Loading...
HomeMy WebLinkAbout2678 - Site Assessment ReportFOR KEVIN O'HAGAN, DERRYRELLAN, KILLYBRONE, CO MONAGHAN. PlX(�ZN DEPAF�i N� \ttF.N PLANN NN FCTI N 19 AUG 2n2r ONAGH \N QQ. C NCIL N. CO. PLAN ING 5 TION REG. PLANK NG ®i:.PARTMViEY-`j PER NO. N926/7o - MONAGHAN CO. COI_UN . APPENDIX A: SITE CHARACTERISATION FORM File Reference: Kevin O'Hagan, Cavan Moutry, Emyvale. Prefix: Mr S First Name: Kevin Surname: O'Hagan Address: Site Location and Townland: rlornirAlinn Killvhrnna rxn-AAnnnnhnn Derryrellan, Killybrone, Co -Monaghan. Number of Bedrooms: Maximum Number of ResiOpnts: 6 Comments on population equivalent ON. CC There are 4 double bedrooms which will equate to six adults. NING S 4 v'L 2026 Proposed Water Supply: RE . NO Mains Private Well/Borehole Soil Type, (Specify Type): Poorly drained mineral soil. Gleys. AminPD Sandstone and shale till TLCSsS Subsoil, (Specify Type): N Group Nell/Borehole O Bedrock Type: DMSSL Aquifer Category: Regionally Important Loc ly�tfL 4 Lm 0 Poor El Vulnerability: Extreme High Moderate wlv L~ IRAR% Groundwater Body: Aughnacloy Status Poor'` Name of Public/Group Scheme Water Supply within 1 km: ITruce l C Source Protection Area: ZOO ❑ SI SO Groundwater Protec i"' 5� R1 Presence of Significant Sites (Archaeological, Natural & Historical): None Past experience in the area: Raised mounds gererally required in this area. Comments: (Integrate the information above in order to comment on: the potential suitability of the ite, p jntigl taggets at risk, and/o ally potential sine restrictions). U'U V.. -., '. .,�•, it The site is potentially suitable as there appears to be no restrictions t the on -site treatment of domestic'efflueht. Surface water and ground water could be targets at risk. + 9 A�7,�',i I Note: Only information available at the desk study stage should he used in this section. 3.1 Visual Assessment Landscape Position: Low-lying near base of North -Easterly facing slope. Slope: Steep (>1:5) Shallow (1:5-1:20) Relatively Flat (<1:20) Slope Comment About 1:18 Surface Features within a minimum of 250rn (Distance To Features Should Be Noted In Metres) Houses: Dwelling house 55m East North-East, 99m North North-West and 102m North-West. Existing Land Use: Agricultural grassland. Vegetation Indicators: Grass Groundwater Flow Direction: Expected North-East. Ground Condition: Firm during a spell of wet weather. Site Boundaries: Mature hedges all around. 3.1 Visual Assessment (contd.) Roads: Local road along the North-Eastern boundary hedge. Outcrops (Bedrock And/Or Subsoil): None Surface Water Ponding: None Lakes: Lough More 3.2km South -East. Beaches/Shellfish Areas: None Wetlands: None Karst Features: None Watercourses/Streams:" Rakelly river 282m South -East. *Note and record water level 3.1 Visual Assessment (contd.) Drainage Ditches:' Open ditch along North-East boundary hedge. 1 m deep containing 0.2m water Springs:* None listed within 100m None within 100m Comments: (Integrate the information above In order to comment on: the potential suitability of the site, potential targets at risk, the suitability of the site to treat the wastewater and the location of the proposed system within the site). The site was in good condition underfoot with the assessment being carried out during a period of wet weather. *Note and record water level 3.2 Trial Hole (should be a minimum of 2.1m deep (3m for regionally important aquifers)) To avoid any accidental damage, a trial hole assessment or percolation tests should not be undertaken in areas which are at or adjacent to significant sites, (e.g. NHAs, SACs, SPAs, and/or Archaeological etc.), without prior advice from National Parks and Wildlife Service or the Heritage Service. Depth of trial hole (m): 2.1 Depth from ground surface Depth from ground surface to bedrock (m) (if present): J to water table (m) (if present): 1.3 Depth of water ingress: I 0.8j Rock type (if present): None Date and time of excavation: 08 -Jun -2026 II 12:301 Date and time of examination: 10 -Jun -2026 10:00 Depth of Surface and Subsurface Soil/Subsoil Percolation Texture & Plasticity and Soil Density/ Colour**** Preferential Tests Classification** dilatancy*** Structure Compactness flowpaths 0.1 m II 0.2m I 0.3 m I 0.4 m 0 0.5m 0 0.6m1 I 0.7 m II 0.8m tS 0.9m I 1.0 m I 1.im l__ I 1.2 m 1.3m1 1.4 m II 1.5m II 1.6m �] 1.7 m I 1.8m II 1.9m 0 2.0m 0 2.1 m II 2.2m 0 2.3 m 2.4 m 2.5 m I 2.6m 0 2.7m 1I 2.8m1 2.9 m 3.0 m 3.lm[ 3.2 m 3.3 m 3.4 m 3.5 m I SILT / CLAY 3 threads —70mm TOP SOIL ribbons — dilatant 5 threads -110mm SILT / CLAY subsoil ribbons - dilates 50% clay with difficulty. Water table 1.3m Base of trial hole 2.1 m � 0 Likely Subsurface Percolation Value: I 401 Likely Surface Percolation Value: I 30 CRUMB BLOCKY SOFT UNCOMPACT BROWN GRASS ROOTS NONE PALE BROWN Note: Depth of percolation test holes should be indicated on log above. ('Enter Surface or Subsurface at depths as appropriate). See Appendix E for BS 5930 classification. 3 samples to be tested for each horizon and results should be entered above for each horizon. .... Ail signs of mottling should be recorded. 3.2 Trial Hole (contd.) Evaluation: The trial hole was 2.1 m deep. There were two distinct layers. Silt / clay top -soil and below that sub -soil that was blocky in nature with about 40% clay. The water table was at 1.3m 3.3(a) Subsurface Percolation Test for Subsoil Step 1: Test Hole Preparation Percolation Test Hole 3 Depth from ground surface 40011 40011400 to top of hole (mm) (A)ii II Depth from ground surface 80011 Ii 80011 I 8001 to base of hole (mm) (B) II II Depth of hole (mm) [B - A] 400 r 400 400 Dimensions of hole 270 x 310 280 x 300 290 x 280 [length x breadth (mm)] Step 2: Pre -Soaking Test Holes Pre-soak start Date 08 -Jun -2026 I 08 -Jun -2026 08 -Jun -2026 Time 16:301 I 16:301 I 16:30 2nd pre-soak Date 09 -Jun -2026 09 -Jun -2026 09 -Jun -2026 start Time 15:00 15:00 15:00 Each hole should be pre-soaked twice before the test is carried out. Step 3: Measuring 1100 Percolation Test Hole No. 1 2 3 Date of test 10-06-2026 II 10-06-202611 10-06-2026 Time filled to 400 mm 10:00 10:00 10:001 Time water level at 300 mm I 13:20 13:3011 13:401 Time (min,) to drop 100 mm (T100) I 200.0011 210.0011 220.001 Average T100 210.00 If T100 > 480 minutes then Subsurface Percolation value >120 — site unsuitable for discharge to ground If T100 ≤ 210 minutes then go to Step 4; If T100> 210 minutes then go to Step 5; Step 4: Standard Method (where T,00 < 210 minutes) Percolation Test Hole 1 2 3 Fill no. Start Finish At (min) Start Finish At (min) Start Finish At (min) Time Time Time Time Time Time (at 300 (at 200 (at 300 (at 200 (at 300 (at 200 mm) mm) mm) mm) mm) mm) 1 1I II o.00j I II 0.00l II 0.00 2 I 1 0.001 I II II 0.001 II II 0.00 3 1l II 0.001 II II 0.00 0.00 Average At 0.00 =0-00 0.00 Value Average At/4 = Average At/4 = Average At/4 = [Hole No.1] I 0.001(t1) [Hole No.2] T 0.001(t2) [Hole No.3] 0.001(t3) Result of Test: Subsurface Percolation Value = 0.00 (min/25 mm) Comments: With the sub -surface tests being slow I proceded to step 5 Step 5: Modified Method (where T100 > 210 minutes) Percolation Percolation Test Hole No. 1 Test Hole No. 2 Fall of water Time Start Finish Time K,, T- Fall of water Time Start Finish Time K„ T- in hole (mm) Factor Time Time of fall = T, Value in hole (mm) Factor Time Time of fall = T, Value = T, hh:mm hh:mm (mins) / T,. = 4.45 = T, hh:mm hh:mm (mins) / T , = 4.45 =T /K„ =1 /K,, 300-250 I 8.1 13:20 14:20 60.0Q11 0.1411 32.96 300 - 250 8.1 13:30 14:50 80.00ll 0.10 43.95 250-200 I 14:20 15.40 80.0011 0.12 36.70 250-200 Ig7 14:50 16:00 70.0011 0.1411 32.11 200 - 150 11.9 15:40 17:55 135.00 0.09 50.48 200 - 150 I 11.9 16:00 I 18:00 120.00 0.10 44.87 150- 100 14.1 17:55 20:40 165.00 0.09 52.07 150 - 100 I 14.1 18:00 I 21:10 190.00 0.07 59.96 Average T- Value T- Value Hole 1 = (T) 3.06l Average T- Value T- Value Hole 2 = (T2) 45.23 Result of Test: Subsurface Percolation Value = Percolation 45.271 (min/25 mm) Test Hole No. 3 Fall of water Time Start Finish Time K„ T— Comments: in hole (mm) Factor Time Tim§e of fall = T, Value = T, hh:mm hh:mm (mins) /T,, = 4.45 A raised mound will be required due to the amount of clay in the subsoil. 300-250 8.1 13:40 15:10 90.00 0.09 49.44 250 - 200 Ig7 15:10 I 16:20 70.0011_0.1411_32.11 200 - 150 11.9 16:20 18:30 130.0011_0.0911_48.61 150-100 I 14.1 18:30121:40 190.00 0.07 59.96 Average T- Value T- Value Hole 3 = (T2) 47.53 3.3(b) Surface Percolation Test for Soil Step 1: Test Hole Preparation Percolation Test Hole 1 2 3 Depth from ground surface to top of hole (mm) Depth from ground surface I 40011 40011 400 to base of hole (mm) Depth of hole (mm) 400 400 400 Dimensions of hole [length x breadth (mm)] I 290 x 280 280 x 280 290 x 270 Step 2: Pre -Soaking Test Holes Pre-soak start Date Time 2nd pre-soak Date start Time 08 -Jun -2026 16:35 09 -Jun -2026 15:05 08 -Jun -2026 16:35 09 -Jun -2026 15:05 Each hole should be pre-soaked twice before the test is carried out. Step 3: Measuring T100 1 2 3 Percolation Test Hole No. I II II I 10 -Jun -26 H 10 -Jun -26 10 -Jun -2026 Date of test Time filled to 400 mm 10:05 10:05 10:05 Time water level at 300 mm 11:15 1110 11:15 70.00 65.00 70.00 Time to drop 100 mm (T,00) e 68.33 Average T100 08 -Jun -2026 16:35 09 -Jun -2026 15:05 If T1 > 480 minutes then Surface Percolation value >90 - site unsuitable for discharge to ground If T1 ≤ 210 minutes then go to Step 4; If T100 > 210 minutes then go to Step 5; Step 4: Standard Method (where T,00 ≤ 210 minutes) Percolation Test Hole 1 2 3 Fill no. Start Finish AT (min) Start Finish AT (min) Start Finish AT (min) Time Time Time Time Time Time (at 300 (at 200 mm) mm) (at 300 (at 200 mm) mm) (at 300 (at 200 mm) mm) 1I ijj 12:4011 85.00 11:10 12:2511 75.00 11:1511 12:45 90.00 2 12:40 14:3011 110.001 I 12j 14:2011 115.00 12:45[14:4011 115.00 3 Average AT 14:30 17:4011 190.00 14:20 17:2011180.00114:40 123.33 17:45 185.00 130.00 128.33 Value Average AT/4 = [Hole No.1] 32.081(T1) Average AT/4 =___________ [Hole No.2] j 30.83 (T2) Average AT/4 = [Hole No.3] I 32.501(T3 Result of Test: Surface Percolation Value = 31.81 (min/25 mm) Comments: 'he topsoil at this site is of fair quality and may be used to form a raised mound soil percolation area to polish treated effluent from an advanced treatment system. Step 5: Modified Method (where T,oa > 210 minutes) Percolation Test Hole No. 1 Fall of water Time Start Finish Time K. T - in hole (mm) Factor Time Time of fall = T, Value = T, hh:mm hh:mm (mins) / T,, = 4.45 =L /K. 300 - 250 8.1 I 0.00 =1 250 - 200 9.7 00 0.00 �� 200- 150I11.911� 0.0011� 150- 100 14.1 �� 0.00 �� Average I T- Value Percolation Test Hole No. 3 T- Value Hole 1 = (Ti) I 0.00 Fall of water Time Start Finish Time K,, T- in hole (mm) Factor Time Time of fall = T, Value = T, hh:mm hh:mm (mins) / T,� = 4.45 =L /K,, 300 - 250 I 8.1 0.00 l � 250 - 200 9.7 =0 0.00 � �______ 200-150 � 11.9 = 0.00 150-100 � 14.1 == 0.00 � Average I T- Value T- Value Hole 3 = (T2) 0.00 Percolation Test Hole No. 2 Fall of water Time Start Finish Time K,, T — in hole (mm) Factor Time Time of fall = T, Value = T, hh:mm hh:mm (mans) / T = 4.45 = m /K„ 300 - 250 8.1 0= 0.0011 250 -200 9.7 00 0.00 l _____ 200-150 11.9 _= 150-100 14.1 = 0.00 � � Average I T- Value T- Value Hole 2 = (T2) 0.00 Result of Test: Surface Percolation Value = o.00 (min/25 mm) Comments: Integrate the information from the desk study and on -site assessment (i.e. visual assessment, trial hole and percolation tests) above and conclude the type of system(s) that is (are) appropriate. This information is also used to choose the optimum final disposal route of the treated wastewater. Slope of proposed infiltration / treatment area: I 1:18 Are all minimum separation distances met? Depth of unsaturated soil and/or subsoil beneath invert of gravel .90 (or drip tubing in the case of drip dispersal system) Percolation test result: Surface: 31.81 Not Suitable for Development Identify all suitable options Septic tank system (septic tank and percolation area) (Chapter 7) Secondary Treatment System (Chapters 8 and 9) and soil polishing filter (Section 10.1) No Yes 3. Tertiary Treatment System and Infiltration / Yes treatment area (Section 10.2) Sub -surface: 45.27 Suitable for Development ✓0 Discharge Route' Groundwater Propose to install: Secondary Treatment System and soil polishing filter and discharge to: Ground Water jj Q Invert level of the trench/bed gravel or drip tubing (m) 0.60 Site Specific Conditions (e.g. special works, site improvement works testing etc. Mechanical aeration system and a raised mound soil polishing filter measuring 1.0m in height to be installed and constructed to EPA 2021 specifications. The raised mound is required due to the high clay content in the subsoil. The raised mound shall be made up of the insitu topsoil. I recommend 60m of percolation trench in the soil polishing filter consisting of 6 lengths of trench each measuring 1 Om. The invert of the percolation trenches should be at 0.6m with 0.9m pervious unsaturated soil below to ensure proper polishing of the final effluent. The raised percolation area shall measure 13m x 13m and may be landscaped into the contours of the site. Ensure that the final effluent from the mechanical aeration system is distributed evenly to each of the six percolation trenches. It is important to ensure that the percolation trenches and related pipe work are put in at the correct slope. A surface water drain measuring 1 m deep shall be employed (min 2m away) up -slope from the raised mound soil polishing filter to divert surface water away from the percolation area and to prevent the water table rising in wet weather. NOTE: It is very important to ensure that the aeration pump remains on at all times on the mechanical aeration system or otherwise the system will revert to septic conditions causing odors and poorer quality effluent which may lead to clogging of the percolation trenches. A discharge of sewage effluent to "waters" (definition includes any or any part of any river, stream, lake, canal, reservoir, aquifer, pond, watercourse or other inland waters, whether natural or artificial) will require a licence under the Water Pollution Acts 1977-90. Refer to Section 2.4. . SYSTEM TYPE: Septic Tank Systems (Chapter 7) I Tank Capacity (m') Percolation Area Mounded Percolation Area No. of Trenches No. of Trenches 6.00 Length of Trenches (m) Length of Trenches (m) r 10.00 Invert Level (m) Invert Level (m) 0.60 SYSTEM TYPE: Secondary Treatment System (Chapters 8 and 9) and polishing filter (Section 10.1) Secondary Treatment Systems receiving septic tank effluent Packaged Secondary (Chapter 8) Treatment Systems receiving raw wastewater (Chapter 9) Media Type Area (m2)* Depth of Filter Invert Level Type Sand/Soil �� BAF TREATMENT SYSTEM Soil I Capacity PE 16 Constructed Wetland i P Sizing of Primary Compartment Other 2.901 m3 Polishing Filter*: (Section 10.1) Surface Area (m2)* 30.00 Option 3 - Gravity Discharge 60.00 Trench length (m) Option 1 - Direct Discharge Surface area (m2) Option 4 - Low Pressure Pipe Distribution Option 2 - Pumped Discharge Trench length (m) Surface area (n -t2) 0 Option 5 - Drip Dispersal Surface area (m2) SYSTEM TYPE: Tertiary Treatment System and infiltration / treatment area (Section 10.2) Identify purpose of tertiary Provide performance information Provide design information treatment demonstrating system will provide required treatment levels DISCHARGE ROUTE: Groundwater �✓ Hydraulic Loading Rate .* (I/m2.d) I 30.001 Surface area (m2) I 30.00 Surface Water ** Discharge Rate (m3/hr) I 0.041 * Hydraulic loading rate is determined by the percolation rate of subsoil ** Water Pollution Act discharge licence required QUALITY ASSURANCE: Installation & Commissioning System to be signed off by a suitably qualified person and recommendations in section 5.0 to be adhered to. Package treatment system must conform to EN 12566-3 standard. Package treatment system to be properly installed and certified by company supplying the system in accordance with the EPA 2021 code of practice. Keep records of desludging for five years. On -going Maintenance Desludge tank as recommended by manufacturer and periodically inspect the system for damage or surface ponding. Maintenance contract to be agreed by company supplying the package treatment system and contract must be adhered to so as to ensure that the system continues to function properly. Company: lBio1ab8 I Prefix: Mr 0 First Name: Michael j Surname: IHolohan Address: ITERERA, SCOTSTOWN, CO. MONAGHAN Qualifications/Experience: IG51 / EPA CERTIFIED Date of Report: 12 -Jun -2026 Phone: 0868169162 E-mail biolabsirl@outlook.com Indemnity Insurance Number: I _ RPI-IE000946-00 �Jj Signature: _ ___.4-!`! _ _ VULNERABILI1[V V,OMV BEDROCK DMSSL C) WELLS AND BOREHOLES ADJACENT TO THE SITE LJ Public Supply Source Protection Areas SI-Inner Protection Area SO -Outer Protection Area SOURCE PROTECTION DATA (N/A) RIVERS AND LAKES AQUIFER CATEGORY Lm a, \'c - :<: ,// • , .' ', .,.. ,p/ : / '\ 1 L I. -i-- — - - S / a,, ' / - 'h' I '.'..- t-• 1 ,. Its '• r: 1¶,r -•�'ti _. . // r i l• i• a 2\% - - . _I-( 'a- j" \c__ .:__ ./ :.. •' a- ' : -:: B ' 2 9 4J, P r, r L • i '� :---• H------... L 103 a --"__.\\\" J "Der'I \ \ 164\ t t j fl,) d __ I 1 ' 115 ,fl 3 +; t * + E l4 AERIAL VIE\A/ OF PERCOLMHON Sh E TN PELCI C�D�7v Loc=11L SKETCH OF PERCOLATION AREA INCLUDING SITE SURROUNDS `. r: sil `5-►, t♦�y k "a` »� c .,Y�� � .57th % p. ♦: F r 1 ''1. , . `J�tiiGi ?n�rfy ; N y 3 a VIEWS OF PERCOLATION SITE TRIAL HOLE ON DAY OF EXCAVATION i a, TRIAL HOLE TWO DAYS AFTER EXCAVATION `(ti�``���e:�`..•..�.' _ ,��� 'r" �,� Y ?'�` - ..- 'r;�„i4�YN �f^ � / �•.�y�_ ' z j . r�v� n'� it ,Yj „ _'�'.� _' � IS`c��A� .. 147#+2; . - ►•., 4.'� ry' Ti T2 �[ a q , s,T, K ji�r:'. r„Ie qt' r t. T TEST HOLES T3 P1 f �� _x '� �jr •�C'� _'C f. P TEST HOLES P2 OUTLINE SPECIFICATIONS FOR MOUNDED SOIL POLISHING FILTER 1. Treated effluent from the mechanical aeration sump unit shall be pumped intermittently or fed by gravity if the levels allow to the distribution chamber on the mound feeding the 6 percolation trenches. The raised mound shall be 1.0m in height throughout its area and consist of the topsoil from the site. The mound shall measure 13m x 13m. 2. The slope of the percolation trenches from the distribution chamber shall be 1 in 200 3. The length of each of the 6 percolation trenches shall be 10m. Total length 60m. 4. The separation distance between the percolation trenches shall be 2m (ie 2.5m centre to centre) 5. Percolation pipes shall be 100mm diameter smooth wall uPVC sewer pipes, perforated at 4, 6 and 8 o'clock. Perforations shall be 8mm diameter, at 75mm centre's along the pipe. Holes shall be checked before installation to ensure they are free from debris. 6. The width of each percolation trench shall be 500mm. 7. The depth of each percolation trench shall be 600mm below the mound surface. 8. Percolation pipes shall be laid on a 250mm bed of washed gravel, having particles in the range of 8 - 32mm. 9. Pipe surround shall be washed gravel, having particle size in the range 8 - 32mm. 10. Pipe cover shall be 150mm depth of washed gravel, having particle size in the range of 8 - 32mm. 11. Geotextile layer to be placed on top of this followed by 100mm topsoil to top of mound. 12. Geotextile shall be in accordance with EN ISO 10319. Access / inspection points and vents shall be provided for the ends of the percolation pipes. Covers shall be visible and installed to prevent the ingress of water. They shall be suitable for rodding and scouring purposes. 13. A surface land drain 1m deep shall be employed upslope of the raised mound soil polishing filter and not closer than 2m to divert surface water away from it and stop the water table rising in wet weather. SCHEDULE OF SITE SEPARATION DISTANCES PACKAGE TREATMENT SYSTEM . Minimum distance to any dwelling = 7m . Minimum distance to site boundary = 3m . Minimum distance to trees = 3m . Minimum distance to roads = 4m . Minimum distance to slope breaks = 10m . Minimum distance to watercourse / streams = 10m . Minimum distance to soakaway = 10m . Minimum distance to open drain = 10m . Minimum distance to lake or foreshore = 50m ble 6.3 EPA Code of Practice 2021 POLISHING FILTER . Minimum distance to any dwelling = 10m . Minimum distance to site boundary = 3m . Minimum distance to trees = 3m . Minimum distance to roads = 4m . Minimum distance to slope breaks = 10m . Minimum distance to water course / stream = 10m . Minimum distance to soakaway =10m . Minimum distance to open drain = 10m . Minimum distance to lake or foreshore = 50m . Minimum distance to up gradient well = 15m . Minimum distance well on same level = 30m Minimum distance to down gradient well = 40m able 6.31 EPA Code of Practice 2021 unless stated otherwise GEOTEXTILE LAYER TOPSOIL 100MM 150MM WASHED STONE ABOVE PIPE O 100MM PIPE 250MM WASHED STONE BELOW PIPE SUITABLE SUBSOIL MINIMUM 0.9M Water table EACH TRENCH 500MM WIDE 0.6M INVERT OF TRENCH MOUNDED TOPSOIL I.0M GROUND LEVEL SECTION THROUGH MOUNDED SUBSOIL PERCOLATION SYSTEM