission to the value pertaining at the time of payment in accordance with the Wholesale
Price Index for Building and Construction (Materials and Wages).
c) The development contribution shall be paid in full within six months from the date of the final
grant of permission or as otherwise agreed in writing.
Reason: It is considered appropriate that the developer should contribute towards the
expenditure incurred or proposed to be incurred by the Council in the provision of community,
recreation and amenity infrastructure and facilities in the area.
2.
a) The development/facility shall be operated in accordance with the European Union (Good
Agricultural Practice for Protection of Waters) Regulations 2025.
b) The development hereby approved will comply with the following drainage arrangements;
(i) Contaminated surface water run-off shall be disposed of directly in a sealed system.
(ii) All soiled waters shall be directed to a storage tank.
(iii) No effluent or slurry shall discharge or be allowed to discharge to any stream, river,
watercourse, groundwater body or to the public road.
(iv) All uncontaminated roof water from buildings and yard water shall be separately collected
and discharged in a sealed system to existing drains, streams or adequate soakpits and
shall not discharge or be allowed to discharge to the foul effluent drains, foul effluent and
slurry storage tanks or to the public road.
c) All organic fertiliser generated by the development hereby approved and existing
development within the farmyard shall be conveyed through properly constructed channels to
the proposed and existing storage facilities and shall not discharge or be allowed to discharge
to any stream, river, watercourse, groundwater body or public road.
d) All organic fertiliser generated by the proposed development shall be utilised in accordance
with the details submitted to the Planning Authority and in accordance with the European
Union (Good Agricultural Practice for Protection of Waters) Regulations 2025.
Reason: In the interest of environmental protection and public health.
3.
a) All waste oils and any other hazardous waste materials shall be stored appropriately and
collected, recovered, or disposed of in accordance with the Waste Management Act 1996 as
amended, and records of such shall be kept on site.
(i) All hazardous liquid waste or oil/fuel storage containers, temporary or otherwise, shall be
bunded.
(ii) All bunds will be designed to contain 110% of the capacity of the largest storage container
located within the bund.
(iii) There shall be no overflow drain facility from any bunds on site and all filling and off- take
points shall be located within the bund.
(iv) Facilities shall be provided for the collection and segregation of recyclable waste. Wastes
shall be collected for recycling/reuse whenever feasible or otherwise disposed of in
accordance with the Waste Management Act 1996 as amended.
b) The applicant shall immediately inform the Planning Authority and Inland Fisheries Board of
accidental spillage of wastewater, organic fertiliser, fuel, machine oil or any other substance
which may threaten the quality of any watercourse or groundwater body.
4.
The equine accommodation facilities shall be used for storage of equine equipment only.
Reason: In the interest of orderly development and environmental protection.
5.
A maximum of two no. horses shall be permitted in the equine accommodation unit. No other
livestock shall be accommodated in this facility.
Reason: In the interest of orderly development and environmental protection.
6.
The domestic garages / stores hereby approved shall be used solely for purposes ancillary to the
residential dwelling.
Reason: In the interest of orderly development.
7.
The development shall be in accordance with plans and documentation submitted to the Planning
Authority on 05/01/2026 as amended by Additional Information submitted to the Planning
Authority on 24/06/2026 except as may otherwise be required in order to comply with the above
conditions.
Reason: To ensure a satisfactory standard of development.
BUILDING CONTROL ADVICE NOTE
Before Any Building Works Commence - Things you should check!
1. Building Control Legal Requirements - Commencement Notice & Fire Safety Certificates (FSC);
In accordance with the Building Regulations you are obliged to submit a Commencement Notice prior to
commencement of a development and it must be submitted not less than 14 days and not more than 28 days
before you wish to commence. The Commencement Notice must be submitted to the Local Authority via the
online national portal BCMS. Applicants are advised to register on this website in advance of submitting a
commencement notice via the attached link: www.localgov.ie/en/bcms
As the type of Commencement Notice required will vary depending on your proposed development, you are
advised to seek advice from your agent or architect on what type of commencement notice is relevant to your
proposed works. Alternatively please feel free to contact Monaghan Fire & Building Control Authority for
advice at 047-30521 or email: bcms@monaghancoco.ie
Please be advised that works can not begin until the applicant has received a valid commencement notice from
the Building Control Authority, and that it is an offence under the Building Control Act 1990 to proceed with the
works without a valid commencement notice and/or a valid FSC (if required for works/development).
2. Pre-Development Conditions;
If there are any Pre-Development conditions on the schedule of conditions attached to your permission you
should give your immediate attention to them prior to the commencement of your development.
N.B. All conditions must be complied with in full as failure to do so will render your permission invalid and
may result in the initiation of enforcement proceedings for compliance with same.
3. Construction Products Regulations (SI No 225 of 2013);
You need to ensure that you, your builder, your designer/assigned certifier and your suppliers are familiar with
the requirements of the Construction Products Regulations.
For more information, please see link provided below.
https://monaghan.ie/firebuildingcontrol/building-control-construction-products-regulation/
4. Responsibilities under the Safety, Health and Welfare at Work (Construction) Regulations 2013;
The regulations are to ensure that there is a safe working environment for all involved in the construction
works, including dwellings.
For more information;
http://www.hsa.ie/eng/Publications_and_Forms/Publications/Construction/Guide_for_Homeowners.html