HomeMy WebLinkAbout2660301 - Report Received from Internal Staff - EnvironmentENVIRONMENTAL REPORT
To: Martina Smith (Environment Section – A/Executive Scientist).
From: Peter Deery (Environment Section – Water Team).
Re: 26/60301 Mary McKenna.
Permission: Permission to remove thatch and dormer windows to existing roof of single storey
dwelling house and replace with slate, elevational changes, existing entrance and
sewerage connection and all associated site works.
Location Mullaghmore West, Ballinode, Co. Monaghan.
Date: 21/08/2026
Background
The proposed development is located on a regionally important aquifer in an area of moderate
groundwater vulnerability. The development site is located within the Finn [Monaghan]_SC_010 and
the Blackwater [Monaghan]_SC_010 subcatchments. The site is within the Magherarney_010
subbasin, which has been assigned Poor status under the Water Framework Directive status (2019 -
2024) with an objective of Restore. The site is also located on the Blackwater (Monaghan)_020 sub-
basin which has been assigned Good status under the Water Framework Directive status (2019 - 2024)
with an objective of Protect. A Water Protection Plan checklist has been submitted as part of the
application.
The application states that foul water will discharge to the public sewer via an existing connection.
The application states that storm water will discharge to the public storm sewer via an existing
connection. The site layout plan has not demonstrated the surface and foul water pipelines.
Recommendation
I have no objection to planning subject to the following conditions:
a) One month prior to the commencement of the development, the applicant shall submit a fully
completed Water Protection Plan checklist.
b) One month prior to the commencement of the development, the applicant shall submit a
revised site layout plan, scale 1:500, demonstrating the following:
- All surface/storm water drainage systems (outlined in blue).
- The directional flow of all surface water pipelines.
- All associated discharge points and outfalls.
- All foul water drainage systems (outlined in red).
c) One month prior to the commencement of the development, the applicant shall submit a
Construction and Demolition and By-Products Waste Management Plan for the proposed
development works. The plan shall be prepared using “Best Practice Guidelines for the
preparation of resource & waste management plans for construction and demolition projects”
– EPA, 2021.
d) Any construction and demolition waste or excess soil generated during the construction phase
which cannot be reused on site in accordance with Section 3 (1)(c) and Section 39 (1) of the
Waste Management Act 1996 as amended, shall be disposed/recovered at an appropriately
permitted facility in accordance with the requirements of the Waste Management Act 1996
as amended using authorised waste collectors authorised to collect the type of material for
disposal/recovery at authorised treatment facilities.
e) Facilities shall be provided for the collection and segregation of recyclable waste.
Wastes shall be collected for recycling/reuse whenever feasible or otherwise disposed of
in accordance with the Waste Management Act 1996 as amended.
f) The applicant shall ensure completely separate foul and surface water drainage systems are
in place.
g) The applicant shall ensure that adequate measures and precautions are in place for the
construction phase to ensure there is no discharge of polluting matter/sediment laden waters
discharging from the site to any watercourse. These measures shall take account of the
Guidance produced by Inland Fisheries Ireland titled “Requirements for the Protection of
Fisheries Habitat during Construction and Development Works at River Sites”, available to
download at https://www.fisheriesireland.ie/documents/624-guidelines-on-protection-of-
fisheries-during-construction-works-in-and-adjacent-to-waters/file.html
h) Monaghan County Council and Inland Fisheries Ireland shall be informed immediately of an
accidental spillage of sediment laden waters, fuel, machine oil or any polluting discharge
which may threaten the quality of any watercourse or groundwater body.
i) Any fuels, oils, greases, hazardous liquid wastes, and hydraulic fluids within the site area shall
be stored on site, away from any watercourses in a bunded, leak-proof, and lockable storage
area. Note that bunds are to be designed to contain 110% of the capacity of the largest storage
container located within the bund. There shall be no overflow drain facility from any bunds
on site and all filling and off-take points shall be located within a bund.
j) Material storage, fuel handling, parking areas and other yard activities shall be managed in a
manner which prevents the discharge of polluting matter to ground or surface water.
Signed: Date: 21/08/2026
Peter Deery
A/Senior Executive Technician
Approved By: Date: 21/08/26