HomeMy WebLinkAbout2660165 - F.I. Maps.EXISTING
CLOTHES
SHOP
53m²
PROPOSED EXTENSION OF THE EXISTING
GROUND-FLOOR RETAIL UNIT THROUGH THE
AMALGAMATION WITH THE ADJOINING
PREMISES AT NO. 56 DUBLIN STREET,
MONAGHAN, TO PROVIDE AN ENLARGED
RETAIL FLOOR AREA AND ASSOCIATED
INTERNAL RECONFIGURATION WORKS.
55 DUBLIN STREET
MONAGHAN
H18 X754
56 DUBLIN STREET
MONAGHAN
H18 DT38
FFL
60.04
STORAGE
8m²
EXTENDED
CLOTHES
SHOP
34m²
PROPOSED NEW STRUCTURAL OPENING IN
THE EXISTING LOADBEARING STONE WALL
TO FACILITATE THE AMALGAMATION OF
THE GROUND-FLOOR RETAIL UNIT WITH
NO. 55 DUBLIN STREET, INCLUDING
NECESSARY TEMPORARY WORKS, CUTTING
AND REMOVAL OF STONEWORK,
INSTALLATION OF STRUCTURAL
LINTEL/BEAM WITH ADEQUATE BEARINGS
IN ACCORDANCE WITH STRUCTURAL
ENGINEER’S DESIGN, AND MAKING GOOD
TO MATCH EXISTING FINISHES; ALL
WORKS TO BE CARRIED OUT WITH
MINIMAL DISTURBANCE TO THE EXISTING
FABRIC AND IN COMPLIANCE WITH
BUILDING REGULATIONS.
ACCESS TO
FIRST FLOOR
PROPOSED GROUND FLOOR PLAN
FIRST FLOOR AREA = 48m²
EXTENT OF CHANGES
IN RED CLOUD
NEW STAIRS TO SERVES ALL FLOORS IN AN
EXISTING BUILDING, THEY SHALL FOLLOW CLAUSE
1.3.4.3 AS FAR AS PRACTICABLE, WITH A MINIMUM
UNOBSTRUCTED WIDTH BETWEEN HANDRAILS OF 1000
MM, MINIMUM LANDING LENGTH OF 1000 MM CLEAR
OF DOOR SWINGS, AND MINIMUM STEP GOING OF 250
MM. THE RISE OF EACH STEP BETWEEN 150 MM AND
180 MM. PROVIDE CONTINUOUS HANDRAILS ON BOTH
SIDES FOR FLIGHT
NOTES FOR EXISTING WALLS
1.PRIOR TO UNDERTAKING DRY-LINING WORKS, IT IS
ESSENTIAL TO RESOLVE ANY EXISTING ISSUES
RELATED TO DAMP, PARTICULARLY RISING DAMP.
APPROPRIATE REMEDIAL MEASURES—SUCH AS THE
INSTALLATION OF A DAMP-PROOF COURSE (DPC) OR
THE PROVISION OF FRENCH DRAINS—SHOULD BE
IMPLEMENTED TO MITIGATE MOISTURE INGRESS AT THE
BASE OF THE WALLS.
2.CONDUCT A THOROUGH ASSESSMENT OF THE WALL'S
CONDITION, PAYING CLOSE ATTENTION TO THE
PRESENCE OF TRADITIONAL LIME RENDER, STRUCTURAL
INTEGRITY, AND ANY HERITAGE FEATURES THAT MUST
BE PRESERVED.
3.EMPLOY MOISTURE METERS TO ACCURATELY MEASURE
AND DOCUMENT THE WALL’S MOISTURE CONTENT TO
INFORM THE APPROPRIATE METHOD OF INSULATION AND
INTERNAL FINISH.
4.CAREFULLY REMOVE ANY EXISTING CEMENTITIOUS
PLASTER TO REVEAL THE UNDERLYING STONE
SUBSTRATE, THEREBY ENSURING COMPATIBILITY WITH
BREATHABLE MATERIALS.
5.APPLY AN 18MM COAT OF INTERNAL LIME RENDER TO
THE EXPOSED STONEWORK, FACILITATING VAPOUR
PERMEABILITY AND MAINTAINING THE WALL’S ABILITY
TO ‘BREATHE’.
6.CONSTRUCT A SUPPORT FRAMEWORK USING METAL
STUDWORK FIXED TO THE WALL, DESIGNED TO
ACCOMMODATE INSULATION WHILE ALLOWING FOR AIR
CIRCULATION AND STRUCTURAL STABILITY.
7.INSTALL 80MM REMMERS IQ-THERM INSULATION BOARDS
WITHIN THE STUD FRAMEWORK TO ENHANCE THERMAL
PERFORMANCE WHILE PRESERVING BREATHABILITY.
8.FIT A BREATHER MEMBRANE OVER THE INSULATION,
ENSURING ALL JOINTS AND PENETRATIONS ARE SEALED
WITH APPROPRIATE TAPES TO PREVENT INTERSTITIAL
CONDENSATION.
9.COMPLETE THE INTERNAL LINING WITH GYPROC HABITO
PLASTERBOARD.
DOUBLE GLAZED THERMALLY BROKEN
FRAME & SASH WINDOW UNITS AND DOORS
WITH LOW EMISSIVITY COATED ARGON
FILLED GLASS WITH INSULATED
SILICONE SPACER WITH AN OVERALL
U-VALUE TO MEET THE REQUIREMENTS OF
THE PROVISIONAL PART L BER REPORT
2.5MM SKIM COAT PLASTER ON
12.5MM GYPROC HABITO PLASTERBOARD ON
BREATHER MEMBRANE ON
80MM REMMERS IQ-THERM INSULATION ON
METAL STUD SUPPORT FRAMEWORK WITH
25MM AIR GAP ON
18MM LIME RENDER
CAREFULLY REMOVE ALL EXISTING CEMENT
PLASTER USING LOW-IMPACT HAND TOOLS TO
EXPOSE AND PRESERVE THE ORIGINAL
HAND-BUILT STONEWORK, ENSURING
PROTECTION, APPROPRIATE CLEANING, AND
REPAIR WITH COMPATIBLE LIME-BASED
MATERIALS IN ACCORDANCE WITH
CONSERVATION BEST PRACTICE.
EXISTING GROUND FLOOR PLAN
FIRST FLOOR AREA = 48m²
Figured dimensions only to be used. This
drawing is copyright of Enda Prendergast
Architect. All information is shared as per
approved use in accordance with BS1192(2007)
+ A2(2016), Table 5; Standard Codes for
Suitability of Models and Documents. Any
discrepancies to be reported to the Architect
for clarification. This drawing may not be
copied or reproduced without written consent.
Enda Prendergast
Architects
The Rossmore Factory
Dublin Road | Monaghan
Ireland
H18 KT02
+353 87 980 7312
endaprendergast@gmail.com
Client
Project Proposed renovation and
reconfiguration works to
existing premises at 55/56
Dublin Street, Monaghan
Kieran & Brian Brady
Drawing GROUND FLOOR PLAN
Dwg No
1/50 A1Scale
Job No
Date 25/3/26
2603 EPApproved
P.L.Status
Rev A
25/3/26 Issue-Planing
FOUNDED 1839THE ROYAL INSTITU T E O F THE ARC
H
I
T
ECTS OF IRELAND0326 / PA / 202
55 DUBLIN STREET
MONAGHAN
H18 X754
56 DUBLIN STREET
MONAGHAN
H18 DT38
BICYCLE
STORE RECEIVED: 19/08/2026