HomeMy WebLinkAbout2660104 - Final Grant
18/08/2026
To: Jason McGardle
Peter Culleton
Mullabrack
Shercock
Co. Cavan
A81 PN24
File Number - 26/60104
Planning and Development Act 2000 (as amended)
NOTIFICATION OF FINAL GRANT
Monaghan County Council has by order dated 14/07/2026 granted the above named, for
the development of land namely for:- permission for a development which will consist of a
single storey dwelling house, single storey domestic garage, upgrade of existing farm
entrance and access lane, provision of entrance piers, installation of a wastewater
treatment system and percolation area together with all ancillary site development works
, at Cargaghmore, Carrickmacross, Co. Monaghan, subject to the 8 condition(s) set out in
the Schedule attached.
Signed on behalf of MONAGHAN COUNTY COUNCIL.
pp__________________________
ADMINISTRATIVE OFFICER
__________________________
DATE
I refer you to the Health and Safety Authority website www.hsa.ie for new responsibilities
for homeowners under Safety, Health and Welfare at Work (Construction) Regulations
2013.
18/08/2026
26/60104 Jason McGardle, Cargaghmore, Carrickmacross, Co. Monaghan
1.
a) The developer shall pay to Monaghan County Council a sum of €2,205.00 in
accordance with the General Development Contribution Scheme 2021-2026 (as
revised), made by the Council under Section 48 of the Planning and Development Act
2000 (as amended), towards expenditure incurred or proposed to be incurred by the
Council in the provision of community, recreation and amenity public infrastructure
and facilities in the area.
b) The sum attached to this condition shall be revised from the date of the grant of
planning permission to the value pertaining at the time of payment in accordance with
the Wholesale Price Index for Building and Construction (Materials and Wages).
c) No works shall commence until payment of the development contribution is made in
full, or until Monaghan County Council has agreed in writing to a schedule of phased
payments of the sum.
Reason: It is considered appropriate that the developer should contribute towards the
expenditure incurred or proposed to be incurred by the Council in the provision of
community, recreation and amenity infrastructure and facilities in the area.
2.
a) Prior to commencement of development, the developer shall submit to the planning
authority for approval in writing, a revised site layout plan and cross sections
indicating the finished floor level of the dwelling and garage lowered by one metre, or
as otherwise agreed.
b) The development shall be carried out in accordance with the agreed revised plans.
c) Any facilitating cut and/or fill shall be graded to a natural contour to reflect the
existing topography of the area.
Reason: In the interest of visual amenity and securing a satisfactory standard of
development.
3.
a) Prior to any other works commencing, visibility splays of 70m, measured to the
nearside road edge in each direction, shall be provided from a point in the centre of
the entrance to the private lane, 2.4m from the road edge at a height of between
1.05m and 2m above ground level to an object height of between 1.05m and 2m
above ground level in both directions. The visibility splays shall be retained and kept
clear from obstructions thereafter.
b) Where it is necessary to remove hedges, fences, embankments or other obstructions
in order to achieve the required visibility splays, they shall be reinstated behind the
visibility splays. Any new trees or shrubs shall be planted back from the visibility splays
to allow for future growth and some species will require additional set back. All
existing planting shall be kept trimmed behind visibility splays.
c) Where the existing roadside hedge/embankment is to be removed, the roadside verge
shall be widened (by grading back or infilling where necessary using appropriate inert
material) to include the entire area within the visibility splays, top soiled, and grassed
to the satisfaction of the Planning Authority.
d) The new entrance shall form a bellmouth of 5m radius with edge of new boundary.
Recessed entrance shall be of sufficient dimensions to contain a stationary vehicle off
the public road. Entrance gates shall open inwards only.
e) Entrance/access road shall be surfaced with concrete or bitmac from edge of public
road for a minimum of 5m and the surface shall be graded back so that its level at 3m
from the edge of the carriageway is a minimum of 100mm below road level. Gradient
of access road shall be not greater than 1:20 (5%) for the first 5m from boundary and
1:10 (10%) thereafter.
f) Cattlegrid/ACO Drain/gullies shall be installed at proposed entrance and constructed
in such a manner as to prevent water from the entrance flowing onto the public road.
Similarly, measures shall be taken to prevent road surface water from flowing onto the
entrance. The discharge from the above drainage shall be piped to an appropriate
drainage pipeline or watercourse.
g) Provision shall be made within the site for surface water drainage, and no surface
water shall be allowed flow onto the public roadway. The discharge of surface water
from the public road onto the site through road surface drainage and road subsoil
drainage shall remain unimpeded.
h) No development exempt or otherwise shall be erected over the public sewer, drain or
water-main, unless otherwise agreed in writing with the Planning Authority.
i) Before any work is commenced on this development a security, by way of a cash
deposit, in the sum of €2250, shall be paid to the Planning Authority by the developer
to ensure the satisfactory completion of all surface water drainage/boundary work
within and abutting the site area, to prevent runoff of surface water onto the public
roadway and to ensure that no damage is caused to public roadway and any such
damage is repaired satisfactorily. Failure to carry out all entrance works to a standard
to the satisfaction of the Planning Authority will result in forfeiture of part or all of the
cash security
Reason: In the interest of traffic/road safety.
4.
a) The proposed effluent treatment and disposal system shall be located, constructed
and maintained in accordance with the details submitted to the planning authority on
the 24/03/2026 and in accordance with the requirements of the document entitled
The Environmental Protection Agency Code of Practice Domestic Waste Water
Treatment Systems (Population Equivalent <= 10) 2021. No system other than the type
proposed in the application shall be installed without the prior written agreement of
the Planning Authority.
b) A maintenance contract for the effluent treatment and disposal system shall be
entered into from the first date of occupancy of the dwelling and permanently
maintained thereafter. Signed and dated copies of the contract, which shall be for a
minimum period of 3 years, shall be submitted to, and agreed in writing with the
planning authority within 2 months of the installation.
c) Surface water soakaways shall be located such that the drainage from the dwelling
and paved areas of the site shall be diverted away from the location of the polishing
filter.
d) Within two months of the first occupation of the dwelling, the developer shall submit
a report from a suitably qualified person with professional indemnity insurance
certifying that the proposed effluent treatment and disposal system has been installed
and commissioned in accordance with the approved details and is working in a
satisfactory manner and that the polishing filter is constructed in accordance with the
standards set out in the EPA document.
e) Proposed well to be located a minimum of 30m upgradient of the proposed on site
WWTS.
f) A French drain shall be installed upgradient of the proposed waste water treatment
system.
Reason: In the interest of public health and environmental protection.
5.
a) Existing mature trees and hedgerow defining the site boundaries shall be permanently
retained in this development. They shall also be reinforced with additional planting as
per the submitted landscaping plan and protected from damage at all times,
particularly during building operations.
b) Notwithstanding the submitted landscaping plan, the new site boundaries shall be
planted with native hedgerow species so as to form naturalised hedgerows similar to
existing hedgerows in the vicinity. Predominant species shall be whitethorn, with
blackthorn, hazel and holly also included. Planting shall be in a double staggered row
with 8 (eight) 2-3 year old plants per metre; 250mm apart, with 300mm between
rows.
c) Hedgerow planting, as required, shall be supplemented as per the submitted
landscaping plan with native tree species at irregular intervals. Species shall include
ash, oak, sycamore and beech.
d) Planting as required shall be carried out in the first planting season following
commencement of building operations and shall be permanently retained thereafter.
Any plant which fails in the first planting season shall be replaced. Trees shall be
allowed to mature and shall not be topped when trimming hedgerows.
e) Any boundary fencing shall be of stained wood.
Reason: In the interest of visual amenity.
6.
The garage hereby approved shall be used solely for purposes ancillary to the residential
dwelling within the site area, and not for any separate purposes.
Reason: In the interest of orderly development.
7.
A maximum of two external wall finishes shall be utilised.
Reason: In the interest of visual amenity.
8.
The development shall be carried out in accordance with plans and documentation submitted
to the Planning Authority on 24/03/2026, as amended by additional information on
05/07/2026, except as may otherwise be required in order to comply with the above
conditions.
Reason: To ensure a satisfactory standard of development.
BUILDING CONTROL ADVICE NOTE
Before Any Building Works Commence - Things you should check!
1. Building Control Legal Requirements - Commencement Notice & Fire Safety Certificates (FSC);
In accordance with the Building Regulations you are obliged to submit a Commencement Notice prior to
commencement of a development and it must be submitted not less than 14 days and not more than 28 days
before you wish to commence. The Commencement Notice must be submitted to the Local Authority via the
online national portal BCMS. Applicants are advised to register on this website in advance of submitting a
commencement notice via the attached link: www.localgov.ie/en/bcms
As the type of Commencement Notice required will vary depending on your proposed development, you are
advised to seek advice from your agent or architect on what type of commencement notice is relevant to your
proposed works. Alternatively please feel free to contact Monaghan Fire & Building Control Authority for
advice at 047-30521 or email: bcms@monaghancoco.ie
Please be advised that works can not begin until the applicant has received a valid commencement notice from
the Building Control Authority, and that it is an offence under the Building Control Act 1990 to proceed with the
works without a valid commencement notice and/or a valid FSC (if required for works/development).
2. Pre-Development Conditions;
If there are any Pre-Development conditions on the schedule of conditions attached to your permission you
should give your immediate attention to them prior to the commencement of your development.
N.B. All conditions must be complied with in full as failure to do so will render your permission invalid and
may result in the initiation of enforcement proceedings for compliance with same.
3. Construction Products Regulations (SI No 225 of 2013);
You need to ensure that you, your builder, your designer/assigned certifier and your suppliers are familiar with
the requirements of the Construction Products Regulations.
For more information, please see link provided below.
https://monaghan.ie/firebuildingcontrol/building-control-construction-products-regulation/
4. Responsibilities under the Safety, Health and Welfare at Work (Construction) Regulations 2013;
The regulations are to ensure that there is a safe working environment for all involved in the construction
works, including dwellings.
For more information;
http://www.hsa.ie/eng/Publications_and_Forms/Publications/Construction/Guide_for_Homeowners.html