HomeMy WebLinkAbout2660289 - Chief Executives OrderMONAGHAN COUNTY COUNCIL
PLANNING AND DEVELOPMENT ACT 2000 (as amended)
Chief Executive's Order No
Reference Number
Name of Applicant
Address:
P870-26
26/60289
Seamus & Kevin Hall
Stephen Moffett
Corlea
Ballybay
Co. Monaghan
A75 EK26
Nature of Application: Planning permission to extend existing cattle shed. Extension to
include livestock accommodation, milking facility, dairy & other
ancillary spaces; along with vertical feed silo, underground slurry
storage tank, dairy washings tank & other associated ancillary site
works
Location of Development:
nRrH R•
Moyles (DED Rackwallace)
Castleshane
Co. Monaghan
I hereby decide, pursuant to the provisions of the Planning and Development Act 2000 (as amended)
and the Planning and Development Regulations 2001 (as amended) to grant permission for the above
development in accordance with documents submitted, subject to the 7 condition(s) set out in the
Schedule attached hereto.
I further decide that PERMISSION be granted subject to the same conditions on the expiration of the
period for the taking of an appeal to An Coimisiun Pleanala against this decision if there is then no
appeal before An Coimisiun Pleanala.
Adrian Hughes
SENIOR PLANNER
26
Date
26/60289 Seamus & Kevin Hall Moyles (DED Rackwallace), Castleshane, Co. Monaghan.
1.
a) The developer shall pay to Monaghan County Council a sum of €552.00 in accordance with the General
Development Contribution Scheme 2021-2026, made by the Council under Section 48 of the Planning
and Development Act 2000 (as amended), towards expenditure incurred or proposed to be incurred by
the Council in the provision of community, recreation and amenity public infrastructure and facilities in
the area.
b) The sum attached to this condition shall be revised from the date of the grant of planning permission to
the value pertaining at the time of payment in accordance with the Wholesale Price Index for Building
and Construction (Materials and Wages).
c) No works shall commence until payment of the development contribution is made in full, or until
Monaghan County Council has agreed in writing to a schedule of phased payments of the sum.
Reason: It is considered appropriate that the developer should contribute towards the expenditure
incurred or proposed to be incurred by the Council in the provision of community, recreation and amenity
infrastructure and facilities in the area.
2.
a) Prior to the commencement of the development, the applicant shall submit to the Planning Authority a
Construction and Demolition Resource Management Plan for the proposed development works for
agreement in writing. The plan shall be prepared using 'Best Practice Guidelines for the preparation of
resource & waste management plans for construction and demolition projects' (EPA, 2021).
b) No development shall commence until the information required under a) above has been agreed in
writing with the Planning Authority.
c) All works shall be carried out in accordance with the agreed Construction and Demolition Resource
Management Plan.
Reason: In the interest of environmental protection.
3.
a) The development/facility shall be operated in accordance with the European Union (Good Agricultural
Practice for Protection of Waters) Regulations 2025.
b) The development hereby approved will comply with the following drainage arrangements;
(i) Contaminated surface water run-off shall be disposed of directly in a sealed system.
(ii) All soiled waters shall be directed to a storage tank.
(iii) No effluent or slurry shall discharge or be allowed to discharge to any stream, river, watercourse,
groundwater body or to the public road.
(iv) All uncontaminated roof water from buildings and yard water shall be separately collected and
discharged in a sealed system to existing drains, streams or adequate soakpits and shall not
discharge or be allowed to discharge to the foul effluent drains, foul effluent and slurry storage tanks
or to the public road
c) All organic fertiliser generated by the development hereby approved [and existing development within
the farmyard] shall be conveyed through properly constructed channels to the proposed [and existing]
storage facilities and shall not discharge or be allowed to discharge to any stream, river, watercourse,
groundwater body or public road. 22 weeks storage capacity for organic fertiliser must be provided to
serve the enterprise.
d) All organic fertiliser generated by the proposed development shall be utilised in accordance with the
details submitted to the Planning Authority and in accordance with the European Union (Good
Agricultural Practice for Protection of Waters) Regulations 2025.
e) Any construction and demolition waste or excess soil generated during the construction phase which
cannot be reused on site in accordance with Section 3 (1)(c) and Section 39 (1) of the Waste
Management Act 1996 as amended, shall be disposed/recovered at an appropriately permitted facility
in accordance with the requirements of the Waste Management Act 1996 as amended using authorised
waste collectors authorised to collect the type of material for disposal/recovery at authorised treatment
facilities.
f) If infilling material is required to be imported onsite the applicant shall conform to one of the following;
(i) If utilising EPA Article 27 notification to move soil infill material from one site to another, official
correspondence from the EPA granting approval shall be submitted to the Planning Authority prior
to commencement of development.
or
(ii) If using waste material as infill, a valid permit must be obtained from Monaghan County Council
under the Waste Management (Facility Permit and Registration) Regulations 2007 as amended prior
to acceptance of material.
or
(iii) If buying topsoil material as a product for final landscaping purposes only, documentation
demonstrating purchase shall be submitted to Planning Authority.
g) All waste oils and any other hazardous waste materials shall be stored appropriately and collected,
recovered, or disposed of in accordance with the Waste Management Act 1996 as amended, and records
of such shall be kept on site.
(i) All hazardous liquid waste or oil/fuel storage containers, temporary or otherwise, shall be bunded.
(ii) All bunds will be designed to contain 110 % of the capacity of the largest storage container located
within the bund.
(iii) There shall be no overflow drain facility from any bunds on site and all filling and off- take points
shall be located within a bund.
(iv) Facilities shall be provided for the collection and segregation of recyclable waste. Wastes shall be
collected for recycling/reuse whenever feasible or otherwise disposed of in accordance with the
Waste Management Act 1996 as amended
h) The applicant shall immediately inform the Planning Authority & Inland Fisheries Board of an accidental
spillage of wastewater, organic fertiliser, fuel, machine oil or any other substance which may threaten
the quality of any watercourse or groundwater body.
i) The applicant shall ensure that adequate measures are in place for the construction phase to ensure
there is no discharge of polluting matter/sediment laden waters to any watercourse. These measures
shall take account of the Guidance produced by Inland Fisheries Ireland titled "Requirements for the
Protection of Fisheries Habitat during Construction and Development Works at River Sites". This
document is available to download at https://www.fisheriesireland.ie/documents/624-guidelines-on-
protection-of-fisheries-during-construction-works-in-and-adjacent-to-waters/file.htmI (Guidance).
Reason: In the interest of environmental protection and public health.
4
There shall be no increase in the number of livestock being accommodated at this site unless otherwise
agreed with in writing by the Planning Authority and in accordance with an approved Nutrient Management
Plan.
Reason: In the interest of orderly development.
5.
All sheds, slatted units, dairy parlours, silage pits and manure storage areas shall be designed and built in
accordance with Department of Agriculture, Food & the Marine specifications.
Reason: In the interest of orderly development.
a) Roofing material shall be dark green, dark grey, dark blue or black in colour unless otherwise agreed in
writing.
b) No unpainted metal sheeting shall be used for roofing or on the external finish of the structure
Reason: In the interest of visual amenity
7. The development shall be carried out in accordance with plans and documentation submitted on
08/07/2026, except as may otherwise be required in order to comply with the above conditions.
Reason: In the interest of orderly development
W \ e3% o2. 2z≤
Adrian Hughes Date
Senior Planner