HomeMy WebLinkAbout2660168 - Notification of Decision
21/08/2026
Ref No: 26/60168
TO: Pauric McMahon & Danielle Daly
C/O Patrick Ruxton
Corgreagh
Shercock
County Monaghan
A81 PW32
Re: Planning and Development Act 2000 (as amended)
NOTIFICATION OF DECISION
Monaghan County Council has by order dated 21/08/2026 decided to GRANT permission to the above
named for development of land, in accordance with the documents submitted namely for:- permission
to erect a dormer dwelling, treatment plant, percolation area, new entrance and all associated site
works at Beagh (DED Bellatrain), Lough Egish, Castleblayney Co Monaghan, subject to the 5 condition(s)
set out in the Schedule attached.
Signed on behalf of Monaghan County Council
________________________________________
ADMINISTRATIVE OFFICER
___________________________
DATE
Provided there is no appeal against this DECISION a grant of planning permission will issue at the
end of four weeks (see footnote).
NO WORKS CAN COMMENCE ON FOOT OF A ‘NOTIFICATION OF DECISION’ ON AN APPLICATION.
THE DEVELOPMENT IS ONLY AUTHORISED WHEN A ‘NOTIFICATION OF FINAL GRANT’ IS ISSUED.
pp
21 / 08 / 2026
Footnote:
An appeal against a decision of a Planning Authority under the Planning and Development Act 2000 (as
amended) may be made to An Coimisiún Pleanála, 64 Marlborough Street, Dublin 1, D01 V902. (Tel.
(01) 8588100) during office hours.
1. You have four weeks beginning on the date the planning authority makes its decision which
was 21/08/2026. This is a strict time limit.
2. You must put your appeal in writing (either typed or handwritten).
3. You must clearly state your own name and address. If someone is acting for you, like a planning
agent they must clearly state their own name and address as well as your name and address.
4. You must give enough details to allow An Coimisiún Pleanála to identify the application you
wish to appeal.
5. You must provide your planning grounds of appeal (reasons and arguments) for your appeal
and any items you wish to support your grounds of appeal.
6. If you are a third party, you must include the written acknowledgement given to you by the
planning authority to confirm it received your submission at planning application stage.
7. You must pay the correct fee.
For more information on how to make an appeal see www.pleanala.ie
26/60168 Pauric McMahon & Danielle Daly, Beagh (DED Bellatrain), Lough Egish, Castleblayney
Co Monaghan
1. (a) The developer shall pay to Monaghan County Council a sum of €1270 in accordance
with the General Development Contribution Scheme 2021-2026 made by the Council
under Section 48 of the Planning and Development Act 2000 (as amended), towards
expenditure incurred or proposed to be incurred by the Council in the provision of
community, recreation and amenity public infrastructure and facilities in the area.
(b) The sum attached to this condition shall be revised from the date of the grant of
planning permission to the value pertaining at the time of payment in accordance with
the Wholesale Price Index for Building and Construction (Materials and Wages).
(c) No works shall commence until payment of the development contribution is made in
full, or until Monaghan County Council has agreed in writing to a schedule of phased
payments of the sum.
Reason: It is considered appropriate that the developer should contribute towards the
expenditure incurred or proposed to be incurred by the Council in the provision of
community, recreation and amenity infrastructure and facilities in the area.
2. (a) Only that applicable portion of the roadside hedgerow, which must be lowered or
uprooted to provide adequate sight distances, shall be removed.
(b) Remaining mature trees and hedgerow defining the site boundary shall be
permanently retained in this development. They shall also be reinforced with
additional planting as per the submitted landscaping details and protected from
damage at all times, particularly during building operations.
(c) Notwithstanding the submitted landscaping details, any new site and roadside
boundaries shall be planted with native hedgerow species so as to ultimately form
naturalised hedgerows similar to existing hedgerows in the vicinity. Predominant
species shall be whitethorn, with blackthorn, hazel and holly also included. Planting
shall be in a double staggered row with eight 2-3 year old plants per metre; 250mm
apart, with 300mm between rows.
(d) Hedgerow planting, as required, shall be supplemented as per the submitted
landscaping details with native tree species at irregular intervals. Species shall include
oak, sycamore and beech.
(e) Planting as required shall be carried out in the first planting season following
commencement of building operations and shall be permanently retained thereafter.
Any plant which fails shall be replaced. Trees shall be allowed to mature and shall not
be topped when trimming hedgerows.
(f) Any boundary fencing shall be of stained wood.
Reason: In the interest of visual amenity.
3. (a) Prior to any other works commencing, visibility splays of 50m, measured to the
nearside road edge in each direction, shall be provided from a point in the centre of
the entrance 2.4m from the road edge at a height of between 1.05m and 2m above
ground level to an object height of between 1.05m and 2m above ground level in both
directions. The visibility splays shall be retained and kept clear from obstructions
thereafter.
(b) Where it is necessary to remove hedges, fences, embankments or other obstructions
in order to achieve the required visibility splays, they shall be reinstated behind the
visibility splays. Any new trees or shrubs shall be planted back from the visibility splays
to allow for future growth and some species will require additional set back. All
existing planting shall be kept trimmed behind visibility splays.
(c) Where the existing roadside hedge/embankment is to be removed, the roadside verge
shall be widened (by grading back or infilling where necessary using appropriate inert
material) to include the entire area within the visibility splays, top soiled, and grassed
to the satisfaction of the Planning Authority.
(d) The new entrance shall form a bellmouth of 4m radius with edge of new boundary.
Recessed entrance shall be of sufficient dimensions to contain a stationary vehicle off
the public road. Entrance gates shall open inwards only.
(e) Entrance/access road shall be surfaced with concrete or bitmac from edge of public
road for a minimum of 5m and the surface shall be graded back so that its level at 3m
from the edge of the carriageway is a minimum of 100mm below road level. Gradient
of access road shall be not greater than 1:20 (5%) for the first 5m from boundary and
1:10 (10%) thereafter.
(f) French drain consisting of 300mm diameter concrete pipes backfilled to ground level
with suitable granular filter material shall be placed along full site frontage. Drain shall
discharge to the nearest appropriate watercourse or drainage pipeline. Suitable gullies
shall be placed at start, end and intersection of other drains and at not greater than
40m intervals. Separate application shall be made to Monaghan County Council if this
requires a road opening licence.
(g) Cattlegrid/ACO Drain/gullies shall be installed at proposed entrance and constructed
in such a manner as to prevent water from the entrance flowing onto the public road.
Similarly, measures shall be taken to prevent road surface water from flowing onto the
entrance. The discharge from the above drainage shall be piped to an appropriate
drainage pipeline or watercourse.
(h) Provision shall be made within the site for surface water drainage and no surface
water shall be allowed flow onto the public roadway. The discharge of surface water
from the public road onto the site through road surface drainage and road subsoil
drainage shall remain unimpeded.
(i) No development exempt or otherwise shall be erected over the public sewer, drain or
water-main, unless otherwise agreed in writing with the Planning Authority.
(j) Before any work is commenced on this development a security, by way of a cash
deposit, in the sum of €2250, shall be paid to the Planning Authority by the developer
to ensure the satisfactory completion of all surface water drainage/boundary work
within and abutting the site area, to prevent runoff of surface water onto the public
roadway and to ensure that no damage is caused to public roadway and any such
damage is repaired satisfactorily. Failure to carry out all entrance works to a standard
to the satisfaction of the Planning Authority will result in forfeiture of part or all of the
cash security.
Reason: In the interest of traffic/road safety.
4. (a) The proposed effluent treatment and disposal system shall be located, constructed
and maintained in accordance with the details submitted and in accordance with the
requirements of the document entitled Environmental Protection Agency Code of
Practice - Domestic Wastewater Treatment Systems (population equivalent ≤ 10),
2021. No system other than the type proposed in the application shall be installed
without the prior written agreement of the Planning Authority.
(b) A maintenance contract for the effluent treatment and disposal system shall be
entered into from the first date of occupancy of the dwelling and permanently
maintained thereafter. Signed and dated copies of the contract, which shall be for a
minimum period of three years, shall be submitted to, and agreed in writing with the
Planning Authority within two months of the installation.
(c) Surface water soakaways shall be located such that the drainage from the dwelling
and paved areas of the site shall be diverted away from the location of the polishing
filter.
(d) Within two months of the first occupation of the dwelling, the developer shall submit
a report from a suitably qualified person with professional indemnity insurance
certifying that the proposed effluent treatment and disposal system has been installed
and commissioned in accordance with the approved details and is working in a
satisfactory manner and that the polishing filter is constructed in accordance with the
standards set out in the EPA document.
(e) Proposed well shall be located a minimum of 30m uphill of proposed on-site
wastewater treatment system.
Reason: In the interest of public health and environmental protection.
5. The development shall be carried out strictly in accordance with the plans and documents
submitted on the 30/04/2026 as amended on the 30/07/2026, except as may otherwise be
required in order to comply with the above conditions.
Reason: In the interest of proper planning and sustainable development.