Loading...
HomeMy WebLinkAbout2634 - Final GrantRannog Pleanail Planning Section a 00353 47 30532 q�Cc aF,ue OtC Comh,lrle Centre Mhulneach6ln planning@monag hancoco. ie Monaghan County Council 18/08/2026 To: Blackhill GAA Niall McKenna Drumdesco Scotstown Co. Monaghan File Number - 26/34 Planning and Development Act 2000 (as amended NOTIFICATION OF FINAL GRANT Monaghan County Council has by order dated 14/07/2026 granted the above named, for the development of land namely for:- permission to insert new training field, floodlighting, all weather playing court, car parking with interceptor tank and upgrade new entrance on to public road and all associated works. Prev PI Ref25/20 , at Kinnagin, Castleblayney, Monaghan, subject to the 5 condition(s) set out in the Schedule attached. Signed on behalf of MONAGHAN COUNTY COUNCIL. pp a ADMIINISTRATIV FFICER DATE I refer you to the Health and Safety Authority website www.hsa.ie for new responsibilities for homeowners under Safety, Health and Welfare at Work (Construction) Regulations 2013. 0 Oifigi Pleanala Comhairle Contae Mhuineachain 1 Sraid Bhaile Atha Cliath, Muineachan, H18 X982, Eire. O® 00353 47 30500 info@monaghancoco.ie eolas@monaghancoco.ie www.monaghan.ie 0 Planning Offices Monaghan County Council 1 Dublin Street, Monaghan, H18 X982, Ireland. Failtionn an tUdaras Aitiuil roimh chomhfhreagras i nGaeilge 26/34 Blackhill GAA, Kinnagin, Castleblayney, Monaghan 1. Floodlighting shall not be operated after 22:00 on any day. Floodlighting shall be installed and operated in accordance with the lighting specifications and mitigation measures submitted to the Planning Authority. The lighting shall be designed and maintained so as to minimise light spill and glare onto adjoining properties and the public road. Reason: In the interests of residential amenity and orderly development. 9 (a) Sight distances of 70m in both directions shall be provided from a point in the site entrance 2.4m from the road edge and 1.05m above ground level where the laneway meets the adjoining LP -3810 local road. Sight distances shall be measured to the nearside road edge in both directions. (b) The discharge of surface water from the public road onto the site through road surface drainage and road subsoil drainage shall remain unimpeded. (c) Provision to be made within the site for surface water drainage and no surface water shall be allowed flow onto the public roadway. (d) No development exempt or otherwise shall be erected over a public sewer, drain or water main. (e) Before any work is commenced on this development a security, by way of a cash deposit, in the sum of €2250, shall be paid to the Planning Authority by the developer to ensure the satisfactory completion of all surface water drainage/boundary work within and abutting the site area, to prevent runoff of surface water onto the public roadway and to ensure that no damage is caused to public roadway and any such damage is repaired satisfactorily. Reason: In the interest of traffic/road safety. 3. (a) Developer shall ensure that adequate measures are in place for the construction phase to ensure there is no discharge of polluting matter/sediment laden waters to any watercourse or drains. (b) Any construction and demolition waste shall be appropriately recovered/disposed of by a registered, qualified waste contractor in accordance with the Waste Management Act 1996 (as amended). (c) Any imported fill material shall be appropriately acquired and shall be suitable in nature. (d) All surface water arising from the development shall be collected and disposed of in accordance with the details submitted to the Planning Authority. The proposed interceptor tank shall be installed prior to the first use of the car park and shall thereafter be maintained in good working order. Reason: In the interest of environmental protection. 4. Proposed landscaping shall be carried out during the first planting season following completion of the development. Any trees, hedgerows or shrubs which die, are removed or become seriously damaged within a period of five years from the date of planting shall be replaced with similar species of similar size. Reason: In the interest of visual amenity 0 Oifigi Pleanala Comhairle Contae Mhuineachain 1 Sraid Bhaile Atha Cliath, Muineachan, H18 X982, Eire. O 00353 47 30500 info@monaghancoco.ie eolas@monaghancoco.ie www.monaghan.ie 0 Planning Offices Monaghan County Council 1 Dublin Street, Monaghan, H18 X982, Ireland. Failtionn an tCdaras Aitioil roimh chomhfhreagras i nGaeilge 5. The development shall be carried out strictly in accordance with the plans and documents submitted on the 23/04/2026 as amended on the 22/06/2026, except as may otherwise be required in order to comply with the above conditions. Reason: In the interest of proper planning and sustainable development. 0 Oifigi Pleanala Comhairle Contae Mhuineachain 1 Sraid Bhaile Atha Cliath, Muineachan, H18 X982, Eire. O® 00353 47 30500 info@monaghancoco.ie eolas@monaghancoco.ie www.monaghan.ie 0 Planning Offices Monaghan County Council 1 Dublin Street, Monaghan, H18 X982, Ireland. F6iltionn an tUdaras AitiUil roimh chomhfhreagras i nGaeilge BUILDING CONTROL ADVICE NOTE Before Any Building Works Commence - Things you should check! 1. Building Control Legal Requirements - Commencement Notice & Fire Safety Certificates (FSC); In accordance with the Building Regulations you are obliged to submit a Commencement Notice prior to commencement of a development and it must be submitted not less than 14 days and not more than 28 days before you wish to commence. The Commencement Notice must be submitted to the Local Authority via the online national portal BCMS. Applicants are advised to register on this website in advance of submitting a commencement notice via the attached link: www.localgov.ie/en/bcros As the type of Commencement Notice required will vary depending on your proposed development, you are advised to seek advice from your agent or architect on what type of commencement notice is relevant to your proposed works. Alternatively please feel free to contact Monaghan Fire & Building Control Authority for advice at 047-30521 or email: bcros@monaghancoco.ie Please be advised that works can not begin until the applicant has received a valid commencement notice from the Building Control Authority, and that it is an offence under the Building Control Act 1990 to proceed with the works without a valid commencement notice and/or a valid FSC (if required for works/development). 2. Pre -Development Conditions; If there are any Pre -Development conditions on the schedule of conditions attached to your permission you should give your immediate attention to them prior to the commencement of your development. N.B. All conditions must be complied with in full as failure to do so will render your permission invalid and may result in the initiation of enforcement proceedings for compliance with same. 3. Construction Products Regulations (SI No 225 of 2013); You need to ensure that you, your builder, your designer/assigned certifier and your suppliers are familiar with the requirements of the Construction Products Regulations. For more information, please see link provided below. https://monaghan.ie/firebuildingcontrol/building-control-construction-products-regulation/ 4. Responsibilities under the Safety, Health and Welfare at Work (Construction) Regulations 2013; The regulations are to ensure that there is a safe working environment for all involved in the construction works, including dwellings. For more information; http://www.hsa.ie/eng/Publications and Forms/Publications/Construction/Guide for Homeowners.html O O® 0 Oifigi Pleanala Comhairle Contae Mhuineachain 1 Sraid Bhaile Atha Cliath, Muineachan, H 1 8 X982, Eire. 00353 47 30500 info@monaghancoco.ie eolas@monaghancoco.ie www.monaghan.ie Planning Offices Monaghan County Council 1 Dublin Street, Monaghan, H18 X982, Ireland. Failtionn an tUdaras Aitiuil roimh chomhfhreagras i nGaeilge