HomeMy WebLinkAbout2660101 - Final Grant
24/08/2026
To: Bernard Doherty
Niall Smith
Hall Street
Kingscourt
Co. Cavan
A82 K8A0
File Number - 26/60101
Planning and Development Act 2000 (as amended)
NOTIFICATION OF FINAL GRANT
Monaghan County Council has by order dated 21/07/2026 granted the above named, for
the development of land namely for:- planning permission sought for the construction of
new single storey extensions to side & front of existing dwelling, alterations to elevations
and internal layout of existing dwelling, wastewater treatment system and percolation
area, landscaping, boundaries and all associated site works, Significant further information
received relates to submitted, Soil Characterisation report, Site location map, site layout
plan , at Drumlandrick, Castleblayney, Co. Monaghan, subject to the 5 condition(s) set out
in the Schedule attached.
Signed on behalf of MONAGHAN COUNTY COUNCIL.
pp__________________________
ADMINISTRATIVE OFFICER
__________________________
DATE
I refer you to the Health and Safety Authority website www.hsa.ie for new responsibilities
for homeowners under Safety, Health and Welfare at Work (Construction) Regulations
2013.
24/08/2026
26/60101 Bernard Doherty, Drumlandrick, Castleblayney, Co. Monaghan
1.
a) The developer shall pay to Monaghan County Council a sum of €1270 in accordance with the
General Development Contribution Scheme 2021-2026 made by the Council under Section 48 of
the Planning and Development Act 2000 (as amended), towards expenditure incurred or proposed
to be incurred by the Council in the provision of community, recreation and amenity public
infrastructure and facilities in the area.
b) The sum attached to this condition shall be revised from the date of the grant of planning
permission to the value pertaining at the time of payment in accordance with the Wholesale Price
Index for Building and Construction (Materials and Wages).
c) No works shall commence until payment of the development contribution is made in full, or until
Monaghan County Council has agreed in writing to a schedule of phased payments of the sum.
Reason: It is considered appropriate that the developer should contribute towards the expenditure
incurred or proposed to be incurred by the Council in the provision of community, recreation and
amenity infrastructure and facilities in the area.
2.
a) The proposed effluent treatment and disposal system shall be located, constructed and
maintained in accordance with the details submitted and in accordance with the requirements of
the document entitled Environmental Protection Agency Code of Practice - Domestic Wastewater
Treatment Systems (population equivalent ≤ 10), 2021. No system other than the type proposed in
the application shall be installed without the prior written agreement of the Planning Authority.
b) A maintenance contract for the effluent treatment and disposal system shall be entered into from
the first date of occupancy of the remodelled dwelling and permanently maintained thereafter.
Signed and dated copies of the contract, which shall be for a minimum period of three years, shall
be submitted to, and agreed in writing with the Planning Authority within two months of the
installation.
c) Surface water soakaways shall be located such that the drainage from the dwelling and paved
areas of the site shall be diverted away from the location of the polishing filter.
d) Within two months of the first occupation of the remodelled dwelling, the developer shall submit
a report from a suitably qualified person with professional indemnity insurance certifying that the
proposed effluent treatment and disposal system has been installed and commissioned in
accordance with the approved details and is working in a satisfactory manner and that the
polishing filter is constructed in accordance with the standards set out in the EPA document.
Reason: In the interest of public health and environmental protection.
3.
a) Developer shall ensure that adequate measures are in place for the construction phase to ensure
there is no discharge of polluting matter/sediment laden waters to any watercourse or drains.
These measures shall take account of the guidance produced by Inland Fisheries Ireland (IFI).
b) Construction and demolition waste, or excess soil and stone, generated during the construction
phase that cannot be reused on-site shall be suitably disposed/recovered at an appropriately
permitted facility in accordance with the requirements of the Waste Management Act 1996 (as
amended).
Reason: In the interest of environmental protection.
4.
Proposed hedgerow planting shall be in double staggered rows with eight 2-3 year old plants per
metre; 250mm apart, with 300mm between rows. This planting shall be carried out in the first planting
season following commencement of building operations and shall be permanently retained thereafter.
Any plant which fails shall be replaced.
Reason: In the interests of visual amenity and appropriate design.
5.
The development shall be carried out strictly in accordance with the plans and documents submitted
on the 20/03/2026 as amended on the 02/07/2026, except as may otherwise be required in order to
comply with the above conditions.
Reason: In the interest of proper planning and sustainable development.
BUILDING CONTROL ADVICE NOTE
Before Any Building Works Commence - Things you should check!
1. Building Control Legal Requirements - Commencement Notice & Fire Safety Certificates (FSC);
In accordance with the Building Regulations you are obliged to submit a Commencement Notice prior to
commencement of a development and it must be submitted not less than 14 days and not more than 28 days
before you wish to commence. The Commencement Notice must be submitted to the Local Authority via the
online national portal BCMS. Applicants are advised to register on this website in advance of submitting a
commencement notice via the attached link: www.localgov.ie/en/bcms
As the type of Commencement Notice required will vary depending on your proposed development, you are
advised to seek advice from your agent or architect on what type of commencement notice is relevant to your
proposed works. Alternatively please feel free to contact Monaghan Fire & Building Control Authority for
advice at 047-30521 or email: bcms@monaghancoco.ie
Please be advised that works can not begin until the applicant has received a valid commencement notice from
the Building Control Authority, and that it is an offence under the Building Control Act 1990 to proceed with the
works without a valid commencement notice and/or a valid FSC (if required for works/development).
2. Pre-Development Conditions;
If there are any Pre-Development conditions on the schedule of conditions attached to your permission you
should give your immediate attention to them prior to the commencement of your development.
N.B. All conditions must be complied with in full as failure to do so will render your permission invalid and
may result in the initiation of enforcement proceedings for compliance with same.
3. Construction Products Regulations (SI No 225 of 2013);
You need to ensure that you, your builder, your designer/assigned certifier and your suppliers are familiar with
the requirements of the Construction Products Regulations.
For more information, please see link provided below.
https://monaghan.ie/firebuildingcontrol/building-control-construction-products-regulation/
4. Responsibilities under the Safety, Health and Welfare at Work (Construction) Regulations 2013;
The regulations are to ensure that there is a safe working environment for all involved in the construction
works, including dwellings.
For more information;
http://www.hsa.ie/eng/Publications_and_Forms/Publications/Construction/Guide_for_Homeowners.html