HomeMy WebLinkAbout2560325 - Notification of Decision
14/08/2026
Ref No: 25/60325
TO: Cian Watters
C/O Owen Cunningham
Thornford Lodge
Broomfield
Castleblayney
A75HE16
Re: Planning and Development Act 2000 (as amended)
NOTIFICATION OF DECISION
Monaghan County Council has by order dated 14/08/2026 decided to GRANT permission to the above
named for development of land, in accordance with the documents submitted namely for:- planning
permission for a new two storey style dwelling house, establish new entrance onto public road L4310,
new sewerage wastewater treatment system and percolation area, together with all associated site
development works, Significant further information received relates to submitted flood risk assessment
report, revised site layout, change of boundary and relocation of proposed dwelling at Gorteens,
Castleblayney, Co. Monaghan, subject to the 5 condition(s) set out in the Schedule attached.
Signed on behalf of Monaghan County Council
________________________________________
ADMINISTRATIVE OFFICER
___________________________
DATE
Provided there is no appeal against this DECISION a grant of planning permission will issue at the
end of four weeks (see footnote).
NO WORKS CAN COMMENCE ON FOOT OF A ‘NOTIFICATION OF DECISION’ ON AN APPLICATION.
THE DEVELOPMENT IS ONLY AUTHORISED WHEN A ‘NOTIFICATION OF FINAL GRANT’ IS ISSUED.
pp
14/08/2026
Footnote:
An appeal against a decision of a Planning Authority under the Planning and Development Act 2000 (as
amended) may be made to An Coimisiún Pleanála, 64 Marlborough Street, Dublin 1, D01 V902. (Tel.
(01) 8588100) during office hours.
1. You have four weeks beginning on the date the planning authority makes its decision which
was 14/08/2026. This is a strict time limit.
2. You must put your appeal in writing (either typed or handwritten).
3. You must clearly state your own name and address. If someone is acting for you, like a planning
agent they must clearly state their own name and address as well as your name and address.
4. You must give enough details to allow An Coimisiún Pleanála to identify the application you
wish to appeal.
5. You must provide your planning grounds of appeal (reasons and arguments) for your appeal
and any items you wish to support your grounds of appeal.
6. If you are a third party, you must include the written acknowledgement given to you by the
planning authority to confirm it received your submission at planning application stage.
7. You must pay the correct fee.
For more information on how to make an appeal see www.pleanala.ie
25/60325 Cian Watters Gorteens, Castleblayney, Co. Monaghan.
1.
a) The developer shall pay to Monaghan County Council a sum of €2018 in accordance with the
General Development Contribution Scheme 2021-2026 made by the Council under Section 48 of
the Planning and Development Act 2000 (as amended), towards expenditure incurred or proposed
to be incurred by the Council in the provision of community, recreation and amenity public
infrastructure and facilities in the area.
b) The sum attached to this condition shall be revised from the date of the grant of planning
permission to the value pertaining at the time of payment in accordance with the Wholesale Price
Index for Building and Construction (Materials and Wages).
c) No works shall commence until payment of the development contribution is made in full, or until
Monaghan County Council has agreed in writing to a schedule of phased payments of the sum.
Reason: It is considered appropriate that the developer should contribute towards the expenditure
incurred or proposed to be incurred by the Council in the provision of community, recreation and
amenity infrastructure and facilities in the area.
2.
a) Only that applicable portion of the roadside hedgerow, which must be lowered or uprooted to
provide adequate sight distances, shall be removed.
b) Remaining mature trees and hedgerow defining the site boundary shall be permanently retained
in this development. They shall also be reinforced with additional planting as per the submitted
landscaping details and protected from damage at all times, particularly during building
operations.
c) Notwithstanding the submitted landscaping details, new site and roadside boundaries shall be
planted with native hedgerow species so as to ultimately form naturalised hedgerows similar to
existing hedgerows in the vicinity. Predominant species shall be whitethorn, with blackthorn, hazel
and holly also included. Planting shall be in a double staggered row with eight 2-3 year old plants
per metre; 250mm apart, with 300mm between rows.
d) Hedgerow planting, as required, shall be supplemented as per the submitted landscaping details
with native tree species at irregular intervals. Species shall include oak, sycamore and beech.
e) Planting as required shall be carried out in the first planting season following commencement of
building operations and shall be permanently retained thereafter.
f) Any plant which fails shall be replaced. Trees shall be allowed to mature and shall not be topped
when trimming hedgerows.
g) Any boundary fencing shall be of stained wood.
h) Any facilitating cut and/or fill shall be graded to a natural contour to reflect the existing
topography of the area.
Reason: In the interest of visual amenity.
3.
a) Prior to any other works commencing, visibility splays of 70m, measured to the nearside road edge
in each direction, shall be provided from a point in the centre of the entrance 2.4m from the road
edge at a height of between 1.05m and 2m above ground level to an object height of between
1.05m and 2m above ground level in both directions. The visibility splays shall be retained and
kept clear from obstructions thereafter.
b) Where it is necessary to remove hedges, fences, embankments or other obstructions in order to
achieve the required visibility splays, they shall be reinstated behind the visibility splays. Any new
trees or shrubs shall be planted back from the visibility splays to allow for future growth and some
species will require additional set back. All existing planting shall be kept trimmed behind visibility
splays.
c) Where the existing roadside hedge/embankment is to be removed, the roadside verge shall be
widened (by grading back or infilling where necessary using appropriate inert material) to include
the entire area within the visibility splays, top soiled, and grassed to the satisfaction of the
Planning Authority.
d) The new entrance shall form a bellmouth of 4m radius with edge of new boundary. Recessed
entrance shall be of sufficient dimensions to contain a stationary vehicle off the public road.
Entrance gates shall open inwards only.
e) Entrance/access road shall be surfaced with concrete or bitmac from edge of public road for a
minimum of 5m and the surface shall be graded back so that its level at 3m from the edge of the
carriageway is a minimum of 100mm below road level. Gradient of access road shall be not greater
than 1:20 (5%) for the first 5m from boundary and 1:10 (10%) thereafter.
f) French drain consisting of 300mm diameter concrete pipes backfilled to ground level with suitable
granular filter material shall be placed along full site frontage. Drain shall discharge to the nearest
appropriate watercourse or drainage pipeline. Suitable gullies shall be placed at start, end and
intersection of other drains and at not greater than 40m intervals. Separate application shall be
made to Monaghan County Council if this requires a road opening licence.
g) Cattlegrid/ACO Drain/gullies shall be installed at proposed entrance and constructed in such a
manner as to prevent water from the entrance flowing onto the public road. Similarly, measures
shall be taken to prevent road surface water from flowing onto the entrance. The discharge from
the above drainage shall be piped to an appropriate drainage pipeline or watercourse.
h) Provision shall be made within the site for surface water drainage and no surface water shall be
allowed flow onto the public roadway. The discharge of surface water from the public road onto
the site through road surface drainage and road subsoil drainage shall remain unimpeded.
i) No development exempt or otherwise shall be erected over the public sewer, drain or water-main,
unless otherwise agreed in writing with the Planning Authority.
j) Before any work is commenced on this development a security, by way of a cash deposit, in the
sum of €2250, shall be paid to the Planning Authority by the developer to ensure the satisfactory
completion of all surface water drainage/boundary work within and abutting the site area, to
prevent runoff of surface water onto the public roadway and to ensure that no damage is caused
to public roadway and any such damage is repaired satisfactorily. Failure to carry out all entrance
works to a standard to the satisfaction of the Planning Authority will result in forfeiture of part or
all of the cash security.
Reason: In the interest of traffic/road safety.
4.
a) The proposed effluent treatment and disposal system shall be located, constructed and
maintained in accordance with the details submitted and in accordance with the requirements of
the document entitled Environmental Protection Agency Code of Practice - Domestic Wastewater
Treatment Systems (population equivalent ≤ 10), 2021. No system other than the type proposed in
the application shall be installed without the prior written agreement of the Planning Authority.
b) A maintenance contract for the effluent treatment and disposal system shall be entered into from
the first date of occupancy of the dwelling and permanently maintained thereafter. Signed and
dated copies of the contract, which shall be for a minimum period of three years, shall be
submitted to, and agreed in writing with the Planning Authority within two months of the
installation.
c) Surface water soakaways shall be located such that the drainage from the dwelling and paved
areas of the site shall be diverted away from the location of the polishing filter.
d) Within two months of the first occupation of the dwelling, the developer shall submit a report
from a suitably qualified person with professional indemnity insurance certifying that the
proposed effluent treatment and disposal system has been installed and commissioned in
accordance with the approved details and is working in a satisfactory manner and that the
polishing filter is constructed in accordance with the standards set out in the EPA document.
e) Proposed well shall be located a minimum of 30m uphill of proposed on-site wastewater
treatment system.
Reason: In the interest of public health and environmental protection.
5.
The development shall be carried out strictly in accordance with the plans and documents submitted
on the 14/08/2025 as amended on the 10/07/2026, except as may otherwise be required in order to
comply with the above conditions.
Reason: In the interest of proper planning and sustainable development.