Loading...
HomeMy WebLinkAbout2660210 - Final Grant 14/08/2026 To: The Board of Management of St Louis Secondary School C/O Eamonn Monaghan M TEK 1, Armagh Road Monaghan H18 K038 File Number - 26/60210 Planning and Development Act 2000 (as amended) NOTIFICATION OF FINAL GRANT Monaghan County Council has by order dated 10/07/2026 granted the above named, for the development of land namely for:- permission for development consisting of the following: - 1. Full restoration of the 1930’s original glazed walkway known as the Arcade, built at the same time of a school building to connect to the main former convent structure. 2. Full restoration including thermal upgrades to the 1959 glazed walkway constructed at the same time as the Concert Hall to connect all areas of the convent / school. Proposed works include the replacement of the patent aluminium glazing bars and laminated glass roof with a natural slated roof. This application relates to a protected structure and is adjacent to other protected structures , at St Louis Secondary School, Mullaghmonaghan, Tirkeenan Townlands, Glen Road, Monaghan Town, subject to the 2 condition(s) set out in the Schedule attached. Signed on behalf of MONAGHAN COUNTY COUNCIL. __________________________ ADMINISTRATIVE OFFICER __________________________ DATE I refer you to the Health and Safety Authority website www.hsa.ie for new responsibilities for homeowners under Safety, Health and Welfare at Work (Construction) Regulations 2013. pp 14 / 08 / 2026 26/60210 The Board of Management of St Louis Secondary School, St Louis Secondary School, Mullaghmonaghan, Tirkeenan Townlands, Glen Road, Monaghan Town 1. a) The proposed works shall be carried out in accordance with the submitted documentation and in compliance with best practice in architectural conservation, including the relevant provisions of the Department of Arts, Heritage and the Gaeltacht’s Architectural Heritage Protection – Guidelines for Planning Authorities (2011). b) All works shall be overseen and supervised by a suitably qualified and experienced conservation professional. Reason: To ensure that the integrity of this protected structure is maintained and that all works are carried out in accordance with best conservation practice. 2. The development shall be carried out in accordance with plans and documentation submitted on 22/05/2026, except as may otherwise be required in order to comply with the above conditions. Reason: In the interest of orderly development. BUILDING CONTROL ADVICE NOTE Before Any Building Works Commence - Things you should check! 1. Building Control Legal Requirements - Commencement Notice & Fire Safety Certificates (FSC); In accordance with the Building Regulations you are obliged to submit a Commencement Notice prior to commencement of a development and it must be submitted not less than 14 days and not more than 28 days before you wish to commence. The Commencement Notice must be submitted to the Local Authority via the online national portal BCMS. Applicants are advised to register on this website in advance of submitting a commencement notice via the attached link: www.localgov.ie/en/bcms As the type of Commencement Notice required will vary depending on your proposed development, you are advised to seek advice from your agent or architect on what type of commencement notice is relevant to your proposed works. Alternatively please feel free to contact Monaghan Fire & Building Control Authority for advice at 047-30521 or email: bcms@monaghancoco.ie Please be advised that works can not begin until the applicant has received a valid commencement notice from the Building Control Authority, and that it is an offence under the Building Control Act 1990 to proceed with the works without a valid commencement notice and/or a valid FSC (if required for works/development). 2. Pre-Development Conditions; If there are any Pre-Development conditions on the schedule of conditions attached to your permission you should give your immediate attention to them prior to the commencement of your development. N.B. All conditions must be complied with in full as failure to do so will render your permission invalid and may result in the initiation of enforcement proceedings for compliance with same. 3. Construction Products Regulations (SI No 225 of 2013); You need to ensure that you, your builder, your designer/assigned certifier and your suppliers are familiar with the requirements of the Construction Products Regulations. For more information, please see link provided below. https://monaghan.ie/firebuildingcontrol/building-control-construction-products-regulation/ 4. Responsibilities under the Safety, Health and Welfare at Work (Construction) Regulations 2013; The regulations are to ensure that there is a safe working environment for all involved in the construction works, including dwellings. For more information; http://www.hsa.ie/eng/Publications_and_Forms/Publications/Construction/Guide_for_Homeowners.html